Water_Conserv_II_WRF_EQ_Pump_Station_Rebid_Drawings.pdf
PDF 15 MB Posted
- Solicitation number
- IFB26-0520
- Issued by
- Orange County, Orlando City, Florida
About this file
These are design drawings and specifications for the Water Conserv II Water Reclamation Facility (WRF) Equalization Pump Station Improvements project in Orlando, Florida, prepared by Hazen and Sawyer engineering firm for the City of Orlando Department of Public Works. The project involves demolition and modification of an existing equalization pump station structure, including selective concrete demolition, structural repairs, installation of new mechanical and electrical systems, HVAC components, and architectural modifications to the facility. The sealed bid solicitation (IFB26-520) is due on Thursday, August 20, 2026, with drawings issued for bid in June 2026. The project is located at the Water Conserv II WRF facility on the City's McLeod Road Water Pollution Control Plant property. Key construction constraints include 24-hour facility operations requiring advance notice for after-hours work with a minimum 7-business-day notice requirement, strict material storage and security protocols, and completion of all work under a maximum 2-hour service downtime window for any pipeline transfers. Construction is restricted to 7:00 AM to 3:30 PM Monday through Friday, excluding City holidays, unless otherwise approved.
The contract documents establish comprehensive requirements for contractor compliance including verification of all existing utility locations through manual or non-destructive excavation methods within 14 days of construction start, maintenance of bypass pumping operations 24 hours per week throughout construction, and submission of a detailed sequence of construction plan for approval 14 days prior to site mobilization. All piping must achieve 95 to 98 percent compaction density depending on location, with hydrostatic pressure testing at 200 PSI for potable water and 150 PSI for reclaimed water lines, and force main pressure testing at 100 PSI minimum for two hours. The contractor is responsible for all costs associated with utility damage, temporary drainage, dewatering, erosion control, and restoration of disturbed areas. A complete set of as-built drawings with accurate layout, sizing, and state plane coordinates sealed by a Florida licensed surveyor must be submitted before the new system is allowed into service. The project engineer is Kristina L. Fries, P.E., and the City Project Manager contact information and emergency notification procedures for main breaks and electrical issues are detailed in the specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-00-01
CITY OF ORLANDO
WATER CONSERV II WRF
DEPARTMENT OF PUBLIC WORKS
EQUALIZATION PUMP STATION IMPROVEMENTS
JUNE 2026
ISSUED FOR BID
PROJECT NO.: WAS0063_P
LOCATION MAP
NOT TO SCALE
TURNPIKE
FLORIDA
RD.
McLEOD
R D
LA
KE
TU
R
KE
Y
IN
TE
RSTA
TE
VI
NEL
AN
D R
D.
CORY RD.
KI
R
KM
AN
R D
CAIN
LAKE
TURKEY LAKE
MANN
LAKE
LAKE
CLEAR
CATHERINE
LAKE
AMERICANA BLVD.
L.B.
BUDDY DYER
MAYOR
COREY F. KNIGHT, P.E.
DIRECTOR OF PUBLIC WORKS
CHRISTOPHER ANDRES, P.E
WATER RECLAMATION DIVISION MANAGER
KRISTINA L. FRIES, P.E.
PROJECT MANAGER
JIM GRAY
COMMISSIONER DISTRICT 1
TONY ORTIZ
COMMISSIONER DISTRICT 2
ROBERT F. STUART
COMMISSIONER DISTRICT 3
PATTY SHEEHAN
COMMISSIONER DISTRICT 4
SHAN ROSE
COMMISSIONER DISTRICT 5
BAKARI F. BURNS
COMMISSIONER DISTRICT 6
CITY OF ORLANDO
HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
PL
O
T D
AT
E:
5/
/2
3:
p
. m B
Y:
LE
YB
ET
H V
AL
EN
C
IA
Fi le
: C :\U
SE
R
S\
LE
YB
ET
H V
AL
EN
C
IA
\D C
\A C
C D
O C
S\ H
AZ
EN
A N
D S
AW
YE
R \4
-0
_C O
N
SE
R V
II
W
R F
EQ
P
S
FI
N
AL
D
ES
IG
N
\P R
O
JE
C T
FI
LE
S\
_D
ES
IG
N
\0 1-
H
AZ
EN
\G
EN
ER
AL
\4
-0
-G -0
S av ed b y L
EY
BE
TH
V
AL
EN
C
IA S
av e da te
: 5/
/2
5:
p
. m
B. UPRETI
M. NIEMIEC
G-00-02
GENERAL
PLANT CONSTRUCTION RULES
AND SHEET INDEXW. MARSHALL
PLANT CONSTRUCTION RULES
1. NORMAL BUSINESS HOURS ARE 7:00 AM TO 3:30 PM. HOWEVER THE FACILITY OPERATES 24
HOURS, 7 DAYS/WEEK.
2. ADVANCE NOTICE (MINIMUM 7 BUSINESS DAYS) IS REQUIRED, IF WORK IS TO BE CONTINUED
AFTER HOURS. WORK REQUESTS TO BE SUBMITTED IN WRITING FOR THE CITY APPROVAL.
3. THE MAINTENANCE SUPERVISOR, WILL BE THE PLANT CONTACT, IF THE MAINTENANCE
SUPERVISOR IS NOT AVAILABLE, THEN THE PLANT MANAGER WILL REPRESENT THE FACILITY.
4. ALL CONTRACTOR’S PERSONNEL, AND SUBCONTRACTORS, MUST OBTAIN & WEAR AT ALL TIMES A
PICTURE ID SUPPLIED BY CONTRACTOR.
5. ALL CONSTRUCTION RELATED EMPLOYEES WILL ENTER AND EXIT THROUGH THE DESIGNATED
CONSTRUCTION GATE. CONTACT THE CONTRACTOR REPRESENTATIVE FOR ENTRY.
CONTRACTOR RESPONSIBLE TO MANAGE GATE ACCESS. CONTRACTOR SHALL MANAGE ALL
UNLOADING AND MINIMIZE IMPACTING TRAFFIC. COMPANY PHOTO ID OF A VALID CONTRACTOR
OR SUB CONTRACTOR IS REQUIRED. THE CONTRACTOR REPRESENTATIVE WILL MAINTAIN A LIST
OF EMPLOYEES, SUB CONTRACTORS AND VENDORS.
6. BE SURE YOU ARE AWARE OF THE DIFFERENCE IN WATER LINES. POTABLE (DRINKING WATER)
AND RECLAIMED (REUSE WATER FROM PLANT EFFLUENT). REUSE LINES ARE ALL
MARKED/PAINTED PANTONE 522C LAVENDER.
7. NO FIREARMS, ALCOHOL, OR DRUGS ON PREMISES.
8. PLACE SIGNS SO DELIVERIES CAN BE MADE TO THE CONSTRUCTION SITE. LOCATIONS TO BE
APPROVED BY MAINTENANCE SUPERVISOR. CONTRACTOR RESPONSIBLE FOR ALL DELIVERIES.
PLANT PERSONNEL WILL NOT ACCEPT CONSTRUCTION DELIVERIES.
9. MAXIMUM SPEED LIMIT THROUGHOUT THE PLANT IS 10 MPH. FULL STOP AT ALL STOP SIGNS IS
REQUIRED. STRICTLY ENFORCED.
10. VEHICLES AND SECURITY: ALL VEHICLES WILL BE PARKED IN ASSIGNED AREAS ONLY AND SHOULD BE LOCKED AT ALL TIMES. CITY WILL NOT BE RESPONSIBLE. CONTRACTOR TO PROVIDE, AND MAINTAIN, DESIGNATED PARKING. ALL STAFF SHALL USE DESIGNATED PARKING.
11. MATERIAL STORAGE IN CONTRACTOR’S TRAILERS: THE CITY IS NOT RESPONSIBLE FOR
SECURITY.
12. CONFINE CONSTRUCTION PERSONNEL TO THE JOB SITE.
13. EMERGENCY SERVICES BY CITY OF ORLANDO POLICE AND FIRE DEPARTMENTS ARE 9-911.
14. CONSTRUCTION PERSONNEL, EXCEPT FOR EMERGENCIES, WILL NOT USE PLANT PHONES.
15. COORDINATE ALL ELECTRICAL/PIPE CONNECTIONS THROUGH MAINTENANCE SUPERVISOR OR
PLANT MANAGER.
16. GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR HIS EMPLOYEES AND SUBCONTRACTORS
EMPLOYEES FOLLOWING PLANT RULES AND VEHICULAR SAFETY. CONTRACTOR SHALL NOT
ADVERSELY IMPACT TRAFFIC FLOW. CONTRACTOR TO REQUEST APPROVAL FOR ALL CHANGES
TO TRAFFIC FLOW. CONTRACTOR TO REQUEST APPROVAL FOR ALL ROADWAY IMPACTS FOR
CONSTRUCTING THE WORK, I.E. CRANE ACCESS.
17. CONTRACTOR WILL FURNISH PORTABLE RESTROOMS. CONTRACTOR PERSONNEL WILL NOT USE
RESTROOMS IN THE PLANT.
18. THE CONTRACTOR’S PERSONNEL WILL NOT USE PLANT LUNCHROOM, FACILITIES, OR GYM.
19. A LIST OF ALL SUBCONTRACTORS WILL BE GIVEN TO THE PLANT MANAGER. CONTRACTOR
RESPONSIBLE TO MAINTAIN CURRENT LIST.
20. A LIST OF EMERGENCY PHONE NUMBERS WILL BE GIVEN TO THE PLANT MANAGER.
21. NO ONE IS ALLOWED IN THE AREA OF THE CHLORINE HANDLING FACILITY DURING CHLORINE TANK CHANGES. PLANT PERSONNEL WILL PLACE SIGNS IN STREETS DURING THESE CHANGE OUT
TIMES. PRIOR TO WORK COMMENCING AN EMERGENCY PLAN WILL BE REVIEWED WITH
CONTRACTOR. CHLORINE CHANGE OUTS AND DELIVERIES GENERALLY OCCUR WEEKLY.
ADVANCE NOTICE WILL BE GIVEN TO THE CONTRACTOR.
22. NO OPEN FIRES ON PLANT GROUNDS.
23. SMOKING IN DESIGNATED AREAS ONLY.
24. TRASH, RUBBLE, ETC. SHOULD BE REMOVED FROM THE PROJECT DAILY. DURING HURRICANE
SEASON, THE CONTRACTOR WILL BE RESPONSIBLE FOR SECURING CONSTRUCTION MATERIALS
DURING STORM EVENTS.
25. CONTRACTORS WILL SUPPLY THEIR OWN DRINKING WATER AND ICE FOR THEIR PERSONNEL.
26. THERE IS A STORM WATER POLLUTION PREVENTION PLAN IN EFFECT AT THIS FACILITY, WHICH
MUST BE FOLLOWED. CONTRACTOR SHALL NOT ADVERSELY IMPACT DRAINAGE COLLECTION.
CONTRACTOR SHALL REGULARLY MAINTAIN ALL GROUNDSKEEPING FOR STORAGE, PARKING AND
WORK AREAS.
PL
O
T D
AT
E:
/1
5/
0:
a . m
B
Y:
U
SU
AR
IO
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\4
-0
_C
O N
SE
R
V
II
W R
F
EQ
P S
FI
N
AL
D
ES
IG
N \P
R O
JE
C
T
FI
LE
S\
_D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\4
-0
-G
-0
Sa ve d by
U
SU
AR
IO
S av e da te : 6
/1 5/
0:
a
. m
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
44051-001
JUNE 2026K. BLANTON
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT No.:
HAZEN No.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
TELEPHONE NUMBERS (AFTER HOURS):
1. ELLIOT VEGAS, CHIEF OPERATOR …................................................…......... 407-509-5597
2. KEITH JORDAN, PLANT MANAGER...................................................................407-325-5653
3. LUIS RAMOS, MAINT. SUPERVISOR....………………………………................. 407-709-3778
INDEX OF DRAWINGS
DWG
NUMBER SHEET TITLE
GENERAL
G-00-01 COVER SHEET, LOCATION MAP
G-00-02 PLANT CONSTRUCTION RULES AND SHEET INDEX
G-00-03 GENERAL NOTES
G-00-04 ABBREVIATIONS AND SYMBOLS
CIVIL
C-01-01
E-10-01 EXISTING ELECTRICAL ROOM DEMOLITION &
MODIFICATION PLAN
E-10-02 BOTTOM LEVEL DEMOLITION PLAN
E-10-03 BOTTOM LEVEL EQ PUMP STATION POWER PLAN
E-10-04 BOTTOM LEVEL EQ PUMP STATION LIGHTING PLAN
E-10-05 INTERMEDIATE LEVEL EQ PUMP STATION DEMOLITION
PLAN
E-10-06 INTERMEDIATE LEVEL EQ PUMP STATION POWER
PLAN
E-10-07 INTERMEDIATE LEVEL LIGHTING PLAN
E-20-01 ELECTRICAL PANEL SCHEDULE
E-20-02 LIGHTING SCHEDULE AND DETAILS
E-20-03 ELECTRICAL DETAILS - SHEET 1
E-20-04 ELECTRICAL DETAILS - SHEET 2
INSTRUMENTATION
I001 LEGEND AND SYMBOLS
I002 EQUALIZATION PUMP STATION - EXISTING NETWORK
DIAGRAM
I003 EQUALIZATION PUMP STATION - PROPOSED NETWORK
DIAGRAM
I004 EQUALIZATION PUMP STATION - P&ID
I005 INSTRUMENTATION EQUALIZATION PUMP STATION
DETAILS
SITE PLAN
ARCHITECTURAL
A-10-01 EQUALIZATION PUMP STATION EXISTING AND
PROPOSED FLOOR PLANS
A-10-02 EQUALIZATION PUMP STATION ELEVATIONS, DETAILS
AND NOTES
STRUCTURAL
S-00-01 GENERAL STRUCTURAL NOTES - SHEET 1
S-00-02 GENERAL STRUCTURAL NOTES - SHEET 2
S-00-03 STRUCTURAL GENERAL CONCRETE REPAIR DETAILS
AND NOTES
S-99-01 STRUCTURAL STANDARD DETAILS - SHEET 1
S-99-02 STRUCTURAL STANDARD DETAILS - SHEET 2
S-99-03 STRUCTURAL STANDARD DETAILS - SHEET 3
S-99-04 STRUCTURAL STANDARD DETAILS - SHEET 4
S-10-01 BOTTOM FLOOR - DEMOLITION PLAN
S-10-02 INTERMEDIATE FLOOR- DEMOLITION PLAN AND
SECTIONS
S-10-03 TOP FLOOR - DEMOLITION PLAN AND SECTIONS
S-10-04 BOTTOM FLOOR PLANS
S-10-05 INTERMEDIATE AND TOP FLOOR PLANS
S-10-06 ENLARGED STAIR PLANS
S-10-07 ENLARGED TOP STAIR PLAN AND SECTIONS
S-10-08 STAIR SECTIONS AND DETAILS
S-10-09 DETAILS
MECHANICAL
M-10-01 EQUALIZATION PUMP STATION BOTTOM AND
INTERMEDIATE DEMOLITION PLANS
M-10-02 EQUALIZATION PUMP STATION DEMOLITION SECTIONS
M-10-03 EQUALIZATION PUMP STATION BOTTOM FLOOR
M-10-04 EQUALIZATION PUMP STATION SECTIONS
M-10-05 EQUALIZATION PUMP STATION ISOMETRIC VIEWS
M-10-06 EQUALIZATION PUMP STATION DETAILS
HVAC
H-00-01 GENERAL NOTES AND SYMBOLS
H-10-01 EQUALIZATION PUMP STATION DEMO PLAN-PUMP
STATION
H-10-02 EQUALIZATION PUMP STATION PLAN-PUMP STATION
H-10-03 EQUALIZATION PUMP STATION PLAN- PUMP STATION
SECTIONS
H-98-01 SCHEDULES & CONTROLS
H-99-01 DETAILS
ELECTRICAL
E-00-01 NOTES, SYMBOLS AND ABBREVIATION
E-00-02 OVERALL SITE PLAN
E-00-03 OVERALL SITE SINGLE LINE DIAGRAM (DEMOLITION)
E-00-04 OVERALL SITE SINGLE LINE DIAGRAM (MODIFICATION)
E-00-05 EXISTING EQ PUMP STATION MCC & FRONT VIEW
DEMOLITION
E-00-06 SWITCHBOARD '01A-SWBD' SINGLE LINE DIAGRAM
E-00-07 SWITCHBOARD FRONT ELEVATION
E-00-08 ELECTRICAL INSTRUMENTATION RISER DIAGRAM &
ELEMENTARIES
YARD PIPING PLAN - RECORD DRAWINGSREFERENCE
SHEET
G-00-03
GENERAL
NOTESW. MARSHALL
GENERAL NOTES
1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEET OF THESE CONTRACT DOCUMENTS
AS IF THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL
IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE
RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS INCLUDING LOCATION AND
DIMENSION OF ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL NOTIFY
ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND EXISTING
CONSTRUCTION BEFORE PROCEEDING WITH WORK.
3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES, TYPICAL DETAILS SHALL APPLY EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.
4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK, DETAILS
SHALL BE IN THE SAME AS FOR OTHER SIMILAR WORK.
5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE
REGULATIONS AND REQUIREMENTS.
6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW
PIPING AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THE LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA.
THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT
TIE-INCONNECTION LOCATIONS AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT
AT NO ADDITIONAL COST TO THE OWNER.
7. ALL PIPELINES SHALL HAVE A MINIMUM COVER OF 36" UNLESS THE COVER DEPTH IS
SPECIFICALLY INDICATED ON THE DRAWINGS. PIPES SHALL BE ROUTED AS SHOWN UNLESS
MINOR. REVISIONS ARE NECESSARY TO MISS EXISTING PIPES STRUCTURES. ETC. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE
ROUTING CHANGES AT NO ADDITIONAL COST TO THE OWNER CONTRACTOR SHALL INCLUDE
COST FOR THIS IN THE BID.
8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM
AVAILABLE RECORDS OR ELECTRONICS FILES, NEITHER THE OWNER NOR ENGINEER ASSUMES
ANY RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION
SHOWN. THE CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL, TYPES AND
ELEVATIONS SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF
CONSTRUCTION.
9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM DAMAGING EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE. ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY
REPAIRED OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE
CONTRACTOR'S EXPENSE WITHOUT ADDITIONAL COMPENSATION.
10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AN
SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE
CONNECTIONS. PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND
WORKING SYSTEM.
11. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE FOR QUESTIONS OR
COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES.
12. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED
PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED THROUGHOUT
CONSTRUCTION ACTIVITIES.
13. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.
WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF
OTHER PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED TO MAINTAIN SERVICE THROUGHOUT CONSTRUCTION ACTIVITIES, SEE INDIVIDUAL
PUMP STATION SHEETS REQUIRING BYPASS PUMPING FOR DETAILS.
14. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES. THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE
PLACED IN TO SERVICE DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR
SHOWN OTHERWISE.
15. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD
ELECTRICAL LINES CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRICAL CODE AND ANY
REQUIREMENT BY THE OWNER OF ELECTRIC LINES.
16. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND
FACILITIES.
17. CONTRACTOR SHALL VERIFY LOCATION OF ALL STRUCTURAL, MECHANICAL, AND ELECTRICAL
ITEMS BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE ALSO, STRUCTURAL
DIMENSIONS AND OPENING CONTROLLED BY STRUCTURAL, MECHANICAL, OR ELECTRICAL
EQUIPMENT SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
18. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER
CONTRACT DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS
INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND UTILITIES
CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT
DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.
20. ALL WORK SHALL BE COMPLETED IN ACCORDANCE TO FDEP REGULATIONS AND CITY OF
ORLANDO ENGINEERING STANDARDS.
1. MINIMUM DISTANCE OF AT LEAST 3 FEET HORIZONTALLY SHALL SEPARATE ALL POTABLE WATER MAINS FROM RECLAIMED AND STORM WATER PIPES AND MINIMUM DISTANCE OF AT LEAST 6 FEET
HORIZONTALLY FROM SANITARY SEWER PIPES OR FORCE MAINS. THE DISTANCE SHALL BE
MEASURED FROM OUTSIDE EDGE TO OUTSIDE EDGE. IF IT IS NOT PRACTICAL TO MAINTAIN A 3 FOOT HORIZONTAL SEPARATION DISTANCE BETWEEN A POTABLE LINE AND A RECLAIMED LINE, THEN THE RECLAIMED WATER MAIN SHALL BE LAID IN A SEPARATE TRENCH OR ON A SHELF OF UNDISTURBED EARTH AT LEAST 18 INCHES ABOVE THE TOP OF SEWER PIPES AND 18" BELOW POTABLE WATER PIPES, WHEN A RECLAIMED WATER MAIN PARALLELS A SEWER PIPE, AND A SEPARATION OF AT LEAST 3' CANNOT BE MAINTAINED, ALTERNATE CONSTRUCTION METHODS OR MATERIALS MAY BE
USED WITH APPROVAL OF FDEP AND THE CITY OF ORLANDO.
2. WHERE RECLAIMED WATER PIPES CROSS WATER OR SEWER PIPES, A MINIMUM VERTICAL
SEPARATION OF 18 INCHES SHALL BE MAINTAINED BETWEEN THE BOTTOM OF THE UPPER PIPE AND THE TOP OF THE LOWER PIPE, WITH THE RECLAIMED WATER ON TOP. THE CROSSING SHALL BE ARRANGED SUCH THAT THE PIPE JOINT SHALL BE EQUIDISTANT AND CENTERED ON THE CROSSING.
WHERE A RECLAIMED WATER MAIN PASSES UNDER A SANITARY SEWER OR STORM WATER SEWER,
ADEQUATE STRUCTURAL SUPPORTS SHALL BE PROVIDED FOR THE SEWER PIPE TO MAINTAIN LINE
AND GRADE. WHERE THE 18" SEPARATION IS NOT PRACTICAL, ALTERNATE CONSTRUCTION
METHODS OR MATERIALS MAY BE USED WITH APPROVAL OF FDEP AND THE CITY OF ORLANDO.
3. WHERE A RECLAIMED WATER PIPE CONFLICTS WITH AN EXISTING POTABLE WATER PIPE WITH LESS THAN 18 INCHES VERTICAL CLEARANCE, THEN THE RECLAIMED WATER PIPE SHALL BE DUCTILE IRON PIPE (DIP) AND THE RECLAIMED WATER PIPE SHALL BE ARRANGED TO MEET THE CROSSING
REQUIREMENTS DESCRIBED ABOVE.
4. CONTRACTOR SHALL INSURE THAT ALL REQUIRED PERMITS ARE IN-HAND BEFORE BEGINNING ANY
CONSTRUCTION.
5. ALL CONSTRUCTION SHALL MEET CURRENT REQUIREMENTS OF FDEP, AWWA, CITY OF ORLANDO
AND ORLANDO UTILITIES COMMISSION FOR MATERIALS OF CONSTRUCTION, DESIGN, AND
INSTALLATION.
6. ALL EXISTING UNDERGROUND UTILITIES THAT ARE ACTIVE SHALL REMAIN IN PLACE UNTIL THE NEW
FACILITIES ARE OPERATIONAL.
7. UNDER NO CIRCUMSTANCES SHALL THE ACTIVITIES OF THE CONTRACTOR OR HIS
SUBCONTRACTORS CAUSE ANY INTERRUPTIONS TO THE SERVICE OPERATION OF EXISTING
UTILITIES WITHOUT WRITTEN AUTHORIZATION FROM THE AUTHORIZED REPRESENTATIVE.
8. CONTRACTOR SHALL NOTIFY THE VARIOUS UTILITIES AND TO MAKE THE NECESSARY
ARRANGEMENTS FOR ANY RELOCATION OF THESE UTILITIES, WITH THE OWNER OF THE UTILITY, PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL INSURE THAT THE UTILITY OWNERS AND THE CITY OF ORLANDO PROJECT MANAGER ARE PROPERLY NOTIFIED OF
ANY TEMPORARY DISRUPTION OF SERVICE AT LEAST 1 WEEK IN ADVANCE.
9. AT LEAST 14 DAYS BEFORE CONSTRUCTION, THE CONTRACTOR SHALL, VERIFY ALL EXISTING PUBLIC AND PRIVATE UTILITY LOCATIONS IN THREE DIMENSIONS AT EACH PROJECT SITE. THE
CONTRACTOR SHALL UTILIZE MANUAL OR NONDESTRUCTIVE (E.G., VACUUM EXCAVATION)
METHODS TO PHYSICALLY EXPOSE UTILITIES FOR MEASUREMENT AND DATA RECORDING.
ACCURACIES SHALL BE TO ONE HALF (0.5) INCH VERTICAL AND TO APPLICABLE HORIZONTAL
SURVEY AND MAPPING ACCURACY. EXCAVATE TEST HOLES EXPOSING THE UTILITY TO BE
MEASURED IN SUCH A MANNER THAT PROTECTS THE INTEGRITY OF THE UTILITY TO BE MEASURED.
COMPLY WITH APPLICABLE UTILITY DAMAGE PREVENTION LAWS, PERMITS, AND SPECIFICATIONS
AND COORDINATE WITH UTILITY AND OTHER INSPECTORS, AS REQUIRED. DETERMINE (A) THE
HORIZONTAL AND VERTICAL LOCATION OF THE TOP AND/OR BOTTOM OF THE UTILITY; (B) THE
ELEVATION OF THE EXISTING GRADE OVER THE UTILITY AT A TEST HOLE; (C) THE OUTSIDE
DIAMETER OF THE UTILITY AND CONFIGURATION OF NON-ENCASED, MULTI-CONDUIT SYSTEMS; (D) THE UTILITY STRUCTURE MATERIAL COMPOSITION, WHEN REASONABLY ASCERTAINABLE; (E) THE BENCHMARKS AND/OR PROJECT SURVEY DATA USED TO DETERMINE ELEVATIONS; (F) THE PAVING THICKNESS AND TYPE, WHERE APPLICABLE; (G) THE GENERAL SOIL TYPE AND SITE CONDITIONS;
AND (H) SUCH OTHER PERTINENT INFORMATION AS IS REASONABLY ASCERTAINABLE FROM EACH TEST HOLE SITE. IF THERE IS A POTENTIAL CONFLICT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. ANY DAMAGE TO UTILITIES, STRUCTURES AND/OR SERVICES SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE IN A MANNER APPROVE BY AND COORDINATE WITH
THE UTILITY OWNER.
10. FOR CONNECTIONS TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXCAVATE THE CONNECTION SITE TO VERIFY THE PIPE TYPE, ELEVATION, SIZE AND CONDITION, AND CHECK FOR OBSTRUCTIONS AND JOINT LOCATIONS PRIOR TO ORDERING MATERIALS AND INSTALLATION OF THE NEW PIPELINE.
11. THE CONTRACTOR HAS THE OPTION TO MOVE/RELOCATE THE ALIGNMENT (HORIZONTAL OR
VERTICAL) TO AVOID CONFLICT WITH EXISTING UTILITIES OR FOR EASE OF WORK, SUBJECT TO
APPROVAL FROM THE CITY. IF THE CONTRACTOR CHANGES THE VERTICAL ALIGNMENT, THE
CONTRACTOR SHALL INSTALL ALL NECESSARY AIR RELEASE VALVES AND FITTINGS AT HIS
EXPENSE.
12. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A
CONDITION EQUAL TO OR BETTER THAN THE CONDITION EXISTING BEFORE COMMENCING
CONSTRUCTION WORK.
13. WHEN ENCOUNTERED, UNSUITABLE MATERIALS SHALL BE REMOVED FROM THE EXCAVATED
MATERIALS AND BACKFILLED WITH SUITABLE MATERIALS. UNSUITABLE MATERIALS SHALL BE
REMOVED FROM THE JOB SITE AND DISPOSED OF IN A TIMELY AND LEGAL MANNER AND APPROVED
BY THE CITY.
14. INLETS AND CATCH BASINS SHALL BE PROTECTED FROM SEDIMENT UNTIL THE COMPLETION OF ALL
CONSTRUCTION OPERATIONS. EROSION CONTROL AT ALL INLET DRAINAGE STRUCTURES DURING
CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH CITY STANDARDS.
15. CONTRACTOR SHALL CLEAN DEBRIS AND SOIL FROM ALL NEW AND EXISTING STORM SEWER PIPES, INLETS, CATCH BASINS, AND STRUCTURES WITHIN THE PROJECT SITE AFTER THE CONSTRUCTION
IS COMPLETE AND FROM ALL EXISTING STORM SEWER PIPES AND STRUCTURES OUTSIDE THE
PROJECT SITE IF THESE MATERIALS ORIGINATED FROM THE PROJECT SITE. THE CONTRACTOR
SHALL REMOVE ANY SOIL DEPOSITS AT OUTFALLS FROM PIPES IN LAKES OR PONDS THAT WERE
CAUSED BY THE CONSTRUCTION. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL
EQUIPMENT AFTER THE PROJECT SITE IS STABILIZED AND STORM SYSTEM IS CLEANED.
16. PRIOR TO BEGINNING ANY CLEARING ACTIVITIES ON CITY PROPERTY, THE CONTRACTOR SHALL GET
APPROVAL FROM CITY DEPARTMENT FOR TREE REMOVAL, THEN CLEARLY MARK WITH FLAGGING
TAPE OR OTHER APPROVED METHOD, ALL EXISTING TREES TO REMAIN ON THE PROJECT SITE. ALL
TREES TO BE REMOVED SHALL BE MARKED WITH SPRAY PAINT OR OTHER APPROVED METHOD SO
THAT DURING CLEARING, THERE ARE NO MISUNDERSTANDING AS TO WHICH TREES ARE TO BE
REMOVED AND WHICH ARE TO REMAIN.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TREES NOT TO BE DAMAGED, FOR MAINTENANCE OF NEWLY PLANTED GRASS OR VEGETATION UNTIL THE WORK HAS BEEN ACCEPTED BY THE CITY.
18. DEWATERING SYSTEM SHALL BE UTILIZED BY THE CONTRACTOR IN ACCORDANCE WITH GOOD
STANDARD PRACTICES AND MUST BE SUFFICIENT ENOUGH TO LOWER THE WATER LEVEL IN
ADVANCE OF EXCAVATION TO KEEP THE TRENCH BOTTOM AND SIDES FIRM AND DRY, AT LEAST 3'
MINIMUM BELOW THE TRENCH BOTTOM, ADDITIONAL DEWATERING REQUIREMENTS ARE IN
SPECIFICATION 02140. POLLUTED WATER SHALL NOT BE DISCHARGED INTO SANITARY SEWER,
STORM SYSTEM RETENTION POND, OR BODIES OF WATER. ANY DISCHARGE INTO SANITARY SEWER SYSTEM SHALL BE PRE-APPROVED BY THE WASTEWATER DIVISION. DEWATERED LIQUID MUST BE TESTED FOR CONTAMINANTS PRIOR TO DISCHARGE. IF CITY APPROVES DISCHARGE TO SANITARY
SEWER, CITY HAS RIGHT TO CHARGE WASTEWATER FEES BASED ON CURRENT RATES.
CONTAINMENT TESTING TO BE PAID FOR BY CONTRACTOR.
19. EXCAVATIONS SHALL CONFORM TO THE REQUIREMENTS OF THE OSHA TRENCH SAFETY ACT. THE DISPOSAL OF EXCESS EARTHWORK MATERIALS SHALL BE THE RESPONSIBILITY/PROPERTY OF THE
CONTRACTOR.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF EMBANKMENTS AND SHALL
REPLACE ANY PORTION WHICH HAS BECOME DISPLACED DUE TO EROSION OR DUE TO
CARELESSNESS OR NEGLIGENCE ON THE PART OF THE CONTRACTOR.
21. TEMPORARY DRAINAGE SHALL BE PROVIDED DURING CONSTRUCTION TO ELIMINATE ANY FLOODING
OF PRIVATE PROPERTY AND EXISTING ROADWAYS CAUSED BY CONSTRUCTION ACTIVITIES.
CONTRACTOR SHALL PROVIDE ADDITIONAL DRAINAGE AT NO EXTRA COST TO THE OWNER.
22. HYDROSTATIC PRESSURE AND LEAKAGE TESTS SHALL BE CONDUCTED ONLY FOR INSTALLED
FACILITIES. ALL TEST SHALL BE ACCEPTED BY THE CITY CONSTRUCTION MANAGER BEFORE ANY
PAVEMENT IS PUT IN PLACE.
23. ALL PIPING SHALL BE CLEAN AND FREE OF ALL DIRT, DEBRIS, AND BIOLOGY BEFORE PRESSURE
TESTING AND SHALL BE INCIDENTAL TO PIPE INSTALLATION COST.
24. FORCE MAIN PRESSURE TESTING SHALL BE CONDUCTED FOR A MINIMUM OF 2 HOURS AT A
MINIMUM PRESSURE OF 100 PSI AND MAINTAIN THIS PRESSURE. A DISCERNIBLE PRESSURE DROP
OVER THE 2 HOUR TEST PERIOD SHALL CONSTITUTE A FAILURE OF THE PRESSURE TEST,
PRESSURE TEST MUST BE WITNESSED BY A CITY OF ORLANDO PROJECT MANAGER OR HIS
APPOINTED REPRESENTATIVE.
25. CONTRACTOR SHALL REFERENCE THE REQUIREMENTS SET FORTH BY THE CITY'S ENGINEERING
STANDARDS MANUAL.
26. IF LEAKAGE IS INDICATED BY ANY DISCERNIBLE PRESSURE DROP OVER THE TWO HOUR TEST PERIOD, THE CONTRACTOR SHALL LOCATE THE CAUSE OF THE LEAKS, REPAIR COMPONENTS AND
REPEAT THE LEAKAGE TEST. ALL LEAKAGE SHALL BE ELIMINATED.
27. ALL HYDROSTATIC TESTING SHALL BE IN ACCORDANCE WITH ANSI/AWWA C600-93 SECTION 4 FOR D.I. PIPE AND ANSI/AWWA C605 SECTION 7 FOR PVC PIPE. TEST PRESSURE SHALL BE 200 PSI FOR
POTABLE AND 150 PSI FOR RECLAIMED PIPING.
28. CONCRETE FORMS SHALL BE CONSTRUCTED FROM SOUND WOOD, METAL OR OTHER APPROVED
MATERIALS. FORMS SHALL BE SUITABLE TO PROVIDE A FLAT, UNIFORM SURFACE AND TO
WITHSTAND CONSTRUCTION LOADS WITHOUT SAGGING OR DEFLECTING. WOOD FORMS IN
CONTACT WITH THE CONCRETE SHALL BE COATED WITH A EFFECTIVE RELEASE AGENT. FORMS
SHALL REMAIN IN PLACE PER ACI 301 AND ACI 347. FORMS SHALL REMAIN STRAIGHT, LEVEL, PLUMB
AND TRUE TO SHAPE TO WITHIN 1/4" PER 10'.
29. MOLDING, BEVELS OR OTHER TYPES OF CHAMFER STRIPS SHALL BE PLACED TO PRODUCE A
3/4-INCH CHAMFER AT ALL HORIZONTAL AND VERTICAL PROJECTION CORNERS AND FOR
BLOCKOUTS.
30. CONCRETE REINFORCEMENT SHALL BE NEW, RUST FREE STEEL BARS THAT CONFORM TO ASTM A615, GRADE 60. TIE WIRE SHALL BE A MINIMUM OF 16-GAUGE, BLACK ANNEALED WIRE. CHAIRS
SHALL BE PROVIDED AS NECESSARY TO PREVENT DISPLACEMENT DURING POUR.
31. MINIMUM REINFORCEMENT STEEL AND CONCRETE COVER SHALL BE IN ACCORDANCE WITH ACI-318.
32. A COMPLETE SET OF AS-BUILT DRAWINGS (34" X 22" HARD COPY & AutoCAD FILE), AND ALL INSPECTION AND TEST RECORDS MUST BE SUBMITTED TO THE CITY OF ORLANDO AND APPROVED BEFORE THE NEW SYSTEM IS ALLOWED TO BE PUT INTO SERVICE. THE DRAWINGS MUST INCLUDE ACCURATE LAYOUT, SIZING, AND STATE PLANE COORDINATES FOR ALL VALVES, PIPING BENDS, BRANCHES, ENDS, OUTLETS, CONNECTION POINTS, METER BOXES AND LOCATOR BALLS, OR ANY ITEM LISTED ABOVE. AS-BUILTS SHALL BE SIGNED AND SEALED BY FLORIDA LICENSED SURVEYOR.
ADDITIONAL REQUIREMENTS AND SUBMITTALS ARE LISTED IN SECTION 01050 SURVEYING AND
FIELD ENGINEERING.
33. ALL WATER, SEWER, AND RECLAIMED WATER PIPE, PIPE FITTINGS AND APPURTENANCES
INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN ACCORDANCE WITH
SUBPARAGRAPH 62-555.320 (21) (b) 3, FAC, USING BLUE AS A PREDOMINANT COLOR FOR WATER;
GREEN FOR WASTEWATER; PANTONE PURPLE 522C FOR RECLAIMED WATER.
34. ALL BACKFILL SHALL BE COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DRY DENSITY AS MEASURED BY AASHTO T-180 METHOD "D" TEST (MODIFIED PROCTOR) IN OPEN AREAS AND TO NOT
LESS THAN 98% MAXIMUM DRY DENSITY AS MEASURED BY AASHTO T-180 METHOD "D" TEST
(MODIFIED PROCTOR) UNDER ASPHALT OR CONCRETE PAVEMENT. ALL SOIL TESTING TO BE
CONDUCTED BY THE CITY. THE CONTRACTOR SHALL PROVIDE ALL REASONABLE ASSISTANCE
DURING SOIL TESTING.
35. WHEN USING SCALED DATA CONSIDER THAT THESE PLANS MAY HAVE BEEN ALTERED IN SIZE
DURING REPRODUCTION.
36. PIPE LENGTHS SHOWN ON PLANS ARE APPROXIMATE. ACTUAL LENGTHS ARE TO BE DETERMINED
DURING CONSTRUCTION BY THE CONTRACTOR.
37. SUPPORT & PROTECT ALL EXISTING UTILITIES. CONTRACTOR SHALL CONTACT UTILITY OWNERS
FOR LOCATION OF ALL EXISTING FACILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING WITH UTILITY OWNERS AND BE RESPONSIBLE FOR PROVIDING TEMPORARY
SUPPORT FOR UTILITY POLES AND ALL OTHER UTILITIES FACILITIES.
38. IF REQUIRED BY DEWATERING ACTIVITIES CONTRACTOR SHALL APPLY FOR AND OBTAIN A
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FROM THE FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) AND COMPLY WITH ALL NPDES
REQUIREMENTS DURING CONSTRUCTION OF THE PROJECT.
39. EXERCISE EXTREME CAUTION WHEN EXCAVATING NEAR WASTEWATER FORCE MAINS AND GRAVITY
SEWERS. EXPOSE AND VERIFY LOCATION OF MAINS PRIOR TO EXCAVATION.
40. PROTECT EXISTING IMPROVEMENTS TO THE MAXIMUM EXTENT POSSIBLE. ALL DAMAGED SIDEWALK, ROADWAY PAVEMENT, GRASS LANDSCAPING AND OTHER IMPROVEMENTS SHALL BE RESTORED TO
ORIGINAL CONDITION OR BETTER, AT CONTRACTOR'S EXPENSE.
41. BENCHMARK LOCATIONS AND ELEVATION ARE SHOWN IN THE PLANS AS REPRESENTED BY
SURVEYOR AT THE TIME OF THE SURVEY. CONTRACTOR SHALL VERIFY ITS CORRECTNESS AT THE
TIME OF CONSTRUCTION AND INSTALL HIS OWN TEMPORARY BENCHMARKS. ANY DISCREPANCIES
SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CITY FIELD REPRESENTATIVE.
42. WHEN WORKING IN CONFINED SPACES AT THE SITE, CONTRACTOR EMPLOYEES SHALL MEET ALL
OSHA CONFINED SPACE ENTRY REQUIREMENTS, INCLUDING BUT NOT LIMITED TO PERMITTING,
ATMOSPHERE TESTING, CHECKLISTS, SEWER ENTRY AND RESCUE TEAMS AS REQUIRED BY OSHA
29 CFR 1910 AND PROVIDE CERTIFICATIONS TO THE CITY.
43. APPROVED HOURS CONTRACTOR MAY WORK ONSITE ARE 7:00 AM TO 3:30 PM, MONDAY THROUGH FRIDAY, EXCLUDING CITY HOLIDAYS. ANY WORK OUTSIDE THE STATED TIME MUST BE APPROVED
BY CITY.
44. CONTRACTOR SHALL AT ALL TIMES MAINTAIN ACCESS WAYS FOR CITY VEHICLES AND PERSONNEL
TO MAINTAIN LIFT STATION FOR MAINTENANCE/EMERGENCY SITUATIONS.
45. CONTRACTOR TO CONTACT THE CITY SURVEYOR IF SURVEY CONTROLS OR BENCHMARKS ARE TO BE DISTURBED OR THAT HAVE BEEN DAMAGED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR'S SURVEYOR (A FLORIDA LICENSED SURVEYOR AND MAPPER) TO COORDINATE WITH CITY SURVEYOR
AND ENGINEER PRIOR CONSTRUCTION OR PRIOR TO DISTURBING CONTROL DURING
CONSTRUCTION. CONTRACTOR SHALL REPLACE CONTROLS WITH THE DOCUMENTATION AND
DIRECTION PROVIDED BY THE CITY SURVEYOR.
46. SURVEY SHALL BE IN ACCORDANCE TO CITY'S ENGINEERING STANDARDS MANUAL (AS-BUILT DETAILED IN CHAPTER 5). CONTRACTOR SHALL HAVE FLORIDA LICENSED SURVEYOR REFERENCE ALL CONTROL POINTS TO CONSTRUCTION. INCLUDING RIGHT OF WAY, CORNERS, OR ANY CONTROL
POINTS AND PROVIDE INFORMATION TO CITY SURVEYOR. ADDITIONAL REQUIREMENTS AND
SUBMITTALS ARE LISTED IN SECTION 01050 SURVEYING AND FIELD ENGINEERING.
CONSTRUCTION NOTES
EMERGENCY WASTEWATER SPILL, WATER MAIN OR ELECTRICAL BREAK
PROCEDURES:
1. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN PROXIMITY OF WATER, WASTEWATER FORCE MAINS AND GRAVITY SEWERS. LOCATIONS SHOWN ON PLANS ARE NOT EXACT OR GUARANTEED. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING EXISTING UTILITY LOCATIONS
WHETHER SHOWN ON THE PLANS OR NOT.
2. THE PLANT SHIFT OPERATOR SHALL BE NOTIFIED IMMEDIATELY IN THE EVENT OF A FORCE MAIN, RECLAIMED WATER MAIN, OR GRAVITY SEWER BREAK OR DAMAGE AT (407-448-1013).
3. OUC DISPATCH OPERATOR SHALL BE NOTIFIED IMMEDIATELY IN THE EVENT OF A WATER OR
ELECTRICAL BREAK OR DAMAGE AT (407-823-9150).
4. ALL DAMAGE TO MAINS SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE. IF THE REPAIR IS NOT MADE IN A TIMELY MANNER, AS DETERMINED BY THE CITY INSPECTOR, THE CITY MAY PERFORM REPAIRS AND THE CONTRACTOR WILL BE CHARGED FOR
REPAIRS.
SEQUENCE OF CONSTRUCTION:
1. CONTRACTOR SHALL SUBMIT SEQUENCE OF CONSTRUCTION PLAN FOR APPROVAL TO CITY 14-DAYS PRIOR TO ONSITE CONSTRUCTION. BYPASS PUMPS SHALL REMAIN IN OPERATION 24-HOURS 7-DAYS PER WEEK. ADDITIONAL SEQUENCE AND BYPASS REQUIREMENTS ARE INCLUDED IN SPECIFICATION
SECTION 01014 CONSTRUCTION SEQUENCING/CONSTRAINTS AND 01525 TEMPORARY PUMPING
SYSTEMS
CITY CONTACT INFORMATION:
1. WASTE WATER DIVISION............................................................................... 407-246-2213
2. TRANSPORTATION ENGINEERING DIVISION..……………………………….. 407.246.2020
3. FOR LANE AND STREET CLOSURES FOR CONSTRUCTION ….......…....... 407.246.2372
4. FIRE DEPARTMENT ….......….......................................................................... 407.246.2390
5. OUC (WATER & ELECTRIC) .......................................................….......…...... 407.823.9150
PL
O
T D
AT
E:
/2
1/
:3 p.
m
B
Y:
L
EY
BE
TH
V
AL
EN
C
IA
Fi le
: C :\U
SE
R
S\
LE
YB
ET
H V
AL
EN
C
IA
\D C
\A C
C D
O C
S\ H
AZ
EN
A N
D S
AW
YE
R \4
-0
_C O
N
SE
R V
II
W
R F
EQ
P
S
FI
N
AL
D
ES
IG
N
\P R
O
JE
C T
FI
LE
S\
_D
ES
IG
N
\0 1-
H
AZ
EN
\G
EN
ER
AL
\4
-0
-G -0
Sa ve d by L
EY
BE
TH
V
AL
EN
C
IA
S av e da te : 5
/2 1/
:3 p.
m
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
44051-001
JUNE 2026K. BLANTON
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT No.:
HAZEN No.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
G-00-04
GENERAL
ABBREVIATIONS AND SYMBOLSW. MARSHALL
SECTION
SECTION AND DETAIL IDENTIFICATION
NOTES:
IF PLAN AND SECTION (OR DETAIL CALL-OUT AND DETAIL)
ARE SHOWN ON SAME DRAWING, DRAWING NUMBER IS
REPLACE BY A DASH (-).
(1)
IF SECTION IS SHOWN IN TWO OR MORE LOCATIONS, THE
FIRST DRAWING NUMBER WHERE THE SECTION IS SHOWN IS
DISPLAYED IN THE SECTION TITLE.
(2)
(3)
IF THE DETAIL TITLE REFERS TO A STANDARD DETAIL, THE
DRAWING NUMBER IN THE DETAIL TITLE IS REPLACED WITH THE
ABBREVIATION STD.
(4)
IF A DETAIL IS SHOWN IN TWO OR MORE LOCATIONS, THE
DRAWING NUMBER IN THE DETAIL TITLE IS REPLACED WITH
A LINE.
A. SECTION CUT ON DRAWING G-1:
B. ON DRAWING G-2 THIS SECTION IS IDENTIFIED AS:
A. DETAIL CALL-OUT ON DRAWING G-1 AS:
DETAIL IDENTIFICATION
SECTION IDENTIFICATION
B. ON DRAWING G-2 THIS DETAIL IDENTIFIED AS:
* DENOTES DIMENSIONS OR ELEVATIONS
DEPENDENT ON EQUIPMENT SUPPLIED.
SECTION LETTER
DRAWING ON WHICH
SECTION APPEARS. (1)
SECTION LETTER
DRAWING FROM WHICH
SECTION WAS TAKEN. (1)(2)
DETAIL NUMBER
DRAWING ON WHICH
DETAIL APPEARS. (1)
DETAIL NUMBER
DRAWING ON WHICH
DETAIL IS CALLED OUT. (1)(3)
A. STANDARD DETAIL CALL-OUT ON DRAWING G-1 AS:
STANDARD DETAIL IDENTIFICATION
B. STANDARD DETAIL ON DRAWING G-10 THIS DETAIL IDENTIFIED AS:
DETAIL NUMBER
DRAWING ON WHICH
DETAIL APPEARS. (1)
DETAIL NUMBER
STANDARD DETAIL (4)
GENERAL NOTES:
FOR WELDING SYMBOLS USE AMERICAN
WELDING SOCIETY STANDARD SYMBOLS.
ELECTRICAL SYMBOLS SHOWN ON ELECTRICAL SHEETS.
(2) (1)
G-2
DETAIL
G-1
G-10
DETAIL
STD
ARROW INDICATES DIRECTION AND POINT OF
VIEW OF PHOTO
LOCATIONS AND ELEVATIONS ARE AS PER AS-BUILT DRAWINGS.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS.
(3)
LBS/FT POUNDS PER FOOT
FT
GALV
FPL, FP&L FLORIDA POWER AND LIGHT CO.
GALVANIZED
FOOT
RADIUS
REQUIRED
REINFORCING
RAD, R
REINF
REQ'D
R/W, ROW RIGHT OF WAY
SANITARY
SHEET
SECTION
SAN
SHT
SECT
SQUARE
STEEL
SQ
STL
SS
SPEC
STAINLESS STEEL
SPECIFICATION
HIGHH
HP
HR
HDPE
HORIZ
INFL
ID
HANDRAIL
HIGH DENSITY POLYETHYLENE
HIGH POINT
INSIDE DIAMETER
INFLUENT
HORIZONTAL
IF
INSUL
INT
ISO
JOINT
INV
JT
LF LINEAL FEET
INVERT
ISOLATION
INTERIOR
INSULATION
INSIDE FACE
TEMPORARY
SYMM
TEMP
T & B
TO
THICKTHK
TOP AND BOTTOM
THROUGHOUT
TEMPERATURE INDICATOR
SYMMETRICAL
VACUUM
TYPICAL
TOS
VAC
TYP
WWF
W/L
WELDED WIRE FABRIC
WATER LEVEL
TOP OF STEEL/TOP OF SLAB
TOC TOP OF CONCRETE
LP
MH
LWL
MAX
MANUF
MAXIMUM
MANUFACTURER
MANHOLE
LOW WATER LEVEL
LOW POINT
MIN
NIC
NGVD
No
OPNG
OD
OC
NTS
NATIONAL GEODETIC VERTICAL DATUM
OUTSIDE DIAMETER
OPENING
ON CENTER
NUMBER
NOT TO SCALE
NOT IN CONTRACT
MINIMUM
MECHANICALMECH
WITH
PI PRESSURE INDICATOR
LONG
STRUCTURAL
LG
STRUC
CENTER TO CENTER
CENTER LINE
C.C.
BLIND FLANGE
BALL VALVE
AIR RELIEF VALVEARV
BF
BV
VALVES, FITTINGS, ETC.
COLUMN
CLEAR
CLEAN OUT/COMPANY
CONCRETE
CONTRACTOR
CONTINUOUS
CONSTRUCTION
COL
CLR
CO
CONC
CONT
CONST
CONTR
DIAGONAL
DETAIL
DIAMETER
DIMENSION
DOWN
DOWEL
DRAWING(S)
DIAG
DET
DIM
DIA
DN
DWL
DWG(S)
EQUIPMENT DRAIN
EXPANSION JOINT
CHECK VALVE
BUTTERFLY VALVE
FLANGE
FITTING
FIRE HYDRANT
CV
BFV
ED
EXP JT
FTG
FH
FLG
GROOVED COUPLING
MECHANICAL JOINT
GATE VALVE
PLUG VALVE
PLAIN END
GC
GV
NPT
MJ
PV
PE
PRV
NATIONAL PIPE THREAD
PRESSURE RELIEF VALVE
CHECK VALVE (CV)
BALL VALVE (BV)
PLUG VALVE (PV)
GATE VALVE (GV)
THREE WAY VALVE
MECHANICAL COUPLING
HOSE BIBB (ELEVATION)
HOSE BIBB (PLAN)
GROOVED COUPLING
HARNESSED EXPANSION JOINT
HARNESSED MECHANICAL COUPLING
PRESSURE REGULATING VALVE
PRESSURE REDUCING/RELIEF VALVE
BUTTERFLY VALVE / DAMPER
EACH
EACH WAY
EACH FACE
EACH END
EFFLUENT
ELECTRIC
ELEVATION
ECCENTRIC
EA
EE
EW
EF
EFF
EL, ELEV
ELEC
ECC
EXISTING
EDGE OF PAVEMENT
EQUIPMENT
FOUL AIR
EXTERIOR
FINISH
FIRE EXTINGUISHER
EXPANSION
EOP
EXIST
EQUIP
FA
EXT
FIN
FE
EXP
ELECTRICAL MAINTENANCE HOLEEMH
PIPING
DUCTILE IRON PIPE
STAINLESS STEEL PIPE
IRON PIPE SIZE
POLYVINYLCHLORIDE
ERCP
DIP
SSP
IPS
PVC
GENERAL
CATCH BASIN
BOTTOM
BUILDING
CB
BOTT
BLDG
UNION
FIRE HYDRANT
EXPANSION JOINT
MAINTENANCE HOLE
POWER POLE
WELDED JOINT
CATCH BASIN
THREADED JOINT
PUSH-ON JOINT
MECHANICAL JOINT
FLANGED JOINT
SOCKET WELDED JOINT
THREADEDTHD
CIP CAST IRON PIPE
PLAIN ENDPE
FL FLOOR
COUPLINGCPLG
HOSE BIBBHB
MOTOR OPERATED VALVEMOV
PUMP STATIONPS
SOV SOLENOID OPERATED VALVE
CHECKEREDCHK'D
COPPER OR CUBICCU
DISCHARGEDISCH
INJECTIONINJ
LINELN
REDUCERRED
REHAB REHABILITATION
SOLENOID
MOTOR OPERATEDM
S
VENTURI METER
GAUGE
MAGNETIC METER
MM
EXISTING UTILITIES/STRUCTURE
PROPOSED PIPELINE (DOUBLE LINE IF
SCALE OF DRAWING PERMITS)
PROPOSED PIPELINE/STRUCTURE
PROPOSED STRUCTURE OR FACILITY
CONCRETE PIPE SUPPORT
REDUCER (SINGLE LINE)
REDUCER (DOUBLE LINE)
BLK BLOCK
VERTICALVERT
FORCE MAINFM
NORTH AMERICAN VERTICAL DATUM NAVD
POND OVERFLOWPO
CL,
INVERT ELEVATIONIE
PUMP STATIONPS
CHECK BALL VALVE
W/O WITHOUT
FIG FIGURE
CHLORINATED POLYVINYL CHLORIDECPVC
ELECTRICAL LIGHT POLE
NPW NON POTABLE WATER
ALUMINUM
ARCHITECTURAL
APPROXIMATEAPPROX
ARCH
AL, ALUM
DRAINDR
HIGH DENSITY POLYETHYLENE PIPEHDPE
RESTRAINED JOINTRJ
LONG RADIUSLR
PUSH ONPO
RJ RESTRAINED JOINT
CORRUGATED METAL PIPECMP
RCP REINFORCED CONCRETE PIPE
ANGLE
AB ANCHOR BOLT
DIGESTERDIG
GR GRADE
FTG FOOTING
HWL HIGH WATER LEVEL
LBS POUNDS
LAT LATERIAL
LENGTHLGTH
LIGHT POLEL.P.
LOCATIONLOC
OF OUTSIDE FACE
POINT OF CURVATUREP.C.
P.I. POINT OF INTERSECTION
PROPERTY LINEP/L, PL
PROPOSEDPROP
POUNDS PER SQUARE INCHPSI
POINT OF TANGENCYP.T.
PAVEMENTPVT
POTABLE WATERPW
REVISIONREV
RESTRAINEDREST
STANDARDSTD
STATIONSTA
TBD TO BE DETERMINED
WIDE
FLOWSTREAM IDENTIFICATION
SD STORM DRAIN
DWG#PHOTO#
W
GRAVITY MAIN
STORM DRAIN
UNDERGROUND ELECTRICAL
LINE
FENCE LINE
SS
SD
BE
X
R/W
BW
OHE
BFM
RIGHT OF WAY
LINE TYPE
NEW ASPHALT PAVEMENT
NEW CONCRETE PAVEMENT
BURIED WATER LINE
OVERHEAD ELECTRICAL LINE
TO BE DEMOLISHED / REMOVED
ELECTRICAL POWER POLE
ELECTRIC METEREM
WATER METER
SEWER MANHOLE
SURVEY CONTROL POINT
WATER MANHOLE
S
WM
W
STORM MANHOLESD
SURVEY CONTROL POINTIP
VENT
GUY POLE
TRAFFIC ELECTRIC VAULT
HOSE BIBB
ELECTRIC PANELEP
ELLIPTICAL REINFORCED
CONCRETE PIPE
BURIED FORCE MAIN
PL
O
T D
AT
E:
/2
1/
:3 p.
m
B
Y:
L
EY
BE
TH
V
AL
EN
C
IA
Fi le
: C :\U
SE
R
S\
LE
YB
ET
H V
AL
EN
C
IA
\D C
\A C
C D
O C
S\ H
AZ
EN
A N
D S
AW
YE
R \4
-0
_C O
N
SE
R V
II
W
R F
EQ
P
S
FI
N
AL
D
ES
IG
N
\P R
O
JE
C T
FI
LE
S\
_D
ES
IG
N
\0 1-
H
AZ
EN
\G
EN
ER
AL
\4
-0
-G -0
Sa ve d by L
EY
BE
TH
V
AL
EN
C
IA
S av e da te : 5
/2 1/
:3 p.
m
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
44051-001
JUNE 2026K. BLANTON
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT No.:
HAZEN No.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
RAW SEWAGERS
EXIST.ODOR
CONTROL
TANK
EXIST.
EQUALIZATION
TANK
SOD ALL DISTURBED UNPAVED
AREAS W/BAHIA (TYP.)
MILL AND RESURFACE
EXISTING ASPHALT PAVEMENT
EXIST.
EQUALIZATION
PUMP STA.
MILL AND RESURFACE
EXISTING ASPHALT PAVEMENTSAW CUT EXIST. EDGE OF PVM'T
MATCH EXIST. CONDITIONS
SOD ALL DISTURBED UNPAVED
AREAS W/BAHIA (TYP.)
EXIST. YARD
HYDRANT/HOSE BIB
SHALL REMAIN
EXIST LIGHT POLE
SW
ALE
APPROX. LOCATION
OF EXIST. SWALE
PL
O
T D
AT
E:
/2
2/
:1 p.
m
B
Y:
L
EY
BE
TH
V
AL
EN
C
IA
Fi le
: C :\U
SE
R
S\
LE
YB
ET
H V
AL
EN
C
IA
\O N
ED
R
IV
E
- H
AZ
EN
A
N D
S
AW
YE
R
\D O
C U
M
EN
TO
S\
1-
C
O N
SE
R
V
II
W R
F\
AR
C H
IV
O
\4
-0
M
SP
S av ed b y
LE
YB
ET
H
V
AL
EN
C
IA
S av e da te
: 5 /2
2/
:0 p.
m
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
44051-001
JUNE 2026K. BLANTON
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT No.:
HAZEN No.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
SCALE: 1" = 10'
10 0 10'
CIVIL / SITE
ENGINEERING, INC. CS
E I1645 N. MAITLAND AVENUE
MAITLAND, FL 32751
C-01-01
ASPHALT PAVEMENT SECTION
NOT TO SCALE
1 FRICTION COURSE FC-9.5 (1" LIFT) (PG 76-22)
2 SUPERPAVE ASPHALTIC CONCRETE TYPE SP-12.5
(1.5") (TRAFFIC LEVEL D COARSE MIX (PG 76-22)
3 10" CRUSHED CONCRETE (SEE CITY OF
ORLANDO ENGINEERING STANDARDS MANUAL,
SECTION 6.06)
4 12" TYPE 'B' STABILIZATION MIN LBR 40
1.00'
NOTES:
1. CONTRACTOR TO RESTORE ALL DISTURBED UNPAVED
AREAS AND MILL AND RESURFACE ALL DISTURBED
PAVEMENT AREAS.
SITE PLAN
FOR REFERENCE ONLY
DEMO
EXISTING
DOOR
EXISTING STAIRS,
SEE STRUCTURAL
DEMO PLAN
DEMO PARTITION WALL
2' - 6"
DEMO CONCRETE FLOOR,
SEE STRUCTURAL PLANS
R E
M A
IN
EXISTING
EXISTING WINDOW
TO REMAIN IN PLACE
EXISTING
ELECTRICAL ROOM
EXISTING WALL TO REMAIN
IN PLACE
EXISTING WINDOW TO
REMAIN IN PLACE
EXIT
APPROX. LOCATION OF CEILING
OPENING, VIF. SEE NOTE 2.
E X
IS
T
IN
G
W A
L L
NEW METAL STAIRS,
SEE STRUCTURAL
SHEETS FOR DETAILS
E X
IS
T
IN
G
EXISTING
16' - 0"
EXISTING CMU WALLN
E
W P
A R
T
IT
IO
N
W A
L L
NEW PARTITION WALL
INFILL FRAME WALL
13' - 3" 2' - 9"
A-10-02
A_______
EXISTING
ELECTRICAL ROOM
D1
O1
E X
IS
T
IN
G
FRAME FOR NEW
OPENING
EXISTING CMU WALL
EXISTING WALLS TO REMAIN
EXISTING DOOR
TO REMAIN
EXISTING WALL
EXISTING WINDOW
NOTE 1
NOTE 1
NOTE 1
EXIT
APPROX. LOCATION OF CEILING
OPENING, VIF. SEE NOTE 2.
T R
A V
E L D
IS
T
A N
C E
(2 '-0
A-10-02
1_______
GENERAL ARCHITECTURAL NOTES
1. FOR CONCRETE AND STEEL SIZES AND CONFIGURATIONS, SEE
STRUCTURAL DRAWINGS.
2. FOR LOCATION OF EQUIPMENT PADS, SEE STRUCTURAL AND PROCESS
MECHANICAL DRAWINGS.
3. ITEMS NOT NOTED ON DRAWINGS SHALL BE CONSIDERED THE SAME AS
NOTED ITEMS WHICH ARE GRAPHICALLY REPRESENTED IN THE SAME
MANNER.
4. SURFACES TO BE PAINTED ARE NOT COMPLETELY INDICATED ON
DRAWINGS. SEE DETAILS SPECIFICATION 09900 PAINTING AND FINISH
SCHEDULE.
5. INTERIOR WALLS SHALL EXTEND TO UNDERSIDE OF THE ROOF UNO.
6. PROVIDE TOP OF WALL ANCHORS TO THE TOP METAL STUD WALL OF ALL
INTERIOR NEW WALLS TO THE UNDER ROOF STRUCTURE UNO.
7. TOP OF METAL STUD WALLS TO RECEIVE DEFLECTION TRACK AND 4'-0"
OC WIRE BRACING OR AS RECOMMENDED BY STUD MANUFACTURER.
8. NEW DOOR OR OPENINGS SHALL BE LOCATED 8" FROM THE CORNERS OF
MASONRY WALLS, AND 6" FROM THE CORNERS OF METAL STUD WALLS
UNLESS OTHERWISE DIMENSIONED ON THE PLAN.
9. WALL DIMENSIONS ARE TO FACE OF EXISITNG MASONRY OR FACE OF
NEW METAL STUD. SEE PARTITION SCHEDULE FOR ADDITIONAL
INFORMATION.
10. DIMENSIONS REPRESENT METAL STUD WALL OPENINGS, AND NOMINAL
OPENINGS IN METAL FRAMED WALLS.
11. EXISTING MASONRY WALL DIMENSIONS ARE NOMINAL MASONRY SIZES
UNO.
12. INTERIOR MASONRY WALLS THAT ARE TO RECEIVE METAL FURRING ARE
DIMENSIONED TO THE FACE OF THE METAL FURRING. SEE PARTITION
SCHEDULE FOR METAL FURRING TYPE AND FINISH.
13. WHERE THE TERM "ALIGN" IS SHOWN ON THE DRAWING, IT SHALL MEAN
THAT FINISH MATERIALS ON WALLS SHALL ALIGN. WHERE FINISHES HAVE
DIFFERENT SUBSTRATES, PROVIDE A CONTROL JOINT IN THE FINISH
MATERIAL WHERE THE DIFFERENT MATERIALS MEET.
14. CONDUITS IN FINISHED AREAS SHALL BE CONCEALED IN METAL STUD
WALLS.
15. WHERE DISSIMILAR METALS ADJOIN, SEPARATE WITH BARRIER COATING
TO PREVENT GALVANIC CORROSION.
16. FOR EXPOSED METAL DECK CEILINGS, ROOFING SCREWS TO BE CUT TO
NOT EXTEND MORE THAN 1" THROUGH METAL DECK.
17. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL LOADS, INCLUDING NON-
STRUCTURAL COMPONENT ANCHORAGE TO RESIST SEISMIC FORCES.
18. WHERE DISCREPANCIES ARE FOUND, VERIFY IN FIELD CONDITIONS AND
NOTIFY THE ENGINEER IN ACCORDANCE WITH THE GENERAL
CONDITIONS.
19. DRAWINGS ARE REPRESENTATIVE, AND DO NOT SUGGEST THE USE OF A
PARTICULAR PRODUCT. NOTES AND SPECIFICATIONS SHALL DEFINE
SPECIFIC PRODUCTS.
BUILDING CODE SUMMARY OF WORK
1. WORK WILL COMPLY WITH THE EIGHTH EDITION OF THE EXISTING
FLORIDA BUILDING CODE 2023.
2. THE BUILDING OCCUPANCY WILL REMAIN THE SAME, EXIT PATHS, AND
EXITS WILL NOT CHANGE LOCATION, CONSTRUCTION TYPE WILL NOT BE
MODIFIED. THE BUILDING IS OCCASIONALLY ENTERED FOR
MAINTENANCE, MONITORING, AND REPAIR BY SERVICE PERSONNEL. THE
BUILDING IS NOT REQUIRED TO MEET THE ACCESSIBILITY REQUIREMENTS
AS IT MEETS THE EXCEPTION FOR MACHINERY SPACES 203.5.
3. EXISTING STAIRS WILL BE REMOVED AND THE RISE AND RUN WILL BE
MODIFIED TO AGREE WITH CURRENT BUILDING CODE REQUIREMENTS
AND THE STRUCTURAL CONSTRAINTS OF THE BUILDING.
4. WALLS ENCLOSING THE STAIR WILL BE MODIFIED TO PROPOSED
CONFIGURATION. WALLS ARE DESIGNED TO NOT INCREASE LOADING ON
THE EXISTING STRUCTURE.
LEGEND:
PATH OF TRAVEL
P1
DOOR NUMBER - SEE DRAWING A-02
PARTITION TYPE - SEE DRAWING A-02DEMO AREAS
DESIGNED BY:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
K. BLANTON
0 1/2" 1"
JUNE 2026
44051-001
1 ADDENDUM ONE 03/26 CD
A u to d e s k D o c s /4
-0
C o n s e rv
I I W
R F
E Q
P S
F in a l D e s ig n /4
-0
-E Q
P S
-A .r v t
/2
/2
:4
:1
P M
A-10-01
J. SCHEINBERG
W.RUSSELL
C.DELGADO
ARCHITECTURAL
EQUALIZATION PUMP STATION
EXISTING AND PROPOSED FLOOR PLANS
3/16" = 1'-0"
EXISTING FLOOR PLAN EL 98.00
3/16" = 1'-0"
PROPOSED FLOOR PLAN EL 98.00
NOTE 1:
FOR ALL STRUCTURAL, ELECTRICAL, HVAC, MECHANICAL, SEE
APPROPRIATE DISCIPLINE DRAWINGS, SHOWN FOR REFERENCE ONLY.
NOTE 2:
CONTRACTOR TO VERIFY DIMENSIONS OF CEILING OPENING AND
COORDINATE WITH TOP OF PARTITION WALL TO JOIN WITH EXISTING PRE-
CAST HOLLOW CORE ROOF.
N
APPROXIMATE LOCATION OF CEILING OPENING (FOR REFERENCE ONLY)
D1
PROPOSED PARTITION WALL
9' - 10"
EXISTING WALL
8' - 1"
METAL STAIRS & RAILING
SEE STRUCTURAL DRAWINGS
O1
HVAC COMPONENTS SEE
HVAC DRAWINGS
EXISTING WALLS
VARIES EL 108.00
EL 98.00
EL 88.75
EL 70.19
NOTE: REFER TO STRUCTURAL
DRAWINGS FOR ALL STAIR
PLANS, SECTIONS & DETAILS
EXISTING ROOF TO REMAIN
SILL
JAMB
HEAD
INSUL AS
SCHEDULED
GWB AS SCHEDULEDCAULK EACH
SIDE ALL
AROUND, TYP
DOOR AS
SCHEDULED
THRESHOLD AS
SCHEDULED
CONC FLOOR
SLAB SEE
STR DWGS
JAMB ANCHOR,
MIN 3 PER JAMB
DOOR AS
SCHEDULED
GWB AS SCHEDULED
MTL STUDS
BOX HEADER
METAL STUDS AS
SCHEDULED
FRAME AS
SCHEDULED
FLOOR FINISH AS
SCHEDULED
DOOR AS
SCHEDULED
SILL
HEAD
INSUL AS REQUIRED
5/8" MOLD
RESISTANT GWB
CAULK EACH
SIDE, TYP
EXISTING
CONC. FLOOR
SLAB
5/8" MOLD
RESISTANT GWB
6" MTL STUDS
OR MATCH EXISTING
WALL THICKNESS
DEFLECTION TRACK
AND HEADER METAL
CHANNEL
EXISTING FLOOR
EXISTING
CONCRETE CEILING
PAINT PER SPECS
RUBBER WALL BASE
ON EACH SIDE
DOOR LEGEND DOOR HARDWARE SCHEDULE:
AL
HM
IG
FRG
FRP
ALUMINUM
HOLLOW METAL
INSULATING GLAZING
FIRE GLASS
FIBERGLASS REINFORCED PLASTIC
MFR
PT
STL
TG
MANUFACTURER
PAINT
STEEL
TEMPERED GLASS
1. NEW DOOR:
* 1-1/2" PAIR FULL MORTISED STAILESS STEEL BUTT HINGES
* (4-1/2" X 4-1/2" MCKINNEY MPB91, 630 FINISH
* HEAVY DUTY OVERHEAD CLOSER, LCN 1461
* LEVER HANDLE WITH KEY OUTSIDE AND PUSH BUTTON INSIDE
LOCKSET (ANSI F82/SCHLADGE D50PD LESS CORE, RHODES LEVER 626,
BEST CORE W/626 FINISH
* 12" X 24" STAINLESS STEEL KICK PLATE (BOTH SIDES)
* FLOOR STOP TRIMCO 1211 DOME STOP, 626 FINISH
* 12" X 36"X1/2" TEMPERED VISION PANEL
ROOM FINISH LEGEND ROOM FINISH SCHEDULE NOTES:
CL
CONC
CMU
ES
CONTAINMENT LINER
CONCRETE
CONCRETE MASONRY UNITS
EXPOSED STRUCTURE
EX
GWB
MFR
PT
EXISTING
GYPSUM WALLBOARD
MANUFACTURER
PAINT
1. NEW WALL GWB PAINT (SEE PAINT SPECIFICATIONS)
2. EXISTING CONCRETE CEILING, PAINT TO MATCH EXISTING
FINISH WHERE NECESSARY. ( SEE PAINT SPECIFICATIONS)
F1 (D1)
FRAME TYPES DOOR TYPES1/4" = 1'-0" 1/4" = 1'-0"
F2 (O1) HG (D1)
GLASS AS
SCHEDULED, TYP
2' - 0"
6" TYP
2' - 0"
3' - 0" 2"2"
DESIGNED BY:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
2420 S. LAKEMONT AVENUE, SUITE 325
ORLANDO, FLORIDA 32814
WATER CONSERV II WRF
EQUALIZATION PUMP STATION
IMPROVEMENTS
K. BLANTON
0 1/2" 1"
JUNE 2026
44051-001
1 ADDENDUM ONE 03/26 CD
A u to d e s k D o c s /4
-0
C o n s e rv
I I W
R F
E Q
P S
F in a l D e s ig n /4
-0
-E Q
P S
-A .r v t
/2
/2
:4
:1
P M
A-10-02
J. SCHEINBERG
W.RUSSELL
C.DELGADO
ARCHITECTURAL
EQUALIZATION PUMP STATION
ELEVATIONS, DETAILS AND NOTES
SECTION
1/4" = 1'-0" A-10-01
A
DETAIL
1 1/2" = 1'-0"
1 DETAIL
1 1/2" = 1'-0"
DOOR SCHEDULE
Type
FRAME DOOR DETAILS
FIRE
RATING
GLAZING
FINISH WIND
SECURITY
WIRING
HARDWARE
THRESHOLD REMARKSTYPE MATL TYPE MATL
ACTIVE
WIDTH
INACTIVE
WIDTH HEIGHT THICKNESS HEAD JAMB SILL TYPE SIZE NO NOTE
HS Single Door - HG
- 3'-0"x7'-2" F-1 HM HG HM 3' - 0"
0' - 0" 7' - 2" 1 3/4" 1 1 1 TG 24"x36" PT - -- AL
NEW PARTITION WALL
NO. DESCRIPTION
FLOOR BASE CEILING
RM WALL
- FINISH
RM WALL
SUBSTR
ATE
RM
CEILING
HEIGHT
CEILING
REMARKS
SUBSTRATE FINISH SUBSTRATE FINISH SUBSTRATE FINISH
100 EXISTING ELECTRICAL ROOM EXISTING
CONCRETE
- - - EXISTING
CONCRETE
PAINT-PER
SPECS
GWB EXISTING EXISTING
CONCRETE
MATCH EXISTING HEIGHT BOTH
SIDES
GENERAL STRUCTURAL NOTES CONCRETE (CAST-IN-PLACE)
THESE NOTES ARE GENERAL AND SUPPLEMENT THE SPECIFICATIONS. THESE NOTES APPLY TO THE ENTIRE PROJECT UNLESS
MODIFIED OR NOTED OTHERWISE IN THE CONTRACT DOCUMENTS.
STANDARD DETAILS SHALL BE USED WHEN REFERRED TO OR WHEN NO MORE RESTRICTIVE OR DIFFERENT DETAILS ARE SHOWN
ON THE DRAWINGS.
DESIGN IS IN ACCORDANCE WITH AND CONSTRUCTION SHALL COMPLY WITH THE PROVISIONS OF THE F LORIDA BUILDING CODE.
THE DESIGN LOADS AND OTHER DESIGN VALUES GIVEN IN NOTES G-4 THROUGH G-6 WERE USED FOR DESIGN OF STRUCTURES UNLESS NOTED OTHERWISE ON THE DRAWINGS. DESIGN AND CONSTRUCTION OF ALL ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES SHALL COMPLY WITH ACI 350, CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES AND COMMENTARY. ANY STRUCTURES CONTAINING FLUID, PROCESS CHEMICALS OR OTHER MATERIALS USED IN THE TREATMENT PROCESS SHALL BE CONSIDERED ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES, INCLUDING PUMP STATIONS, TANKS, BASINS, AND PROCESS STRUCTURES.
LIVE LOADS:
C-1
C-2
G-1
G-2
G-3
G-4
STRUCTURAL METALS
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
M-13
M-14
M-15
DETAIL, FABRICATE, AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH ANSI/AISC 360 SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS, LATEST EDITION.
STEEL MATERIAL:
A) STRUCTURAL HSS: ASTM A500, GRADE C (46/50 KSI) OR A1085 GRADE A (50 KSI)
B) STRUCTURAL PIPE: ASTM A53, GRADE B (35 KSI)
C) PLATES AND BARS: ASTM A36 UNO (36 KSI)
D) STRUCTURAL W, C, & MC SHAPES: ASTM A992 (50 KSI)
E) STRUCTURAL HP, M, S, & L SHAPES: ASTM A572 GRADE 50 (50 KSI)
F) ANCHOR RODS: ASTM F1554 GRADE 55 (55 KSI)
PROVIDE MINIMUM 3/4" DIAMETER ASTM F3125 GRADE A325 TYPE 1 OR GRADE F1852 TYPE 1 HIGH STRENGTH BOLTS WITH SNUG TIGHTENED TYPE N CONNECTIONS FOR STRUCTURAL STEEL UNLESS NOTED OTHERWISE. HOLES FOR BOLTS SHALL BE
STANDARD SIZE UNLESS NOTED OTHERWISE.
PROVIDE TYPICAL STEEL BEAM CONNECTIONS FOR A CAPACITY OF NOT LESS THAN ONE HALF OF THE TOTAL UNIFORM LOAD CAPACITY TABULATED IN THE AISC TABLES FOR ALLOWABLE LOADS OF BEAMS UNLESS NOTED OTHERWISE.
DO NOT PAINT STEEL SURFACES WHICH ARE TO BE WELDED OR ARE TO BE ENCASED IN CONCRETE.
DETAIL, FABRICATE, AND ERECT STRUCTURAL STAINLESS STEEL IN ACCORDANCE WITH ANSI/AISC 370 SPECIFICATION FOR STRUCTURAL STAINLESS STEEL BUILDINGS, LATEST EDITION. ALL STAINLESS STEEL FABRICATIONS EXPOSED TO UNDERWATER SERVICE, IN CONFINED AREAS CONTAINING FLUID, AND IN CORROSIVE ENVIRONMENTS SHALL BE TYPE 316. ALL OTHER
STAINLESS STEEL FABRICATIONS SHALL BE TYPE 304 UNLESS NOTED OTHERWISE.
ALUMINUM SHALL BE ALLOY 6061-T6 UNLESS NOTED OTHERWISE.
ALL BOLTS, ANCHORS, AND CONCRETE ANCHORS CONNECTING ALUMINUM OR STAINLESS STEEL SHALL BE STAINLESS STEEL TYPE 316 FOR UNDERWATER APPLICATIONS, IN CONFINED AREAS CONTAINING FLUID, AND IN CORROSIVE ENVIRONMENTS AND
TYPE 304 FOR ALL OTHER APPLICATIONS.
ALUMINUM SHALL BE ISOLATED FROM CONTACT WITH CONCRETE AND DISSIMILAR METALS.
ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION.
FILLET WELD SIZES SHALL NOT BE LESS THAN THE MINIMUM SIZE REQUIRED BY AISC CODE FOR PLATE SIZES TO BE CONNECTED AND SHALL BE APPLIED TO THE ENTIRE JOINT CONTACT LENGTH, AND NOT LESS THAN 3/16".
ALL WELDS SHALL BE PERFORMED IN THE SHOP UNLESS NOTED BY A FIELD WELD SYMBOL OR APPROVED BY ENGINEER.
BOTTOM SURFACES OF BASE PLATES SHALL BE GROUTED TO ENSURE FULL BEARING CONTACT WITH CONCRETE SLAB.
WHENEVER ONE MEMBER IS FASTENED TO ANOTHER WITH FASTENINGS (BOLTS, WELDS, ETC.) SET AT A UNIFORM SPACING, A MINIMUM OF TWO FASTENINGS PER PIECE SHALL BE CONNECTED AND THE FIRST AND LAST FASTENINGS SHALL BE LOCATED
NOT TO EXCEED 0.25 OF FASTENER SPACING FROM EACH END.
GRATING PANELS SHALL BE CONFINED TO PREVENT MOVEMENT PER STANDARD DETAIL S-05-0706. USE OF GRATING CLIP
ATTACHMENT IS NOT ACCEPTABLE TO PREVENT GRATING MOVEMENT.
DESIGN OF CONCRETE ELEMENTS INCLUDING WALLS, FORMED SLABS, BEAMS, AND COLUMNS IS IN ACCORDANCE WITH ACI 318 (CODE REQUIREMENTS FOR STRUCTURAL CONCRETE) AND 350 (CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING
CONCRETE…