W91QV119R0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

STATEMENT OF WORK

Statement of Work For Conmy Hall Integrated Theatrical Lighting and Audio System Upgrade

1. Background.

1.1 Conmy Hall, located on historic Joint Base Myer-Henderson Hall (Fort Myer), Virginia, is a 35,000 SQF historic brick structure configured to conduct premier indoor ceremonial and special events for the United States Army. It is also used as an indoor venue for The White House (WH), Department of Defense (DOD), Department of the Army (DA) and U.S. Army Military District of Washington-Joint Force Headquarters-National Capital Region (USAMDW/JFHQ-NCR) ceremonies, exercise support, musical performances, and special events. The facility is used by The 3rd United States Infantry Regiment "The Old Guard” (TOG) and The United States Army Band "Pershing’s Own” (TUSAB) for ceremonial training and special events.

Conmy Hall consists of a rectangular polyurethane performance floor approximately 125 feet wide by 225 feet long surrounded on three sides by theatrical style seating area (1200 person capacity). The brick back wall serves as a backdrop for the ceremonial activities/parades and also accommodates the two large entry doors that enable marching elements to enter and exit the performance floor. There is a 12” inch by 12” inch by 20’ foot (plus corner blocks) custom built Thomas truss system running the length and width of the performance area, approximately 23 feet off of the concrete floor (the bottom of the trussing is approximately 21’ feet off the concrete floor. The truss configuration allows for an infinite number of lighting positions for the 140-plus 575w & 750w incandescent ellipsoidal and par fixtures currently installed in a fixed-focus configuration. This system is inefficient and limits the capabilities and use of this facility. Upgrading to dynamic focus fixtures would increase the types of events that can be supported in this facility. Additionally, upgrading to high-efficiency LED type fixtures will significantly reduce energy consumption.

The lighting system is currently comprised of an ETC dimming system with approximately 768 dimmers and an ETC lighting console. The current sound system can best be described as a sports hall loudspeaker system.

The proposed sound and theatrical lighting system is required for a series of applications including presentations, official military ceremonial reviews, drills, multi-media theatrical productions, musical performances, and award ceremonies.

2. Objectives/Scope.

2.1. The Contractor shall provide an integrated concert-grade performance sound and theatrical lighting system in Conmy Hall, a historic ceremonial event facility, to improve and update technical capabilities to better accommodate current ceremonial/theatrical uses and improve participant listening and viewing experiences. Upgrading shall help to create a facility that is more cost effective and energy efficient.

3. Specific Tasks.

3.1 General

3.1.1 The Contractor shall obtain all permits required to perform the required services on this contract. All permits obtained by the Contractor shall be maintained current throughout the entire period of performance of the contract.

3.1.2 All equipment, components and mounting hardware (to include rack ears, mounting plates, bolts and hardware) shall be new and complete. Used, reconditioned or manufacture’s “B” stock is not acceptable.

3.1.3 All components and systems shall be tested by the Contractor prior to shipping to site.

3.1.4 All bolts and fasteners shall be Grade 5 or better and shall include an approved locking mechanism.

3.1.5 All wire sizes shall comply with UL standards and local codes.

3.1.6 All wiring shall be contained in neat, combined harnesses or bundles using appropriate cable ties. Loose wiring is not acceptable.

3.1.7 All wiring connections must be terminated to terminal strip, connector or punch block. Wire to wire (flying splice) connections are not acceptable.

3.1.8 All 3-pin XLR connectors shall be wired pin-2 hot.

3.1.9 Unless otherwise stated, all rack-mounted components shall be mounted to Electronic Industries Alliance (EIA) racks using professional grade rack-mounting accessories per EIA standard.

3.1.10 All materials used shall be new and of good quality conforming to the contract specifications and review submittals. In the event that a specified product is recalled by the Manufacturer, the contractor shall notify the COR immediately and offer a replacement for the recalled product.

3.1.11 Property Damage: The contractor shall not cause damage to government buildings, areas, or equipment. The contractor shall report an incident of property damage to the COR immediately in writing. The contractor shall be responsible for the cost of repairing or replacing any damage Government equipment/structures.

3.1.12 The physical conditions of Conmy Hall indicated on government drawings and/or specified as the result of site investigations by visual surveys or record drawings may not represent an as-built condition. Therefore, the contractor is responsible for checking and verifying all dimensions.

3.1.13 The contractor is responsible for verifying all dimensions, quantities, connectivity and performance of components to insure their suitability of use.

3.1.14 On-site parking is limited. The contractor shall coordinate with the Contracting Officer Representative for specific parking areas.

3.1.15 The contractor shall clean and dispose of waste materials, debris and rubbish during installation on a daily basis.

3.2 Key Personnel

3.2.1 The contractor shall provide a project manager who shall be responsible for the performance of the work. The name of this person, and an alternate who shall act for the project manager in his/her absence, shall be designated in writing to the contracting officer. The project manager or alternate shall have full authority to act for the contractor on all contract matters related to the daily operation of this contract.

3.2.2 The vendor shall also provide the services of field-service technicians certified by ETC, Martin Lighting, d&b Audiotechnik, DANTE, Crestron and High End Systems. The Contractor shall provide copies of current certifications at time of bid.

3.2.3 Technicians. The technicians shall be factory trained and authorized to provide startup services, fixture setup and training, and console setup and training. The technicians shall be local, full-time employees of the vendor. The Contractor shall provide copies of current certifications at time of bid.

3.2.4 Lighting Controller. The contractor shall provide a programmer with 5 years minimum experience programming the specified High End, HOG lighting controller. Experience must include multiple cue lists, event list programming, LED color mixing, DMX and lighting networks. The Contractor shall provide copies of current certifications at time of bid.

3.2.5 Systems Integrator. The Contractor shall provide a System Integrator with a minimum of 5 years of experience. Integrator must have a history working with both DMX and Ethernet based data distribution systems, theatrical control systems (specifically the High End Hog), theatrical and architectural lighting fixtures, and light fixture mounting.

3.3 Sound System Package

3.3.1 The required design shall include engineering, equipment, installation and services to provide an operational, turnkey sound system. The sound system design described shall provide a drastic improvement that enhances the quality of every event conducted in Conmy Hall. The specification shall include sound system equipment as utilized in high-profile concert venues. High-fidelity equipment is required to provide excellent speech intelligibility and high-quality music reproduction. The audio system shall utilize DANTE where possible and must be able to be controlled via the existing or an updated version of a Crestron control system. The proposal shall detail a complete integrated sound system that includes design, engineering services, equipment, a materials schedule, CAD drawings, project management, integration services, testing, training, commissioning and technical support during initial events.

The contractor shall design, supply, install, test and provide a complete and fully functional integrated state-of-the-art sound system package brand name d&b Audiotechnik equipment. The Government currently has d&b Audiotechnik equipment and the system shall be compatible. The d&b audiotechnik sound system equipment list is as follows:

d&b Main, Left and Right Speaker Array d&b Floor Monitor Speaker System (8 x E8 or E12 monitors with amplifiers with cases to power/drive those monitors, speaker cable in various lengths (4x50’, 4x25’, 4x10’).

d&b Permanent Seating Distributed Speaker Solution d&b Floor Reinforcement Distributed Speaker Solution d&b Digital Audio Processing (Main, Floor, Seating & Monitors Systems) d&b 4Ch 96k DSP/Hi-Power Amplifiers (Main, Floor, Seating & Monitors Systems) d&b Speaker Mounting Frames/Hanging Hardware (Main, Floor, Seating & Monitors Systems) d&b System Control Software (Main, Floor, Seating & Monitors Systems) DANTE/AES Interface, Ethernet (Main, Floor, Seating & Monitors Systems)

3.3.2 The contractor shall provide and install new left, center and right loudspeaker coverage in the main seating areas to provide high-fidelity, hi-power reinforcement of official ceremonies, live music and special events. The new loudspeakers system shall cover the entire floor area separately (or be able to isolate the floor) from the main seating areas. Due to the low ceiling height of the venue, special attention needs to be paid to sightlines so as not to impact the viewing of the new LED wall. The system design should avoid third party audio processors or routers to avoid additional digital conversions to provide the best fidelity. The loudspeaker models shall be of the same type as used in music venues.

3.3.3 The contractor shall provide a loudspeaker module processed and powered with a dedicated, hi-power amplifier channel enabling d&b “Array Processing” to be deployed, to allow a similar level and frequency response to be delivered across the entire Conmy Hall seating area.

3.3.4 The contractor shall provide side-fill, front-fill and monitor loudspeakers. A complete side-fill system shall be comprised of a pair of hi-power point source loudspeakers, subwoofers, stand hardware and dollies. It shall also be capable to serve as a stand-alone operation as a complete, compact sound system. A complete monitor loudspeaker system will be included and shall compliment the main loudspeakers.

3.3.5 The contractor shall provide a main Cardioid subwoofer horizontal array to minimize energy onto the stage area and provide a more even LF response across Conmy Hall.

3.3.6 The contractor shall provide multiple hi-power, point source perimeter loudspeakers to provide direct coverage of the Conmy Hall fixed seating area. Loudspeakers shall be configured in a delay ring and arranged in an equidistant radius to provide proper time-alignment to a stage and the main loudspeakers.

3.3.7 The contractor shall provide loudspeaker drive lines, mix console interface through digital DANTE inputs to amp rack interfaces that deliver AES digital mix stems to the amplifiers.

3.3.8 The contractor shall provide prediction simulations of the loudspeaker system over the multiple Conmy Hall seating area using Array Calculation software. This software shall enable custom control panels and ensure a complete loudspeaker component test to check and verify the operational condition of all system transducers.

3.3.9 The proposed audio system will be required to interface with the existing Crestron control system. The existing system is designed to provide a “Performance” and “Utility” mode. Utility Mode allows for key microphone inputs to be utilized without having to turn on the audio console so the system may be operated without an engineer present. When in Performance Mode, the Crestron controller allows for the full system to be operated from the audio console, with the capability to mute different zones as needed for different events. This also allows the floor area to be isolated from the main seating speaker coverage.

3.3.10 The contractor shall provide a minimum of eight (8) hours of training for the Government’s operating personnel on the proper operation and troubleshooting of the sound system package and provide a minimum of eight (8) hours of maintenance training to ensure Government personnel can provide basic troubleshooting and user-level maintenance for all installed sound equipment and systems. Training will take place upon completion of the installation.

3.3.11 The contractor shall provide maintenance manual(s) after final acceptance of the installed system. Complete technical data, instructions and parts catalog(s) shall be included for all mechanical, electrical and electronic equipment.

3.3.12 The contractor shall provide CAD drawings detailing all loudspeaker component locations, rigging geometry, rack elevations, schematic drawings and custom connection panels.

3.4 Lighting System

3.4.1 The required design shall include engineering, equipment, installation and services to provide an operational, turnkey lighting system. The lighting system design described shall provide a drastic improvement that enhances the quality of every event conducted in Conmy Hall. The specification shall include state-of-the-art lighting system equipment as utilized in high-profile concert and theatrical venues. High quality equipment is required to provide an immersive theatrical experience for the audience. The lighting system shall utilize at a minimum, the equipment specified by the Government as listed in the provided drawings. The entire lighting system must be able to be controlled via the existing High End Hog 4 lighting console. The proposal shall detail a complete integrated lighting system that includes design, engineering services, equipment, a materials schedule, CAD drawings, project management, integration services, testing, training, commissioning and technical support during initial events.

The contractor shall supply, install and test and provide a complete and fully functional integrated lighting system as outlined in the Government-furnished drawings utilizing the following LED Lighting System Equipment:

191 x ETC Source 4 Series 2 Led Daylight HD Light Engine Body And Shutter Barrel, Black 21 x Source 4 Series 19 Degree Enhanced Lens Tubes with Color Frame 120 x Source 4 Series 26 Degree Enhanced Lens Tubes with Color Frame 30 x Source 4 Series 36 Degree Enhanced Lens Tubes with Color Frame 38 x Source 4 Series 50 Degree Enhanced Lens Tubes with Color Frame 117 x ColorSource PAR, Black with color frames and 117 x wide flood lenses and 117 x medium flood lenses 24 x Martin MAC Quantum Profile Moving Head Fixtures in Cardboard 2 x Martin MAC Quantum Profile Moving Head Fixtures in 2-Unit Flight Case 24 x Martin MAC Quantum Wash Moving Head Fixtures in Cardboard 2 x Martin MAC Quantum Wash Moving Head Fixtures in 2-Unit Flight Cases 1 x Hog 4 Control Console in Road Case 1 x Playback Wing 4 (High End) 1 x Wing 4 Road Case (High End) 2 x ProPlex IQ One 8 2 x 1u Single Rack Space Metal Rack with Truss Mount for the ProPlex IQ One 8 1XPCI Truss Mount for 1u Rack Mount Equipment 18 x High output LED RGBA emitters, DMX controlled floor mounted Cyc wash fixtures.

3.4.2 The contractor shall provide the lighting system as outlined in the Government-furnished drawings utilizing energy-efficient LED technology and fully programmable lighting fixtures (Attachment 1).

3.4.3 The four (4) follow-spot platforms will remain as is, with new, more efficient and quieter follow-spots replacing the existing follow-spots. The follow-spots will be 1200w, HMI, manually dimmable lights. These lights will need to produce a beam size of 8’ (foot) in diameter at 16’ (feet) and maintain that diameter to a distance of 100’ (feet).

3.4.4 All existing theatrical fixtures will be removed by the Government.

3.4.5 The house light system remains unchanged.

3.4.6 The control racks in the control room and dimmer room remain.

3.4.7 The contractor shall install an Ethernet distribution system to the truss, unless a detailed site survey shows that an existing distribution system is in place and functional.

3.4.8 Power for light fixtures must be non-dim, and will be provided by existing dimmers configured in “switched” mode.

3.4.9 The Government requires the High End Systems Hog series of consoles.

3.4.10 The contractor shall provide a minimum of sixteen (16) hours of training (2 x 8 hour days) for the Government’s operating personnel on the proper operation and troubleshooting of the theatrical lighting equipment/system and provide a minimum of sixteen (16) hours of training to facility maintenance and electrical staff to ensure that Government personnel can provide basic troubleshooting and maintenance for all installed theatrical lighting equipment and systems. Training will take place upon completion of the installation.

3.4.11 The contractor shall provide maintenance manual(s) after final acceptance of the installed system. Complete technical data, instructions and parts catalog(s) shall be included for all mechanical, electrical and electronic equipment.

3.4.12 The contractor shall provide updated CAD drawings if the Government-provided drawings or specifications are altered.

3.4.13 All Two Pin & Ground (2P&G) connectors that will be used to power the new LED fixtures shall be replaced with 15 amp female Hubbell type connectors (approximately 115). Therefore all LED fixture should be outfitted with the male version of that type of connector. The cables that are used to interconnect the LED fixtures may remain PowerCon from the manufacturer. The connectors in the performance area and the dimmer modules in the dimmer room must be labeled with ETC Non-Dim labels.

3.4.14 The contractor is responsible for setting up the Hog 4 console so that incorporates the existing equipment with the new equipment as well as program the console with the assistance of the Governments lighting representative. This programming will include the basic ceremonial lighting focus areas, cue lists and universe configuration.

3.5 Additional Requirements.

3.5.1 Testing. The Contractor shall conduct an operating test of both systems once installed. The systems shall test free from grounds, shorts and other faults and perform in accordance with the manufacture performance standards. All connections will be thoroughly checked for mechanical and electrical connectivity. All installs shall operate in accordance with the requirements set forth in the specifications as shown on the Contractor drawings.

3.5.2 The Contractor shall perform all performance tests in the presence of the Contracting Officer’s Representative (COR).

3.6 Contractor Training.

3.6.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the Contracting Officer’s Representative (COR) or to the Contracting Officer. AT Level 1 awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf.

3.6.2 iWatch Training: The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employee’s commencing performance. iWATCH training results shall be reported to the COR not later than 45 calendar days after contract award.

3.6.3 Operations Security (OPSEC) Training: Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. Level I OPSEC training is available at the following website: http://cdse.edu/catalog/elearning/GS130.html.

3.6.4 Antiterrorism Considerations: In accordance with DFARS, 22 December 2016, 207.105(d), and DoD Instruction O-2000.16, Volume 1, DoD Antiterrorism Standards, the contractor is hereby advised that it shall comply with the policies and procedures of the U.S. Antiterrorism Officer (ATO) at each installation where work is being performed. DoD Instruction O-2000.16, Volume 1 is available at the Washington Headquarters Services website at http://www.esd.whs.mil/Directives/issuances/dodi/.

3.7 Installation.

3.7.1 The Contractor shall be responsible for coordination between the electrical installation and other trades installing sound and theatrical lighting system equipment and for control terminations, system startup, system training, and warranty repair.

3.7.2 The Contractor shall provide and test all necessary equipment and provide a complete and functional system.

3.7.3 The Contractor shall be responsible for verifying mounting compatibility and plenum clearances of all lighting and projection fixtures. The Contractor shall notify the Government of any conflicts with structure, electrical, HVAC or plumbing prior to the ordering of the specified equipment.

3.7.4 The Contractor shall verify compliance of all sound and theatrical lighting system equipment specified, in its intended application on this project, to ensure it complies with all applicable national and local codes, ordinances, regulations, and jurisdictions prior to ordering equipment.

3.7.5 The Contractor shall not replace, substitute, alter or exchange equipment, materials or specifications, as provided, without the approval of the Government.

3.7.6 The Contractor shall abide by all statutes, applicable regulations, publications, manuals, and federal policies and procedures. Information will be provided after contract award upon Contractor’s request.

3.7.7 Safety: The Contractor shall ensure the safety of all Contractor personnel and tasks performed by complying with all applicable federal, state and local safety directives. The Contractor shall notify the COR of any Occupational Safety and Health Administration (OSHA) visits to the base or complaints received by OSHA. If a safety procedure or condition exists which compromises the safety of Contractors, government personnel or an Army asset, the Contractor shall be directed through the appropriate authorities to take corrective action.

3.7.8 Mishaps Reporting: The Contractor shall report all mishaps involving any person sustaining injury or illness resulting from Contractor operations and all mishaps involving government property or equipment damaged by the Contractor to the COR with 24hrs. A written report shall be submitted to the COR within five (5) workdays.

3.7.9 Mishaps Investigation: The Government has the authority to conduct investigations of all mishaps (including vehicular) involving Contractor personnel, government property, facilities, or equipment or to participate in the contractor’s investigation of Contractor mishaps. The Contractor shall participate in, and cooperate with, government mishap investigations related to work performed in support of the resultant contract.

3.8 Warranty. The Contractor shall provide warranties associated with the supplies and services after final acceptance of the installed system.

3.8.1 This warranty shall not include any consumable items.

3.8.2 This warranty shall not void specific warranties issued by manufacturers or contractor for greater periods of time. Nor shall it void any rights guaranteed to the Government by law.

3.8.3 The contractor shall provide the Government with exact beginning and ending dates of the warranty period. Include the name of the person to call for service and telephone number.

4. Applicable Performance Standards. All equipment provided shall be brand new. Returned or refurbished equipment is not acceptable. The Contractor shall complete all specific tasks in a timely and professional manner. The Government will ensure logistical availability to the Contractor between the U.S. Army Military District of Washington (USAMDW) core hours of 7:00AM to 4:30PM, arriving no earlier than 7:00 AM and departing no later than 4:30 PM Monday thru Friday, except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. The Contractor shall not start perform work in Conmy Hall until 01 July 2019. The Contractor can drop off Conex containers, deliver equipment and have access to Conmy Hall prior to 01 July 2019. The dates and times of the aforementioned drop off, deliveries and access shall be coordinated with the Government POC after award of Contract. The Government anticipates the Contractor cannot perform the work identified in the Statement of Work during the last week of each month starting in the month of July 2019. The Contractor and Government will work out a more detailed, concrete schedule to complete the work identified in the Statement of Work during the Post Award Conference to ensure the Contractor work does not get in the way of events/ceremonies taking place in Conmy Hall.

5. Delivery Schedule. The Contractor shall deliver, install, test and train identified personnel not later than 150 days after the contract has been awarded. The Government will be on hand to inventory, inspect and accept all items during installation. The Government reserves the right to extend or modified the deliverable schedule based on the needs of the Government with coordination and agreement of the Contractor.

6. Government Furnished Equipment and Services.

6.1 Utilities: All utilities in the facility will be available for the Contractor’s use in performance of duties outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities.

6.2 Facilities: The Government will furnish the necessary workspace in Conmy Hall for the Contractor staff to provide the support outlined in this SOW.

6.3 Electrical and Lighting Work: There will be electrical power located in different areas of the facility depending on the final design. The Government is aware of the requirement and will provide additional electrical relocation work required for the proper operation of the audio system. Prior to the start of work, after all new equipment has been received, all existing theatrical fixtures will be removed by the Government. The existing Conmy Hall House Light System shall remain intact/unchanged. The control racks in the control room and dimmer room shall remain. The Follow Spot platforms remain as is, with new, more efficient, and quieter Follow Spots replacing the existing Follow Spots.

7. Security Requirements.

7.1 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

7.2 Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office within five (5) days of the start date of the employee beginning to work on this contract. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

The security requirement for this contract is a favorable National Agency Check with Written Inquires (NACI) background investigation. The Contractor shall ensure that all personnel performing under this contract meet this requirement.

7.3 Search and Seizure. Contractor personnel and property shall be subject to search and seizure upon entering and departing the confines of Joint Base Myer-Henderson Hall. Contractor personnel or any representative of the contractor shall abide by all security rules and regulations which will be provided upon Contractor request after contract award.

7.4 Installation Access. The Contractor shall comply with and meet all access control requirements for personnel, vehicles and deliveries. The Contractor shall be responsible for ensuring that all Contractor personnel authorized to perform under this contract obtain installation access. Within five (5) workdays after contract award, the Contractor shall submit to the Contracting Officer and the COR the names of ALL personnel working under this contract. Changes to the Contractor personnel list shall be submitted within 24 hours of the change taking place. All Contractor employees shall have on them, at all times, positive photographic identification.

7.5 The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. The security and sensitivity of Government-provided documents is the responsibility of the contractors during lifecycle of this contract. At the close of each work period, Government facilities, equipment, and materials shall be secured.

8. Contracting Officer’s Representative (COR): The COR will be nominated by the requiring activity and appointed by the contracting officer by separate letter. A copy of the COR’s appointment letter will be sent to the awarded Contractor, identifying the designated duties and limitations of the COR. The COR is authorized to conduct oversight on any and all tasks or requirements and report observations to the Contracting Officer. The COR is not authorized to change any terms or conditions in the contract that pertain to cost, schedule, performance, quality, quantity, or other legal aspects of the resulting order.

9. Place of Delivery and Performance: The place of delivery and performance for this contract is Conmy Hall located at Building 241, Joint Base Myer-Henderson Hall, Virginia – Bldg. 241, Fort Myer VA 22211.

(End of Summary of Changes) image1.wmf