Amendment_4.pdf

PDF 172 KB Posted

Attached to
Ft. Detrick Bldg. 1776 Fire Alarm/Suppression System Upgrades
Solicitation number
W91QV1-18-R-0077
Issued by

View the file

Other files

File Type Posted
Amendment_5.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Solicitation_W91QV1-18-R-0077.pdf PDF
Statement_of_Work.pdf PDF
Amendment_1_W91QV1-18-R-0077-U00001.pdf PDF
Diagrams.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011176110

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A) The purpose of this Amendment is to provide all f inal RFIs and responses.

B) As of the date of this Amendment, the deadline for proposals is set at 4:00 p.m., Tuesday, 18 Sep. This deadline w ill only be extended upon the express authorization of the Contracting Officer.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QV118R0077

X 9B. DATED (SEE ITEM 11)

04-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2018

CODE

MICC-FORT BELVOIR

9410 JACKSON LOOP

BLDG. 1425

FT BELVOIR VA 22060-5116

W91QV1 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QV118R0077

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

FINAL RFIS AND RESPONSES

1. How much percentage is to be used for Sprinkler line replacement (B169) Answer 1 – 25% (replace all sprinkler heads, plus 25% linear feet of total existing sprinkler piping).

2. Where is material staging in relation of the building Answer 2 – Government will provide nearby weatherproof, secure, storage space in B161 (this location was viewed by bidding contractors during recent site survey)

3. What is requirement for Design. Will this be full design or partial (FA/FS, Electrical, Arch.)

Answer 3 – This a 100% Design/Build effort, please consult SOW.

4. What are the Ceiling grid product number (looks like Armstrong 15/16” grid 2’x2’) Answer 4 – Use acoustical tile (Armstrong or approved equal).

5. What is the Ceiling tile product code (looks like FRP smooth panel 2’x2’x3/16”) Answer 5 – Use acoustical tile (Armstrong or approved equal).

6. Can the government provide existing drawings. Scaled drawings are required.

Answer 6 – Already provided As Built Package by AMRDEC file storage via download. However, Government can provide some further scalable documents upon request.

7. What is the existing water pressure Answer 7 – Answered by previous RFI for B1776 project (same for this project). Assistant Fire Chief made it clear that contractor must ascertain hydraulic parameters as needed to design system.

8. Who is responsible for security disconnect and reconnection

Answer 8 – Contractor will coordinate and work with local FGA security POC and provide all material and labor as required. POC info provided after award.

9. Who is responsible for WIFI disconnection and reconnection

Answer 9 – Contractor will coordinate with local FGA Wi‐fi/networking/Fire Department POC(s) and provide all material and labor as required. POC(s) info provided after award.

10. Who is responsible for disconnection and reconnection of speakers in hallway ceilings.

Answer 10 – Contractor is responsible to disconnect and re‐install all speakers, lights, indicators, or other ceiling related appurtenances in a timely fashion and make sure they are operational.

11. If devices are relocated to what extent will painting to be required. Will it only be the affected walls.

Answer 11 – Contractor shall seamlessly relocate devices and fully restore all disturbed locations to the liking of the COR. Therefore, only affected walls shall be fully restored as such.

W91QV118R0077

12. Will ADA requirements be applied for pull stations or mount higher due to the kids or meet ADA and have device cover.

Answer 12 – Per AHJ (Scott Custer), all pull stations shall comply with NFPA 72 and have protective covers in CDC locations, etc.

13. Does the entire FA/FS System need to be 100% completed and commissioned prior to removing the old system.

Answer 13 – Yes.

(End of Summary of Changes)