Custodial__-_PRS_-_Performance_Requirements_Summary.docx
DOCX document 14 KB Posted
- Attached to
- Post Custodial Carlisle Barracks, PA
- Solicitation number
- w91qf0-17-b-0003
About this file
PRS
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS)
| Required Service |
| SSP A, B, and C |
| Maximum Degree of Deviation From Requirement (AQL) |
| Lot Size |
| Method of Surveillance |
| The Proportion of Required Service to Total Contract Price |
1. Remove Trash Sampling Guide 1
| Provide Services as specified by buildings/area IAW TE C, and PWS Para under 3.6 & 3.8 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for reperformance ($27.30 X # of observed defects) |
2. Vacuum Carpet Sampling Guide 2
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.3.2.3 - 3.3.3.3, and 3.5 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for reperformance ($27.30 X # of observed defects) |
| 3. Floor Maintenance Sampling Guide 3 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.3.1 - 3.3.2.2, 3.7.2, and 3.17.1-3.17.2 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 10% of total monthly contract for each building plus re-inspection cost for reperformance ($27.30 X # of observed defects) |
| 4. Drinking Fountains Sampling Guide 4 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.9 |
4%
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| 5. Glass Cleaning Sampling Guide 8 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.11 and 3.12 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
Required Service
SSP A, B, and C
Maximum Degree of Deviation From Requirement (AQL)
Lot Size
Method of Surveillance
The Proportion of Required Service to Total Contract Price
| 6. Spot Cleaning Sampling Guide 7 |
| Provide Services as specified by buildings/area IAW TE C, and PWS 3.3.2.3 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| 7. Rest Rooms Sampling Guide 5 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.7 – 3.7.3 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 10% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| 8. Low/High/Heavy BLDG Dusting Sampling Guide 6 |
| Provide Services as specified by buildings/area IAW TE C, PWS Para 3.10 – 3.10.2 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects |
| 9. Buffing Sampling Guide 8 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.3.2.1 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| 10. Interior & Exterior Window Sampling Guide 8 |
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.11.1 |
| 4% |
| Total number of SF to be cleaned per month |
| Random Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| Required Service |
| SSP A, B, and C |
| Maximum Degree of Deviation From Requirement (AQL) |
Lot Size
| Method of Surveillance |
| The Proportion of Required Service to Total Contract Price |
11. Abnormal/Special Cleaning Services Sampling Guide 8
| Provide Services as specified by buildings/area IAW TE C, and PWS Para 3.15 – 3.16 |
| 2.5% |
| Total number of SF to be cleaned per month |
| Planned Sampling |
| 5% of total monthly contract for each building plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
| 12. Quality Control Sampling Guide 9 |
| Provide daily records of all contractor inspections IAW PWS Para under 4.2 |
| 2.5% |
| Number of records based on inspections. |
| 100% |
| 5% of total monthly contract for CLINS 0001AA-0001AS plus re-inspection cost for re-performance ($27.30 X # of observed defects) |
File details come from the government source that posted it.