Plans_Vol_1_sheets_1_to_171_W912PL19B0005.pdf

PDF 30 MB Posted

Attached to
B2500 Phased Renovation
Solicitation number
W912PL19B0005
Issued by

About this file

Plans - Vol 1 - sheets 1 to 171

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 5321

D

C

B

A

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

F

IL

E N

U M

B E

R

IS

S

U E

D A

T E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

X

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

G re e n w o d P la z a B lv d

G re e n w o o d V ill a g e

C O

S e n a te

A ve n u e

C a m p H ill P

A

S U

B M

IT

T

E D

B Y

US Army Corps of Engineers ®

W ild fl o w e r

C o u rt

N e w

H o p e P

A

L o c a l F ile

AT FULLSIZE: = 1 INCH

/1

/2

:1

:0

P M

B

IM

/0

B

V a n d e n b e rg /6

V a n d e n b e rg

B

A c e n tr a l_ R

A

.r v t

CS

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

V E

R S

H E

E T

B R

E N

O V

A T

IO

N

J

F

IC

K E

S

J

F

IC

K E

S

C

B E

A U

D U

Y

F E

B R

U A

R Y

V a n d e n b e rg

B A c e n tr a l_

R A

.r vt

ISSUED FOR CONSTRUCTION

L O

S A

N G

E L E

S D

IS

T

R

IC

T

J

D e G o u r

W P

L -1

-C

-0

W O

L -1

-R

-0

C e n tr a l F ile B

IM

V a n d e n b e rg

B A c e n tr a l_

R A

.r v t

P ro je c t N u m b e r:

V A

N D

E N

B E

R G

A

IR

F O

R C

E B

A S

E

FEBRUARY 21, 2019 ISSUED FOR CONSTRUCTION

B2500 RENOVATION, VANDENBERG AIR FORCE BASE

4 5321

C

B

A

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

FI

LE

N U

M

BE

R

IS

SU

E D

AT

E:

C H

EC

KE

D B

Y: FI

LE

N

AM

E:

SI

ZE

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

" X

4"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

G re en w od P la za

B lv d G re en w oo d Vi lla ge

, C O

Se na te

A ve nu e

C am p H ill, P

A

SU

BM

IT

TE

D B

Y:

US Army Corps of Engineers ®

W ild flo w er

C ou rt N ew H op e, P A

Lo ca l F ile

AT FULLSIZE: = 1 INCH

7/ 1/

:5

9:

P M

BI

M

B2

Va nd en be rg /6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t

GI001

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

SH

EE

T

IN

D

EX

B2

R

EN

O

VA

TI

O N

J.

F

IC

KE

S

J.

F

IC

KE

S

C . B

EA

U

D U

Y

FE

BR

U

AR

Y

, 2

6_ Va nd en be rg

B

_A

_c en tra l_

R

_A

0.

rv t

ISSUED FOR CONSTRUCTION

LO

S

AN

G

EL

ES

D

IS

TR

IC

T

J.

D eG ou r

W

2P L-

-C

-0

W

2O L-

-R

-0

C en tra l F ile : B

IM

0:

\6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t Pr oj ec t N um be r:

VA

N

D

EN

BE

R

G A

IR

F

O R

C E

BA

SE

ELECTRICAL

EE001 ELECTRICAL SYMBOL LEGEND

EE002 ELECTRICAL PROJECT NOTES

ED101 ELECTRICAL DEMOLITION PLAN - PHASE 1 - AREA 'A'

ED101.1 ELECTRICAL DEMOLITION PLAN, BELOW RAISED FLOOR - PHASE 1 - AREA 'A'

ED101.2 ELECTRICAL DEMOLITION PLAN, ABOVE CEILING - PHASE 1 - AREA 'A'

ED102 ELECTRICAL DEMOLITION PLAN - PHASE 1 - AREA 'B'

ED102.1 ELECTRICAL DEMOLITION PLAN, BELOW RAISED FLOOR - PHASE 1 - AREA 'B'

ED102.2 ELECTRICAL DEMOLITION PLAN, ABOVE CEILING - PHASE 1 - AREA 'B'

EP101 POWER PLAN - PHASE 1 - AREA 'A'

EP102 POWER PLAN - PHASE 1 - AREA 'B'

EL101 LIGHTING PLAN - PHASE 1 - AREA 'A'

EL102 LIGHTING PLAN - PHASE 1 - AREA 'B'

ET101 SYSTEMS PLAN - PHASE 1 - AREA 'A'

ET101.1 SYSTEMS PLAN, BELOW RAISED FLOOR - PHASE 1 - AREA 'A'

ET101.2 SYSTEMS PLAN, ABOVE CEILING - PHASE 1 - AREA 'A'

ET102 SYSTEMS PLAN - PHASE 1 - AREA 'B'

ET102.1 SYSTEMS PLAN, BELOW RAISED FLOOR - PHASE 1 - AREA 'B'

ET102.2 SYSTEMS PLAN, ABOVE CEILING - PHASE 1 - AREA 'B'

EF101 FIRE ALARM PLAN - PHASE 1 - AREA 'A'

EF102 FIRE ALARM PLAN - PHASE 1 - AREA 'B'

ES101 SECURITY PLAN - PHASE 1 - AREA 'A'

ES102 SECURITY PLAN - PHASE 1 - AREA 'B'

ED103 ELECTRICAL DEMOLITION PLAN - PHASE 2 - AREA 'A'

ED103.1 ELECTRICAL DEMOLITION PLAN, BELOW RAISED FLOOR - PHASE 2 - AREA 'A'

ED103.2 ELECTRICAL DEMOLITION PLAN, ABOVE CEILING - PHASE 2 - AREA 'A'

ED104 ELECTRICAL DEMOLITION PLAN - PHASE 2 - AREA 'B'

ED104.1 ELECTRICAL DEMOLITION PLAN, BELOW RAISED FLOOR - PHASE 2 - AREA 'B'

ED104.2 ELECTRICAL DEMOLITION PLAN, ABOVE CEILING - PHASE 2 - AREA 'B'

EP103 POWER PLAN - PHASE 2 - AREA 'A'

EP104 POWER PLAN - PHASE 2 - AREA 'B'

EL103 LIGHTING PLAN - PHASE 2 - AREA 'A'

EL104 LIGHTING PLAN - PHASE 2 - AREA 'B'

ET103 SYSTEMS PLAN - PHASE 2 - AREA 'A'

ET103.1 SYSTEMS PLAN, BELOW RAISED FLOOR - PHASE 2 - AREA 'A'

ET103.2 SYSTEMS PLAN, ABOVE CEILING - PHASE 2 - AREA 'A'

ET104 SYSTEMS PLAN - PHASE 2 - AREA 'B'

ET104.1 SYSTEMS PLAN, BELOW RAISED FLOOR - PHASE 2 - AREA 'B'

ET104.2 SYSTEMS PLAN, ABOVE CEILING - PHASE 2 - AREA 'B'

EF103 FIRE ALARM PLAN - PHASE 2 - AREA 'A'

EF104 FIRE ALARM PLAN - PHASE 2 - AREA 'B'

ES103 SECURITY PLAN - PHASE 2 - AREA 'A'

ES104 SECURITY PLAN - PHASE 2 - AREA 'B'

EP105 ENLARGED PLANS - EXISTING - B2506 & B2509

ED151 ELECTRICAL DEMOLITION NOTES AND TABLES - PHASE 1

ED152 ELECTRICAL DEMOLITION NOTES AND TABLES - PHASE 2

EE211 POWER DETAILS

EE212 POWER DETAILS

EE221 LIGHTING CONTROL SCHEDULES

EE222 LIGHT FIXTURE SCHEDULE

EE223 LIGHTING CONTROL DIAGRAMS

EE224 LIGHTING CONTROL DIAGRAMS

EE231 SYSTEMS DETAILS

EE232 SYSTEMS DETAILS

EE233 SYSTEMS DETAILS

EE241 FIRE ALARM SYSTEM MATRIX & FAMNS GENERAL NOTES

EE242 FIRE ALARM DETAILS

EE251 SECURITY DETAILS

EE252 SECURITY DETAILS

EE253 SECURITY ESCORT LIGHTS CONTROL DIAGRAM

EE261 EXTERIOR BUILDING CONDUITS - SOUTH FACADE AREA 'A' & NORTH FACADE AREA 'B'

EE262 EXTERIOR BUILDING CONDUITS - NORTH FACADE AREA 'A'

EE263 EXTERIOR BUILDING CONDUITS - EAST FACADE AREA 'A'

EE264 EXTERIOR BUILDING CONDUITS - EAST FACADE AREA 'A'

EE265 EXTERIOR BUILDING CONDUITS - SOUTH FACADE AREA 'A' & EAST FACADE AREA 'A'

EE266 EXTERIOR BUILDING CONDUITS - SOUTH FACADE AREA 'A' & 'B'

EE267 EXTERIOR BUILDING CONDUITS - SOUTH FACADE AREA 'B'

EE301 POWER ONE-LINE DIAGRAM - DEMOLITION

EE302 POWER ONE-LINE DIAGRAM - DEMOLITION

EE303 POWER ONE-LINE DIAGRAM - DEMOLITION

EE304 POWER ONE-LINE DIAGRAM - NEW WORK

EE305 POWER ONE-LINE DIAGRAM - NEW WORK

EE306 POWER ONE-LINE DIAGRAM - NEW WORK

EE307 POWER ONE-LINE DIAGRAM - NEW WORK

EE308 MISCELLANEOUS DIAGRAMS

EE309 MISCELLANEOUS DIAGRAMS

EE311 PANEL SCHEDULES

EE312 PANEL SCHEDULES

EE313 PANEL SCHEDULES

EE314 PANEL SCHEDULES

EE315 PANEL SCHEDULES

EE316 PANEL SCHEDULES

FIRE PROTECTION

FP001 FIRE PROTECTION LEGEND & ABBREVIATIONS

FPD101 FIRE PROTECTON DEMOLITION PLAN - PHASE 1 - AREA 'A'

FPD102 FIRE PROTECTON DEMOLITION PLAN - PHASE 1 - AREA 'B'

FP101 FIRE PROTECTION PLAN - PHASE 1 - AREA 'A'

FP102 FIRE PROTECTION PLAN - PHASE 1 - AREA 'B'

FPD103 FIRE PROTECTON DEMOLITION PLAN - PHASE 2 - AREA 'A'

FPD104 FIRE PROTECTON DEMOLITION PLAN - PHASE 2 - AREA' B'

FP103 FIRE PROTECTION PLAN - PHASE 2 - AREA 'A'

FP104 FIRE PROTECTION PLAN - PHASE 2 - AREA 'B'

FP701 FIRE PROTECTION DETAILS

PLUMBING

PP001 PLUMBING LEGEND & ABBREVIATIONS

PP101 PLUMBING PLAN - PHASE 1 - AREA 'A'

PP102 PLUMBING PLAN - PHASE 1 - AREA 'B'

PD100 PLUMBING UNDERSLAB DEMOLITION PLAN - PHASE 2 - AREA 'A'

PD103 PLUMBING DEMOLITION PLAN - PHASE 2 - AREA 'A'

PP100 PLUMBING UNDERSLAB PLAN - PHASE 2 - AREA 'A'

PP103 PLUMBING PLAN - PHASE 2 - AREA 'A'

PP501 PLUMBING ISOMETRICS

PP601 PLUMBING SCHEDULES

PP701 PLUMBING DETAILS

MECHANICAL

MM001 MECHANICAL LEGEND & ABBREVIATIONS

MM002 MECHANICAL GENERAL NOTES

MD101 MECHANICAL DEMOLITION PLAN - PHASE 1 - AREA 'A'

MD102 MECHANICAL DEMOLITION PLAN - PHASE 1 - AREA 'B'

MH102 MECHANICAL HVAC PLAN - PHASE 1 - AREA 'B'

MP101 MECHANICAL PIPING PLAN - PHASE 1 - AREA 'A'

MP102 MECHANICAL PIPING PLAN - PHASE 1 - AREA 'B'

MD103 MECHANICAL DEMOLITION PLAN - PHASE 2 - AREA 'A'

MD104 MECHANICAL DEMOLITION PLAN - PHASE 2 - AREA 'B'

MH103 MECHANICAL HVAC PLAN - PHASE 2 - AREA 'A'

MH104 MECHANICAL HVAC PLAN - PHASE 2 - AREA 'B'

MP103 MECHANICAL PIPING PLAN - PHASE 2 - AREA 'A'

MP104 MECHANICAL PIPING PLAN - PHASE 2 - AREA 'B'

MM401 MECHANICAL ENLARGED PLANS

MM402 MECHANICAL SECTIONS

MM501 MECHANICAL PIPING ISOMETRIC

MM502 MECHANICAL PIPING DIAGRAMS

MM601 MECHANICAL SCHEDULES

MM602 MECHANICAL SCHEDULES

MM603 MECHANICAL CONTROL DIAGRAMS

MM604 MECHANICAL CONTROL DIAGRAMS

MM605 MECHANICAL CONTROL DIAGRAMS

MM606 MECHANICAL CONTROL DIAGRAMS

MM701 MECHANICAL DETAILS

MM702 MECHANICAL DETAILS

MM703 MECHANICAL DETAILS

GENERAL

CS COVER SHEET

GI001 SHEET INDEX

GI101 BUILDING INFORMATION & CODE PLAN

GI102 CODE ANALYSIS AND OCCUPANT LOADS

GI103 SEQUENCE OF CONSTRUCTION

GI104 ATFP STANDOFF DISTANCES

CIVIL

TC001 TEMPORARY CONSTRUCTION PLAN

C001 SITE HAUL PLAN

C002 UTILITY PLAN

C003 DEMOLITION PLAN

C004 GRADING AND PAVING PLAN

C005 GRADING AND PAVING DETAILS

STRUCTURAL

S001 GENERAL STRUCTURAL NOTES I

S002 GENERAL STRUCTURAL NOTES II

S003 GENERAL STRUCTURAL NOTES III

S200 SECTIONS AND DETAILS

ARCHITECTURAL

AE001 GENERAL NOTES, SYMBOLS, LEGENDS & ABBREVIATIONS

AE002 ABA ACCESSIBILITY NOTES

AD101 DEMOLITION PLAN - PH1

AE101 FLOOR PLAN - PH1

AD102 DEMOLITION PLAN - PH2

AD103 DEMOLITION PLAN - PH2

AE102 FLOOR PLAN - PH2

AE103 FLOOR PLAN - PH2

AD104 DEMO REF CLG PLAN - PH1

AE104 REFLECTED CELING PLAN - PH1

AD105 DEMO REF CLG PLAN - PH2

AD106 DEMO REF CLG PLAN - PH2

AE105 REFLECTED CEILING PLAN - PH2

AE106 REFLECTED CEILING PLAN - PH2

AE107 ROOF PLAN

AE108 ROOF PLAN

AE109 FINISH PLAN - PHASE 2 - AREA 'A'

AE110 FINISH PLAN - PHASE 2 - AREA 'B'

AD201 DEMO ELEVATIONS

AE201 ELEVATIONS

AD301 DEMO SECTIONS

AD302 DEMO SECTIONS

AE301 SECTIONS

AE302 SECTIONS

AE401 ENLARGED PLANS

AE402 CASEWORK SECTIONS

AE403 INTERIOR ELEVATIONS

AE404 INTERIOR ELEVATIONS

AE405 ENLARGED STAIR PLANS DETAILS

AE406 ENLARGED STAIR PLANS DETAILS

AE407 ENLARGED ENTRANCE ELEVATIONS

AE501 DETAILS

AE502 DETAILS

AE503 DETAILS

AE601 MATERIAL SCHEDULE

AE602 ROOM FINISH SCHEDULE

AE603 SIGNAGE SCHEDULE AND DETAILS

AE604 DOOR SCHEDULE

AE605 DOOR AND WINDOW DETAILS

AE606 DOOR AND WINDOW DETAILS

AE607 PARTITION TYPES

AE701 FLOORING PLAN - PH1

AE702 FLOORING PLAN - PH2

AE703 FLOORING PLAN - PH2

AE801 DEMOUNTABLE PLAN - PHASE 2 - AREA 'A'

AE802 DEMOUNTABLE PLAN - PHASE 2 - AREA 'B'

INTERIORS

AF101 FURNITURE PLAN - PHASE 2 - AREA 'A'

AF102 FURNITURE PLAN - PHASE 2 - AREA 'B'

AF103 FURNITURE TYPICALS

AF104 FURNITURE TYPICALS

SHEET INDEX

B

50 5050

50 5050 50 50

50 5050

4545 454545

4545 454545

45 4545 45

45 4545

45 4545

BB BB

B B

B

B

BB

45 45

45 4545 45

5050 50

5050 5050

5050 5050505050 5050

505050 5050

NOTE:

PROVIDE PHYSICAL SECURITY AT THE SECURE ENVELOPE BOUNDARY IN ACCORDANCE

WITH ICD/ICS 705, VERSION 1.4 DATED SEPTEMBER 28, 2017, AND UFC 4-010-05 WITH

CHANGE 1, DATED OCTOBER 1, 2013. SECURE BOUNDARY SHALL INCLUDE ALL APPLICABLE

CONSTRUCTION ELEMENTS REQUIRED FOR A “CONTINUOUS OPERATION” CLASSIFICATION.

AREA NAME

150 SF 00

00 OCC.

INDICATES NUMBER OF OCCUPANTS EXITING THROUGH

INTERIOR DOOR

EGRESS PATH WITH NAME, SEGMENT LENGTH, AND

DIRECTION INDICATED

ROOM (NET) AND AREA (GROSS) TAGS INDICATING SQUARE

FOOTAGE / OCCUPANCY LOAD FACTOR, AND RESULTING

OCCUPANCY BELOW

1 HOUR FIRE BARRIER PER IBC SECTION 707. OPENINGS

FIRE RATED FOR ONE HOUR.

EgressPathName

FIRE ALARM CONTROL PANELFACP

ACCESSORY STORAGE AREAS, MECHANICAL EQUIPMENT ROOM

BUSINESS AREAS

BALLISTIC RATED PARTITION

ACOUSTIC RATED ASSEMBLY EQUAL TO OR GREATER THAN STC 45

SECURE BOUNDARY

ACOUSTIC RATED ASSEMBLY EQUAL TO OR GREATER THAN STC 50

CER ROOM

3562 SF

IBC: 36 OCC.

NFPA: 24 OCC.

CONFERENCE

ROOM

720 SF

IBC: 8 OCC.

NFPA: 5 OCC.

BREAK ROOM

561 SF

IBC: 6 OCC.

NFPA: 4 OCC.

ESH ROOM

583 SF

IBC: 6 OCC.

NFPA: 4 OCC.

ESH OFFICE #1

132 SF

IBC: 2 OCC.

NFPA: 1 OCC.

ESH OFFICE #2

123 SF

IBC: 2 OCC.

NFPA: 1 OCC.

BUILD ROOM

554 SF

IBC: 6 OCC.

NFPA: 4 OCC.

COMM ROOM

12A

279 SF

IBC: 1 OCC.

NFPA: 1 OCC.

MECHANICAL

ROOM

518 SF

IBC: 2 OCC.

NFPA: 2 OCC.

UTILITY ROOM

327 SF

IBC: 2 OCC.

NFPA: 2 OCC.

ELECTRICAL

ROOM

293 SF

IBC: 1 OCC.

NFPA: 1 OCC.

WOMEN'S

ROOM

254 SF

IBC: 3 OCC.

NFPA: 2 OCC.

MEN'S ROOM

334 SF

IBC: 4 OCC.

NFPA: 3 OCC.

JAN CLO

45 SF

IBC: 1 OCC.

NFPA: 1 OCC.

PSO ROOM

934 SF

IBC: 10 OCC.

NFPA: 7 OCC.

SHREDDER

ROOM

15A

265 SF

IBC: 1 OCC.

NFPA: 1 OCC.

LCRISS ROOM

798 SF

IBC: 8 OCC.

NFPA: 6 OCC.

PLAN LIBRARY

304 SF

IBC: 4 OCC.

NFPA: 3 OCC.

NSG ROOM

304 SF

IBC: 4 OCC.

NFPA: 3 OCC.

ISSO OFFICE

123 SF

IBC: 2 OCC.

NFPA: 1 OCC.

DET CHIEF

OFFICE

123 SF

IBC: 2 OCC.

NFPA: 1 OCC.

XP OFFICE

138 SF

IBC: 2 OCC.

NFPA: 1 OCC.

HOT DESK

OFFICE

313 SF

IBC: 4 OCC.

NFPA: 3 OCC.

TEAM ROOM #1

327 SF

IBC: 4 OCC.

NFPA: 3 OCC.

PRINTER /

STORAGE

ROOM

409 SF

IBC: 5 OCC.

NFPA: 3 OCC.

TSLV DEPT

3349 SF

IBC: 34 OCC.

NFPA: 23 OCC.

ENGINEERING

ROOM

866 SF

IBC: 9 OCC.

NFPA: 6 OCC.

AEROSPACE

ROOM

659 SF

IBC: 7 OCC.

NFPA: 5 OCC.

SECURITY

ROOM

597 SF

IBC: 6 OCC.

NFPA: 4 OCC.

DE OFFICE

129 SF

IBC: 2 OCC.

NFPA: 1 OCC.

CAGE OFFICE

120 SF

IBC: 2 OCC.

NFPA: 1 OCC.

CFI OFFICE

121 SF

IBC: 2 OCC.

NFPA: 1 OCC.

AEROSPACE

OFFICE

121 SF

IBC: 2 OCC.

NFPA: 1 OCC.

FM OFFICE

122 SF

IBC: 2 OCC.

NFPA: 1 OCC.

CORRIDOR

180 SF

IBC: 2 OCC.

NFPA: 2 OCC.

CORRIDOR

699 SF

IBC: 7 OCC.

NFPA: 5 OCC.

CORRIDOR

352 SF

IBC: 4 OCC.

NFPA: 3 OCC.

CORRIDOR

221 SF

IBC: 3 OCC.

NFPA: 2 OCC.

CORRIDOR

639 SF

IBC: 7 OCC.

NFPA: 5 OCC.

CORRIDOR

129 SF

IBC: 2 OCC.

NFPA: 1 OCC.

SCO FLIGHT

CHIEF OFFICE

127 SF

IBC: 2 OCC.

NFPA: 1 OCC.

MEETING ROOM

#3

160 SF

IBC: 2 OCC.

NFPA: 2 OCC.

DOCUMENT

CONTROL

323 SF

IBC: 4 OCC.

NFPA: 3 OCC.

SECURITY LEAD

132 SF

IBC: 2 OCC.

NFPA: 1 OCC.

SECURITY

SUPPORT

264 SF

IBC: 3 OCC.

NFPA: 2 OCC.

COM SEC ROOM

148 SF

IBC: 2 OCC.

NFPA: 2 OCC.

ELEC CLO

10 SF

IBC: 1 OCC.

NFPA: 1 OCC.

PSO OFFICE

164 SF

IBC: 2 OCC.

NFPA: 2 OCC.

TEAM ROOM #2

327 SF

IBC: 4 OCC.

NFPA: 3 OCC.

XP ROOM

866 SF

IBC: 9 OCC.

NFPA: 6 OCC.

SANITIZATION

ROOM

365 SF

IBC: 4 OCC.

NFPA: 3 OCC.

ELECTRICAL

ROOM

212 SF

IBC: 1 OCC.

NFPA: 1 OCC.

ELECTRICAL

ROOM

215 SF

IBC: 1 OCC.

NFPA: 1 OCC.

COMM ROOM

98 SF

IBC: 2 OCC.

NFPA: 1 OCC.

ELEC CLO

7 SF

IBC: 1 OCC.

NFPA: 1 OCC.

MECHANICAL

ROOM

148 SF

IBC: 1 OCC.

NFPA: 1 OCC.

CORRIDOR

185 SF

IBC: 2 OCC.

NFPA: 2 OCC.

STORAGE

231 SF

IBC: 3 OCC.

NFPA: 2 OCC.

PATH A, TOTAL

EGRESS PATH

PATH A,

COMMON PATH

OF TRAVEL

PATH C, TOTAL

EGRESS PATH

PATH C,

COMMON PATH

OF TRAVEL

PATH B, TOTAL

EGRESS PATH PATH B,

COMMON PATH

OF TRAVEL

FE

FE

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 2.4"

EXIT NO: 37.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.2"

EXIT NO: 36.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.4"

EXIT NO: 35.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

46.0" 3.2"

EXIT NO: 33.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 5.2"

EXIT NO: 38.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.6"

EXIT NO: 15A.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 3.0"

EXIT NO: 30.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.2"

EXIT NO: 12A.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 6.6"

EXIT NO: 11.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.4"

EXIT NO: 10.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.4"

EXIT NO: 09.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 0.2"

EXIT NO: 08.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

46.0" 1.2"

EXIT NO: 04.1

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 9.2"

EXIT NO: 01.1

DN

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

34.0" 33.9"

EXIT NO: B2510-139B

WIDTH REQ'D:

WIDTH PROV:

OCC LOAD:

70.0" 23.7"

EXIT NO: B2510-139A

DN

DN

D

EA

D

EN

D C

O R

R

ID

O R

0.

4'

DN

DN

DN

DN

DN

DN

DN

DN

DN

UP

N

PROJECT

NORTH

KEY PLAN

B2510

4 5321

D

C

B

A

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

FI

LE

N U

M

BE

R

IS

SU

E D

AT

E:

C H

EC

KE

D B

Y: FI

LE

N

AM

E:

SI

ZE

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

" X

4"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

G re en w od P la za

B lv d G re en w oo d Vi lla ge

, C O

Se na te

A ve nu e

C am p H ill, P

A

SU

BM

IT

TE

D B

Y:

US Army Corps of Engineers ®

AREA 'A'

W ild flo w er

C ou rt N ew H op e, P A

AREA 'B'

Lo ca l F ile

AT FULLSIZE: = 1 INCH

3/

/2

4:

:4

PM

BI

M

B2

Va nd en be rg /6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t

GI101

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

BU

IL

D

IN

G

IN

FO

R

M

AT

IO

N

C

O D

E

PL

AN

B2

R

EN

O

VA

TI

O N

J.

F

IC

KE

S

J.

F

IC

KE

S

C . B

EA

U

D U

Y

FE

BR

U

AR

Y

, 2

6_ Va nd en be rg

B

_A

_c en tra l_

R

_A

0.

rv t

ISSUED FOR CONSTRUCTION

LO

S

AN

G

EL

ES

D

IS

TR

IC

T

J.

D eG ou r

W

2P L-

-C

-0

W

2O L-

-R

-0

C en tra l F ile : B

IM

0:

\6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t Pr oj ec t N um be r:

VA

N

D

EN

BE

R

G A

IR

F

O R

C E

BA

SE

EXIT ACCESS TRAVEL DISTANCES

EGRESS PATH TOTAL DISTANCE

PATH A, COMMON PATH OF TRAVEL 86'-9"

PATH A, TOTAL EGRESS PATH 110'-7"

PATH B, COMMON PATH OF TRAVEL 87'-6"

PATH B, TOTAL EGRESS PATH 173'-9"

PATH C, COMMON PATH OF TRAVEL 78'-3"

PATH C, TOTAL EGRESS PATH 180'-10"

CODE ANALYSIS LEGEND

SCALE: NTSGI101

CODE PLAN - ALL PHASES1

1.1 APPLICABLE CODES & STANDARDS

1.1.1 UFC 1-200-01 20 JUNE 2016, INCLUDING CHANGE 2, 01 NOVEMBER 2018

1.1.2 UFC 3-600-01, 08 AUGUST 2016, INCLUDING CHANGE 2, 25 MARCH 2018

1.1.3 INTERNATIONAL BUILDING CODE, 2015 (IBC)

1.1.4 ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY STANDARDS 2015

1.1.5 NFPA 101, LIFE SAFETY CODE, 2018

1.1.6 NFPA 80, FIRE DOORS AND FIRE WINDOWS, 2016

1.1.7 NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2016

1.1.8 NFPA 75, FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2017

1.1.9 NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS, 2018

1.2 OCCUPANCY CLASSIFICATIONS (NON-SEPARATED) - IBC CHAPTER 3

1.2.1 GROUP A-3 - ASSEMBLY

1.2.2 GROUP B - BUSINESS

1.2.3 GROUP S-2 - STORAGE

1.3 BUILDING HEIGHT & AREA LIMITATIONS - IBC CHAPTER 5

1.3.1 SECTION 508.4 SEPARATED OCCUPANCIES: THE ALLOWABLE BUILDING

AREA AND HEIGHT IS BASED ON EACH INDIVIDUAL OCCUPANCY.

1.3.2 TABLE 504.3 ALLOWABLE BUILDING HEIGHT (SPRINKLERED)

1.3.2.1 GROUPS A/B/S - ALLOWABLE HEIGHT = 75', ACTUAL = 18'-6"

1.3.3 TABLE 504.4 ALLOWABLE NUMBER OF STORIES (SPRINKLERED)

1.3.3.1 GROUP A-3 - ALLOWABLE STORIES ABOVE GRADE = 3, ACTUAL = 1

1.3.3.2 GROUP B - ALLOWABLE STORIES ABOVE GRADE = 4

1.3.3.3 GROUP S-2 - ALLOWABLE STORIES ABOVE GRADE = 4

1.3.4 SECTION 507.4, SPRINKLERED ONE-STORY BUILDINGS

1.3.5 ACTUAL AREA:

1.3.5.1 B2500 = 23,990 SF

1.3.5.2 B2510 = 19,907 SF

1.3.5.3 TOTAL AREA = 43,897 SF

1.4 MINIMUM CONSTRUCTION TYPE - IBC CHAPTER 6

1.4.1 TYPE II-B

1.5 SEPARATION OF BUILDINGS

1.5.1 TABLE 601 = TYPE IIB

BETWEEN BUILDINGS 2500 & 2510; 30'-0" PROVIDED

1.6 PEDESTRIAN WALKWAYS - IBC CHAPTER 31

1.6.1 PEDESTRIAN WALKWAYS SHALL NOT CONTRIBUTE TO THE BUILDING AREA PER

3104.1

1.6.2 EXTERIOR WALLS OF CONNECTED BUILDINGS MEET THE 2 HOUR RATING

REQUIREMENT PER 3104.5.4 SO THAT WALLS AT THE INTERSECTION OF THE

PEDESTRIAN WALKWAY NEED NOT BE RATED.

1.7 MEANS OF EGRESS - NFPA 101, CHAPTER 7

1.7.1 EGRESS CAPACITY - TABLE 7.3.3.1 = 0.2" PER OCCUPANT. SEE GI101 FOR DISTRIBUTION.

1.7.2 MINIMUM NUMBER OF EXITS - 38.2.4.1 & 7.4 = 3 REQUIRED, 15 PROVIDED

1.7.3 MINIMUM WIDTH OF DOORS - 7.2.1.2.3.2 = 32" MINIMUM, 34" PROVIDED

1.7.4 COMMON PATH OF TRAVEL - 38.2.5.3.1 = 100' MAX.

1.7.5 DISTANCE TO EXITS - 38.2.6.3 = 300' MAX

1.7.6 DEAD END CORRIDORS - 38.2.5.2.1 = 50' MAX

1.7.7 MINIMUM WIDTH OF CORRIDOR - 38.2.3.2 = 44", ACTUAL = 60" MIN

KEY PLAN

B2510

4 5321

D

C

B

A

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

F

IL

E N

U M

B E

R

IS

S

U E

D A

T E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

X

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

G re e n w o d P la z a B lv d

G re e n w o o d V ill a g e

C O

S e n a te

A ve n u e

C a m p H ill P

A

S U

B M

IT

T

E D

B Y

US Army Corps of Engineers ®

AREA 'A'

W ild fl o w e r

C o u rt

N e w

H o p e P

A

AREA 'B'

L o c a l F ile

AT FULLSIZE: = 1 INCH

/1

/2

:1

:3

P M

B

IM

/0

B

V a n d e n b e rg /6

V a n d e n b e rg

B

A c e n tr a l_ R

A

.r v t

GI102

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

D E

A N

A L Y

S

IS

A N

D O

C C

U P

A N

T L

O A

D S

B R

E N

O V

A T

IO

N

J

F

IC

K E

S

J

F

IC

K E

S

C

B E

A U

D U

Y

F E

B R

U A

R Y

V a n d e n b e rg

B A c e n tr a l_

R A

.r vt

ISSUED FOR CONSTRUCTION

L O

S A

N G

E L E

S D

IS

T

R

IC

T

J

D e G o u r

W P

L -1

-C

-0

W O

L -1

-R

-0

C e n tr a l F ile B

IM

V a n d e n b e rg

B A c e n tr a l_

R A

.r v t

P ro je c t N u m b e r:

V A

N D

E N

B E

R G

A

IR

F O

R C

E B

A S

E

CODE DATAOCCUPANT LOADING

# ROOM NAME AREA

IBC NFPA

S F

O

C C

O

C C

S F

O

C C

O

C C

01 CORRIDOR 128.75 SF 100 2 150 1

02 SECURITY SUPPORT 264.23 SF 100 3 150 2

03 SECURITY LEAD 131.92 SF 100 2 150 1

04 SECURITY ROOM 597.42 SF 100 6 150 4

05 AEROSPACE ROOM 659.27 SF 100 7 150 5

06 MEETING ROOM #3 160.07 SF 100 2 150 2

07 ENGINEERING ROOM 866.21 SF 100 9 150 6

08 ELECTRICAL ROOM 293.11 SF 300 1 300 1

09 MECHANICAL ROOM 517.86 SF 300 2 300 2

10 UTILITY ROOM 327.15 SF 300 2 300 2

11 CORRIDOR 351.88 SF 100 4 150 3

12 COMM ROOM 97.54 SF 100 2 150 1

12A COMM ROOM 279.17 SF 300 1 300 1

13 CORRIDOR 179.78 SF 100 2 150 2

14 CORRIDOR 698.73 SF 100 7 150 5

15 LCRISS ROOM 797.85 SF 100 8 150 6

15A SHREDDER ROOM 264.58 SF 300 1 300 1

16 DE OFFICE 129.47 SF 100 2 150 1

17 CAGE OFFICE 120.00 SF 100 2 150 1

18 CFI OFFICE 120.83 SF 100 2 150 1

19 AEROSPACE OFFICE 120.83 SF 100 2 150 1

20 FM OFFICE 122.29 SF 100 2 150 1

21 CONFERENCE ROOM 719.63 SF 100 8 150 5

22 BREAK ROOM 560.99 SF 100 6 150 4

23 STORAGE 230.61 SF 100 3 150 2

24 ESH ROOM 582.99 SF 100 6 150 4

25 ESH OFFICE #1 131.76 SF 100 2 150 1

26 ESH OFFICE #2 123.45 SF 100 2 150 1

27 PLAN LIBRARY 304.43 SF 100 4 150 3

28 PSO OFFICE 163.88 SF 100 2 150 2

29 DOCUMENT CONTROL 322.90 SF 100 4 150 3

30 PSO ROOM 934.20 SF 100 10 150 7

31 TEAM ROOM #1 327.20 SF 100 4 150 3

32 TEAM ROOM #2 327.04 SF 100 4 150 3

33 SANITIZATION ROOM 364.69 SF 100 4 150 3

34 MECHANICAL ROOM 147.58 SF 300 1 300 1

35 ELECTRICAL ROOM 212.09 SF 300 1 300 1

36 ELECTRICAL ROOM 215.45 SF 300 1 300 1

37 CER ROOM 3,561.56 SF 100 36 150 24

38 CORRIDOR 184.81 SF 100 2 150 2

39 CORRIDOR 221.27 SF 100 3 150 2

40 HOT DESK OFFICE 312.98 SF 100 4 150 3

41 XP ROOM 865.72 SF 100 9 150 6

42 XP OFFICE 138.22 SF 100 2 150 1

43 CORRIDOR 639.33 SF 100 7 150 5

44 TSLV DEPT 3,349.22 SF 100 34 150 23

45 BUILD ROOM 554.15 SF 100 6 150 4

46 COM SEC ROOM 148.00 SF 100 2 150 2

47 SCO FLIGHT CHIEF OFFICE 126.69 SF 100 2 150 1

48 DET CHIEF OFFICE 123.25 SF 100 2 150 1

49 ISSO OFFICE 123.25 SF 100 2 150 1

50 NSG ROOM 304.01 SF 100 4 150 3

51 PRINTER / STORAGE ROOM 409.31 SF 100 5 150 3

52 JAN CLO 44.82 SF 100 1 150 1

53 WOMEN'S ROOM 253.79 SF 100 3 150 2

54 MEN'S ROOM 333.83 SF 100 4 150 3

55 ELEC CLO 10.20 SF 100 1 150 1

56 ELEC CLO 6.54 SF 100 1 150 1

Grand total 263 183

1.1 SEQUENCE OF CONSTRUCTION OVERVIEW

1.1.1 DUE TO THE NATURE OF THE FACILITY, SPECIFICALLY THE 24/7/365 OPERATIONS AND THE SECURITY REQUIREMENTS, IT IS NECESSARY TO PERFORM THE RENOVATION WORK IN PHASES. EACH PHASE DEVELOPED REPRESENTS A SET OF STEPS OR TASKS THAT CAN BE ACCOMPLISHED DURING A SPECIFIC TIME FRAME. SOME OF THE PHASES AND/OR TASKS DESCRIBED IN THE DESIGN ARE SEQUENTIAL WHILE OTHERS ARE NOT TIED TO A PARTICULAR ORDER AND ARE DISCREET TASKS. ANY WORK THAT TAKES PLACE ON SYSTEMS WHICH ARE REQUIRED FOR ONGOING OPERATIONS REQUIRE THE CONTRACTOR TO PROVIDE TEMPORARY SUPPORT (SUCH AS HVAC OR POWER). SYSTEMS WHICH ARE CURRENTLY “REDUNDANT” DUE TO THEIR CRITICAL NATURE SHALL HAVE THEIR LEVEL OF REDUNDANCY RETAINED UNTIL THE FINAL REDUNDANT SYSTEM IS TESTED AND RUNNING. THE DESIGN HAS BEEN DEVELOPED TO LIMIT WORK OUTSIDE OF THE PHASING BOUNDARY, HOWEVER THERE MAY BE TIMES WHEN WORK MUST OCCUR OUTSIDE OF THE BOUNDARY. AN EXAMPLE OF THIS WOULD BE WHEN A POWER WIRE RUNS FROM A PANEL OUTSIDE OF THE BOUNDARY BUT SERVES THE AREA WITHIN THE BOUNDARY. DURING THESE TIMES, THE CONTRACTOR SHALL COORDINATE WITH BOTH NROV ENGINEERING AND NROV SECURITY TO ENSURE ALL REQUIREMENTS, INCLUDING ESCORTS, ARE MET. REFER TO THE CONSTRUCTION SECURITY PLAN FOR DETAILS RELATIVE TO ESCORT AND SECURITY REQUIREMENTS. THE PHASES DESCRIBED BELOW GENERALLY EXPLAIN THE WORK TO BE ACCOMPLISHED DURING EACH PHASE OF THE PROJECT. REFER TO THE DRAWINGS AND SPECIFICATIONS FOR FULL DETAILS OF THE RENOVATIONS IN EACH PHASE AND REFER TO THE SCOPE OF WORK FOR SPECIFIC REQUIREMENTS REGARDING PERMITTED WORKING TIME FRAMES, COORDINATION REQUIREMENTS, AND NO WORK DAYS, ETC.

1.1.2 THIS SEQUENCE OF CONSTRUCTION REPRESENTS A PLAN THAT KEEPS CRITICAL INFRASTRUCTURE AND OPERATIONAL EQUIPMENT UP AND RUNNING FOR 24/7/365 OPERATIONS, HOWEVER THE CONTRACTOR IS

RESPONSIBLE FOR DEVELOPING THE FINAL SEQUENCE BASED ON THESE REQUIREMENTS.

1.1.3 THIS RENOVATION PROJECT SHALL BE EXECUTED IN TWO BASIC PHASES. THE FIRST PHASE CONSISTS OF EXPANDING AND UPGRADING THE CER TO MEET NFPA 75 (INCLUDING UPGRADING THE CER (ROOM 37) PERIMETER WALLS TO BE ONE HOUR RATED), REPLACING THE HVAC AND ELECTRICAL DISTRIBUTION SYSTEMS, AS WELL AS UPGRADING THE INTERIOR FINISHES. ADDITIONALLY, DURING THIS PHASE THE CER SHALL BE MODIFIED TO BE A TEMPORARY SECURE FACILITY WHICH INCLUDES MODIFYING ONE EXTERIOR DOOR WITH A CDX-10 COMBINATION DEADBOLT AND INSTALLING A CARD READER ON BOTH SIDES OF THIS TEMPORARY PRIMARY ENTRY DOOR, REMOVING AND/OR SECURING DESIGNATED INTERNAL DOORS, SECURING DESIGNATED PERIMETER DOORS, AND VERIFYING ALL PERIMETER WALL PENETRATIONS MEET ICD/ICS 705, VERSION 1.4 DATED SEPTEMBER 28, 2017, AND UFC 4-010-05 WITH CHANGE 1, DATED OCTOBER 1, 2013 CRITERIA. THE FIRST MILESTONE OF PHASE 1 SHALL BE TO MAKE THE NECESSARY UPGRADES TO THE CER TO OBTAIN TEMPORARY SECURE FACILITY STATUS. NOTE THAT NO DEMOLITION OF EXISTING DOORS OR DISTURBANCE TO THE EXISTING SECURITY SYSTEM MAY OCCUR UNTIL THE TEMPORARY SECURED FACILITY IS CERTIFIED. AFTER TEMPORARY SECURE FACILITY STATUS IS OBTAINED WORK SHALL CONTINUE WITH PHASE 1 UNTIL COMPLETION. PHASE 2 INCLUDES THE COMPLETE RENOVATION OF THE REMAINDER OF THE BUILDING AND CAN COMMENCE ONLY AFTER THE CER HAS ATTAINED TEMPORARY SECURE STATUS AND THE GOVERNMENT HAS DECERTIFIED B2500 SECURE FACILITY STATUS, THEREBY ALLOWING WORK TO COMMENCE OUTSIDE OF THE TEMPORARY SECURE BOUNDARY UNESCORTED. AT THE COMPLETION OF PHASE 2 THE PERMANENT CER PERIMETER DOORS SHALL BE REPLACED INCLUDING THE TEMPORARY PRIMARY ENTRY DOOR WITH THE CDX-10 LOCK WILL BE REPLACED WITH A NEW STC-50 RATED DOOR (WITHOUT A CDX-10 LOCK).

THE TEMPORARY SECURE FACILITY WILL THEN BE DECERTIFIED AND THE ENTIRE BUILDING (2500 & 2510) WILL BE

RECERTIFIED AS A SECURE FACILITY.

1.1.4 WHEN THE CONTRACTOR NEEDS TO BE IN THE TEMPORARY SECURED CER OR OTHER SECURE AREAS IN THE BUILDING OR COMPLEX DURING PHASE 1 AND PHASE 2, THE GOVERNMENT WILL PROVIDE TS SCI CLEARED SECURITY ESCORTS. THESE ESCORTS WILL BE COORDINATED WITH THE GOVERNMENT IN ADVANCE BY THE CONTRACTOR AND THE CONTRACTOR SHALL INCLUDE THESE EVENTS IN THEIR WEEKLY PLANNING MEETINGS AND

THREE WEEK LOOK AHEAD SCHEDULES.

1.1.5 ANY WORK WHICH REQUIRES A TEMPORARY DISRUPTION TO EXISTING SERVICES (POWER, HVAC, OR COMMUNICATIONS) TO THE CER MUST BE COORDINATED WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE. REFER TO 1.1.7 AND 1.2 BELOW FOR ADDITIONAL INFORMATION, INCLUDING LIMITS ON ALLOWABLE

DISRUPTIONS TO EXISTING SYSTEMS.

1.1.6 REFER TO THE FIRE ALARM DRAWINGS AND SECTION 28 31 76 FOR THE REQUIRED TEMPORARY FIRE DETECTION

SYSTEM TO BE UTILIZED DURING CONSTRUCTION.

1.1.7 IN ADDITION TO THE CER TECHNICAL POWER AND COOLING SYSTEMS, THE FOLLOWING ITEMS MUST REMAIN IN SERVICE THROUGHOUT CONSTRUCTION. PROVIDE TEMPORARY POWER TO THESE ITEMS AS REQUIRED TO MAINTAIN OPERATION. COORDINATE ANY DISRUPTION TO THESE ITEMS WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE. ALSO NOTE THE ALLOWABLE DISRUPTION DURATIONS NOTED FOR EACH ITEM. ALL DISRUPTIONS MUST BE KEPT TO AN ABSOLUTE MINIMUM; THE CONTRACTOR BEARS FULL RESPONSIBILITY FOR DEMONSTRATING THAT EACH REQUESTED DISRUPTION IS NECESSARY. DISRUPTIONS TO ANY INDIVIDUAL SYSTEM SHALL NOT OCCUR MORE THAN ONCE PER DAY. UNLESS OTHERWISE NOTED, THE TOTAL NUMBER OF DISRUPTIONS

TO ANY INDIVIDUAL SYSTEM SHALL NOT EXCEED 4, OVER THE DURATION OF THE PROJECT.

• SITE LIGHTING (PARKING LOTS, ROADWAYS, ETC.) - NO DISRUPTIONS OVERNIGHT

• FENCE LIGHTING - NO DISRUPTIONS OVERNIGHT

• FIRE ALARM CONTROL PANELS - MAXIMUM 2 HOURS PER OCCURRENCE

• SECURITY SYSTEM CONTROL PANELS - MAXIMUM 1 HOUR PER OCCURRENCE, NO MORE THAN 2

DISRUPTIONS TOTAL

• SITE CCTV POLES - MAXIMUM 2 HOURS PER OCCURRENCE

• FMS NETWORK EQUIPMENT - MAXIMUM 8 HOURS PER OCCURRENCE

• HVAC CONTROLLERS SERVING THE CER - MAXIMUM 8 HOURS PER OCCURRENCE

• EPO SYSTEMS - MAXIMUM 2 HOURS PER OCCURRENCE

• POWER AND LIGHTING SERVING COMM ROOM 12A - MAXIMUM 2 HOURS PER OCCURRENCE

• POWER TO THE TRAILERS - MAXIMUM 1 HOUR PER OCCURRENCE, NO MORE THAN 4 DISRUPTIONS TOTAL

INCLUDING THOSE DESCRIBED IN 1.2.2 BELOW

• POWER, LIGHTING, AND HVAC SERVING ROOM 12, UNTIL THE CER AND TEMPORARY SECURED FACILITY HAS

BEEN ACCREDITED AND EXISTING SECURITY EQUIPMENT HAS BEEN REMOVED FROM ROOM 12.

1.1.8 COMPLY WITH THE FOLLOWING FOR THE DURATION OF ANY OUTAGES TO EXISTING SWITCHBOARD DEQ1, EXISTING

SWITCHBOARD MSB2, AND/OR EXISTING PANEL OPS/ME.

• COORDINATE WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE.

• PROVIDE TEMPORARY GENERATOR(S) FOR POWER TO EXISTING SWITCHBOARD MSB2 (SERVING CH1A AND

CRFC-1) AND PANELBOARD OPS/ME (SERVING DFC1 ADN CRFC-3) AS REQUIRED TO KEEP THE EXISTING COOLING SYSTEMS SERVING THE CER OPERATIONAL. CONNECT TEMPORARY POWER FIRST TO PANEL OPS/ME, AND SECONDLY TO MSB2, SUCH THAT ONLY ONE "CRFC SYSTEM" IS OUT OF SERVICE AT ANY GIVEN TIME. PROCEED IN REVERSE ORDER FOR TRANSITIONING FROM TEMPORARY POWER BACK TO NORMAL POWER. DURATION OF OUTAGES TO MSB2 OR OPS/ME FOR THE PURPOSES OF TRANSITIONING BETWEEN

NORMAL AND TEMPORARY POWER SHALL NOT EXCEED 30 MINUTES.

• PROVIDE BACKUP COOLING FOR THE DURATION OF ANY OUTAGE TO DEQ1, MSB2, OR OPS/ME. THIS

INCLUDES ANY TIMES THAT TEMPORARY POWER IS BEING USED TO POWER CER COOLING.

• SWITCH EXISTING B2510 SWITCHBOARD TL-DP TO BE SERVED SOLELY FROM DEQ2.

• AN OUTAGE TO DEQ1 WILL RESULT IN AN OUTAGE TO UPS-R.

• OUTAGES TO DEQ1, MSB2, OR OPS/ME SHALL NOT EXCEED 4 HOURS PER OCCURRENCE.

1.1.9 COMPLY WITH THE FOLLOWING FOR THE DURATION OF ANY OUTAGES TO EXISTING SWITCHBOARD DEQ2.

• COORDINATE WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE.

• PROVIDE TEMPORARY GENERATOR(S) FOR POWER TO EXISTING SWITCHBOARD MSB3 AS REQUIRED TO

KEEP THE TRAILERS AND EXISTING B2500 ROOFTOP A/C UNIT OPERATIONAL. DURATION OF OUTAGES TO MSB3 FOR THE PURPOSES OF TRANSITIONING BETWEEN NORMAL AND TEMPORARY POWER SHALL NOT

EXCEED 30 MINUTES.

• SWITCH EXISTING B2510 SWITCHBOARD TL-DP TO BE SERVED SOLELY FROM DEQ1.

• AN OUTAGE TO DEQ2 WILL RESULT IN AN OUTAGE TO UPS-B.

• OUTAGES TO DEQ2 SHALL NOT EXCEED 4 HOURS PER OCCURRENCE.

1.1.10 PROVIDE BACKUP COOLING FOR THE CER FOR THE DURATION OF ANY WORK WHICH JEOPARDIZES RELIABLE COOLING TO THE CER. THIS INCLUDES ANY TIME THAT TEMPORARY POWER IS BEING USED TO SUPPORT CER COOLING, AND DURING SWITCHOVERS IMPACTING CER COOLING. THE BACKUP COOLING SYSTEM SHALL BE SETUP AND TESTED, READY FOR IMMEDIATE USE DEPLOYMENT, PRIOR TO BEGINNING THE WORK. ACTIVATION OF THE

BACKUP COOLING SYSTEM WILL BE AT THE DISCRETION OF THE GOVERNMENT.

THE BACKUP COOLING SYSTEM SHALL CONSIST OF A SKID-MOUNTED 40-TON PACKAGED AIR CONDITIONING UNIT.

THE UNIT SHALL BE POWERED BY A MATCHED STAND-ALONE GENERATOR. IF NEEDED FOR BACKUP COOLING, THE CONTRACTOR SHALL PROVIDE INSULATED FLEXIBLE DUCTWORK FROM THE UNIT INTO THE CER. THE DUCTWORK SHALL BE SECURED AND DISCHARGE SUCH THAT SUPPLY AIR WILL BE NEAR THE FLOOR AND RETURN AIR SHALL BE AS HIGH AS POSSIBLE. TEMPORARY SUPPLY AND RETURN DUCTWORK SHALL BE CONFIGURED TO ALLOW DAILY INSTALLATION AND REMOVAL AT THE SECURE BOUNDARY TO ENSURE OFF-HOUR CONTINUITY OF THE SECURE BOUNDARY ENVELOPE. THE CONTRACTOR SHALL ALSO PROVIDE A MINIMUM OF FIVE (5) CORD/PLUG BOX FANS TO BE PLACED WITHIN THE CER TO FACILITATE AIR MOVEMENT WITHIN THE ROOM. COORDINATE UNIT AND

GENERATOR PLACEMENT WITH BOTH EXISTING AND NEW EQUIPMENT.

1.1.11 ALL DISRUPTIONS TO EXISTING SYSTEMS SHALL OCCUR DURING NORMAL BUSINESS HOURS.

1.2 PHASE 1 (CER) SEQUENCE OF CONSTRUCTION

1.2.1 MAINTAINING 24/7/365 OPERATION OF THE CER IS A CRITICAL PROJECT REQUIREMENT WHICH CANNOT BE COMPROMISED. THEREFORE, THE WORK ASSOCIATED WITH THE CER AND ITS SUPPORTING SYSTEMS MUST PROGRESS AND SHALL BE SEQUENCED SUCH THAT MISSION OPERATIONS ARE NOT DISRUPTED. THE METHODS THAT ARE TO BE USED TO ACCOMPLISH THESE OBJECTIVES ARE (1) CONSTRUCTING NEW SYSTEMS IN PARALLEL WITH EXISTING SYSTEMS, AND (2) TAKING A “ONE STEP AT A TIME” APPROACH.

1.2.2 AS A GENERAL OUTLINE, THE WORK SHALL BE SEQUENCED AS FOLLOWS:

Step 1 TEMPORARY SECURE PERIMETER CONSTRUCTION

· DISABLE THE EXISTING VESDA SYSTEMS IN THE CER.

· INSTALL PROTECTION OVER EXISTING CER RACKS. DO NOT USE THE RACKS TO

SUPPORT WORKING PLATFORMS AND ENSURE THAT ACCESS TO THE RACKS CAN BE

MADE EASILY IN THE EVENT THAT THE GOVERNMENT NEEDS TO WORK ON THEM.

ADDITIONALLY, CARE SHALL BE TAKEN TO ENSURE THAT PROPER AIRFLOW TO THE

UNITS ARE MAINTAINED. PROVIDE FANS AND VINYL CURTAINS AS NECESSARY FOR

PROPER AIRFLOW.

· IMPROVE THE ONE-HOUR FIREWALL AROUND THE CER (INCLUDING AROUND ROOMS

33 AND 34); THIS INCLUDES REMOVING EXISTING INTERIOR DOORS X45, X70, X71, X72

AND X77 AND CLOSING OFF THESE OPENINGS. DEMOLISH MECHANICAL, ELECTRICAL,

AND OTHER SYSTEMS’ PENETRATIONS AT THE 1-HOUR FIREWALL AS REQUIRED. ALL

EXISTING PENETRATIONS TO REMAIN MUST BE SEALED. INSTALL ALL FUTURE

PENETRATIONS AND CAP WHILE MAINTAINING THE FIRE RATING. FRAME IN THE WALL

OPENINGS FOR PHASE 2 DUCTWORK AND DOOR (37.2), THEN COVER IT OVER TO

ACHIEVE THE REQUIRED FIRE RATING. REMOVE DRYWALL WHEN NEW DUCTWORK

AND DOOR ARE INSTALLED IN PHASE 2.

· REMOVE THE VESDA PANELS.

· DEMOLISH WALLS AROUND ROOM 37A, INCLUDING DOOR X77A.

· OPEN WALL BETWEEN ROOMS 33 AND 37 AS REQUIRED FOR FUTURE DOOR 33.2.

· INSTALL RETROFIT FIRE STOPS AROUND EXISTING CABLE TRAYS THAT PENETRATE

THE 1-HOUR WALLS, AND INSTALL FIRE RATED PATHWAYS FOR NEW CABLE TRAYS

AT THEIR REQUIRED LOCATIONS IN THE 1-HOUR WALLS. FILL BOTH RETROFIT FIRE

STOPS AND FIRE RATED PATHWAYS WITH 1-HOUR RATED FIRESTOP PILLOWS OR

SIMILAR APPROVED MATERIAL.

· GOVERNMENT TO OBTAIN TEMPORARY SECURE APPROVAL FOR CER.

Step 2 DEMO EXISTING MECHANICAL EQUIPMENT AND CONSTRUCT NEW RATED WALL AND DOOR

34.1 IN EXISTING ROOM 35 TO CREATE NEW ELECTRICAL ROOM THEN BEGIN ELECTRICAL

AND MECHANICAL EQUIPMENT INSTALLATIONS.

· INSTALL NEW SWITCHBOARD MSB2 READY FOR CONNECTION TO EXISTING

SWITCHBOARD DEQ1 LATER IN STEP 2.

· INSTALL NEW PDU’S AND CONNECT TO EXISTING UPS’S. COORDINATE THE

FOLLOWING STEPS WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE.

SHUTDOWNS OF EACH UPS SYSTEM SHALL NOT EXCEED 12 HOURS EACH, AND ALL

EQUIPMENT AND CIRCUITS MUST BE RETURNED TO THEIR NORMAL STATE AT THE

END OF THE WORK DAY (I.E. SHUTDOWN CANNOT EXTEND OVERNIGHT).

DEQ1, UPS-R, AND PDU-R (REFER TO 1.1.8 AND 1.1.10)

1. TRANSITION EXISTING SWITCHBOARD MSB2 AND PANEL OPS/ME TO TEMPORARY

POWER. DISCONNECT AND "PULL BACK" EXISTING FEEDERS FROM MSB2 TO UPS-

R AND IBS-R DURING THE TIME THAT MSB2 IS SHUTDOWN FOR TRANSITIONING

TO TEMPORARY POWER.

2. DE-ENERGIZE EXISTING SWITCHBOARD DEQ1, UPS-R, AND IBS-R.

3. INSTALL NEW FEEDERS TO UPS-R AND IBS-R FROM DEQ1 AND COMPLETE

REMOVAL OF EXISTING FEEDERS FROM MSB2. INSTALL NEW TIE BREAKER IN IBS-

R, AND CONNECT NEW PDU-R TO IBS-R.

4. INSTALL NEW BREAKER FOR NEW SWITCHBOARD MSB2 IN DEQ1 AND CONNECT

NEW SWITCHBOARD MSB2 TO DEQ1.

5. RE-ENERGIZE DEQ1, UPS-R, AND IBS-R.

6. TRANSITION MSB2 AND OPS/ME BACK TO NORMAL POWER

DEQ2, UPS-B, AND PDU-B (REFER TO 1.1.9)

1. TRANSITION EXISTING SWITCHBOARD MSB3 TO TEMPORARY POWER.

DISCONNECT AND "PULL BACK" EXISTING FEEDERS FROM MSB3 TO UPS-B AND

IBS-B DURING THE TIME THAT MSB3 IS SHUTDOWN FOR TRANSITIONING TO

TEMPORARY POWER.

2. DE-ENERGIZE EXISTING SWITCHBOARD DEQ2, UPS-B, AND IBS-B.

3. INSTALL NEW FEEDERS TO UPS-B AND IBS-B FROM DEQ2 AND COMPLETE

REMOVAL OF EXISTING FEEDERS FROM MSB3. CONNECT NEW PDU-B TO IBS-B.

4. INSTALL NEW BREAKER FOR NEW SWITCHBOARD MSB1 IN DEQ2, READY FOR

CONNECTION TO NEW MSB1 IN STEP 3.

5. RE-ENERGIZE DEQ2, UPS-B, AND IBS-B.

6. TRANSITION MSB3 BACK TO NORMAL POWER.

· INSTALL NEW TECHNICAL POWER PANELBOARDS TP3R, TP3B, TP4 (INCLUDING

ASSOCIATED MANUAL TRANSFER SWITCH), AND TP5. CONNECT TO NEW PDU’S.

· INSTALL NEW CHILLER AND CHILLED WATER PUMPS AND CONNECT TO NEW MSB2.

· EXTEND NEW FIRE SERVICE MAIN AND INSTALL NEW RISER ASSEMBLY.

Step 3 DEMOLISH EXISTING MECHANICAL EQUIPMENT IN EXISTING ROOM 09 THEN BEGIN

ELECTRICAL AND MECHANICAL EQUIPMENT INSTALLATIONS.

· RE-POWER RACKS IN ROOM 12A FROM NEW TECHNICAL POWER PANELBOARD TP5

BEFORE ROOM 8 IS TAKEN OFFLINE.

· DISCONNECT EXISTING SWITCHBOARD MSB1 FROM SWITCHBOARD DEQ1 AND

REMOVE MSB1, INSTALL NEW SWITCHBOARD MSB1, AND CONNECT TO DEQ2. REFER

TO 1.1.8 AND 1.1.9.

· REMOVE EXISTING CHILLER AND INSTALL NEW CHILLER AND CHILLED WATER PUMPS

AND CONNECT TO MSB1.

· INTERCONNECT ROOM 09 AND ROOM 34 CHILLED WATER PIPING.

· EXTEND NEW FIRE PROTECTION PIPING TO THE EXTERIOR HOSE VALVE.

Step 4 REMOVE THE EXISTING CEILING THROUGHOUT THE CER ROOM 37 AND LMC ROOM 38A.

PROVIDE TEMPORARY SUPPORT FOR LIGHTING FIXTURES, HVAC DIFFUSERS, ETC. AS

REQUIRED BEFORE TEMPORARY FIXTURES ARE INSTALLED.

Step 5 INSTALL TEMPORARY LIGHTING INCLUDING NECESSARY SUPPORTS. TEMPORARY LIGHTING SHALL PROVIDE 20 FOOT-CANDLES (+/-10%) ILLUMINATION AT 30 INCHES ABOVE THE FLOOR.

Step 6 REMOVE EXISTING LIGHTING FIXTURES.

Step 7 INSTALL NEW WET-PIPE SPRINKLERS WITHIN THE CER AND THE TEMPORARY WATER

CURTAIN OUTSIDE THE CER PERIMETER. TEST AND COMMISSION BOTH SYSTEMS IN

ACCORDANCE WITH THE APPROVED COMMISSIONING PLAN. AFTER SUCCESSFUL

COMMISSIONING OF BOTH SYSTEMS, THE EXISTING PRE-ACTION SYSTEM WITHIN THE CER

CAN BE DEMOLISHED.

1.2 PHASE 1 (CER) SEQUENCE OF CONSTRUCTION (CONTINUED)

Step 8 INSTALL NEW TECHNICAL POWER DISTRIBUTION SYSTEM.

· INSTALL NEW TECHNICAL POWER DISTRIBUTION PANELS TP1R, TP1B, TP2R, AND TP2B IN THE CER

AND CONNECT TO THE NEW PDU’S.

· INSTALL NEW OVERHEAD BUSWAY IN THE EXISTING CER SPACE AND CONNECT TO THE NEW

TECHNICAL POWER DISTRIBUTION PANELS.

· INSTALL AND COMMISSION THE NEW EMERGENCY POWER OFF (EPO SYSTEM).

· ENERGIZE AND COMMISSION NEW TECHNICAL POWER DISTRIBUTION SYSTEM IN ACCORDANCE

WITH THE APPROVED COMMISSIONING PLAN. PROVIDE THE GOVERNMENT WITH 14 DAYS’ NOTICE

OF EXPECTED COMPLETION OF THIS STEP.

Step 9 THE GOVERNMENT TEAM WILL TRANSITION THE EXISTING RACKS FROM THE UNDER-FLOOR RECEPTACLES TO THE NEW OVERHEAD BUSWAY. DURING THIS OPERATION THE CONTRACTOR WILL NOT BE PERMITTED TO WORK. THE GOVERNMENT TEAM WILL REQUIRE UP TO FIVE WEEKS TO PERFORM THIS

WORK. AT THE COMPLETION OF THIS STEP, ALL CER RACKS WILL BE SUPPORTED BY THE NEW

OVERHEAD BUSWAY AND PDU’S, AND THE EXISTING PDU’S AND UNDERFLOOR DISTRIBUTION SYSTEM WILL

BE UNLOADED.

Step 10 DEMOLISH EXISTING UNDERFLOOR RECEPTACLES AND CONDUITS, EXISTING TECHNICAL POWER PANELS, AND EXISTING PDU’S. COORDINATE EACH OF THE FOLLOWING STEPS WITH THE GOVERNMENT NOT LESS THAN 14 DAYS IN ADVANCE. SHUTDOWNS OF EACH UPS SYSTEM SHALL NOT EXCEED 4 HOURS EACH, AND ALL CIRCUITS MUST BE RETURNED TO THEIR NORMAL STATE AT THE END OF THE WORK DAY (I.E.

SHUTDOWN CANNOT EXTEND OVERNIGHT).

1. DE-ENERGIZE EXISTING UPS-R AND IBS-R AND DEMOLISH EXISTING FEEDERS SERVING EXISTING PDU.

2. RE-ENERGIZE UPS-R AND IBS-R.

3. DE-ENERGIZE EXISTING UPS-B AND IBS-B AND DEMOLISH EXISTING FEEDERS SERVING EXISTING PDU.

4. RE-ENERGIZE UPS-B AND IBS-B.

Step 11 DEMOLISH EXISTING WALLS SEPARATING LMC ROOM 38A AND CER ROOM 37 AND WALL SEPARATING ROOMS

33 AND 34. INSTALL NEW DOOR 33.2 AND DEMOLISH EXISTING DOOR X85.

Step 12 INSTALL 14 NEW RACKS (FIVE RED AND FIVE BLACK SERVER RACKS AND FOUR PATCH PANEL RACKS).

Step 13 INSTALL NEW CER COOLING SYSTEM.

· INSTALL NEW CRAC’S AND CHILLED WATER PIPING. CONNECT NEW PIPING TO NEW CHILLER.

· INSTALL NEW PANELS PP2A AND PP2B AND CONNECT TO NEW MSB2 AND MSB3. INSTALL POWER

CIRCUITS FROM NEW PANELS PP2A AND PP2B TO NEW CRAC’S.

· START-UP AND COMMISSION NEW CER COOLING SYSTEM.

Step 14 DEMOLISH EXISTING CER COOLING SYSTEMS.

Step 15 DEMOLISH THE EXISTING EPO SYSTEM.

Step 16 INSTALL NEW LIGHTING AND DEMOLISH THE TEMPORARY LIGHTING.

Step 17 INSTALL THE NEW OVERHEAD VESDA SYSTEM AND CONNECT IT TO THE EXISTING FIRE ALARM SYSTEM.

SAMPLING PORTS SHALL BE CAPPED UNTIL SYSTEM COMMISSIONING.

Step 18 REMOVE THE PROTECTION OVER THE CER RACKS.

Step 19 INSTALL THE NEW UNDER-FLOOR VESDA SYSTEM AND CONNECT TO THE EXISTING FIRE ALARM SYSTEM.

SAMPLING PORTS SHALL BE CAPPED UNTIL SYSTEM COMMISSIONING.

Step 20 PERFORM REQUIRED UNDER-FLOOR CABLE TRAY WORK.

Step 21 COMMISSION THE NEW OVERHEAD AND UNDER-FLOOR VESDA SYSTEMS.

NOTE THAT SOME WORK, SUCH AS MISCELLANEOUS ARCHITECTURAL AND STRUCTURAL WORK WITHIN THE CER (RAISED FLOOR MODIFICATIONS AS REQUIRED, WALL FINISHES, ETC.), DOES NOT NECESSARILY FIT INTO A SINGLE SPECIFIC STEP, AND THEREFORE CAN BE PERFORMED CONCURRENTLY WITH ONE OR MORE OF THE ABOVE STEPS.

1.3 PHASE 2 (REMAINDER OF BUILDING AND PERMANENT SECURE BOUNDARY) SEQUENCE OF CONSTRUCTION

1.3.1 THE PHASE 2 ACTIVITIES DESCRIBED BELOW MAY BE ACCOMPLISHED DURING PHASE 1. HOWEVER, CRITICAL SERVICES (POWER, COMMUNICATIONS, AND COOLING) TO THE CER MUST REMAIN IN OPERATION TO ENSURE MISSION CONTINUITY.

EXAMPLES OF SUCH SYSTEMS INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, THE FOLLOWING.

· CH-1A AND CRFC-1, INCLUDING ASSOCIATED PUMPS, PIPING, AND APPURTANENCES (UNTIL THEIR REMOVAL IN

PHASE 1 STEP 14)

· DFC-1 AND CRFC-3, INCLUDING ASSOCIATED PUMPS, PIPING, AND APPURTANENCES (UNTIL THEIR REMOVAL IN

PHASE 1 STEP 14)

· RTU-3 (UNTIL REMOVAL IN PHASE 1 STEP 14)

· EXISTING TECHNICAL POWER SYSTEM PDU-S AND PANELBOARDS (UNTIL THEIR REMOVAL IN PHASE 1 STEP 10)

· EXISTING UPS SYSTEMS AND OTHER POWER DISTRIBUTION SERVING THE CER

1.3.2 ADDITIONALLY, WORK WHICH MAY DISTURB POWER OR HVAC SERVICE TO EXISTING ROOM 12, INCLUDING THE EXISTING SECURITY EQUIPMENT THEREIN, SHALL NOT PROCEED UNTIL THE CER AND TEMPORARY SECURED FACILITY HAS BEEN ACCREDITED AND THE EXISTING SECURITY EQUIPMENT HAS BEEN REMOVED FROM ROOM 12. THE GOVERNMENT REQUIRES ONE WEEK TO REMOVE THE EXISTING SECURITY EQUIPMENT FROM ROOM 12 AFTER THE CER AND

TEMPORARY SECURED FACILITY HAS BEEN ACCREDITED.

1.3.3 AS A GENERAL OUTLINE, THE WORK IS TO BE SEQUENCED AS FOLLOWS:

Step 1 INTERIOR DEMOLITION

Step 2 INTERIOR CONSTRUCTION

Step 3 EXTERIOR DEMOLITION AND CONSTRUCTION

Step 4 TEST AND ACTIVATE NEW WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH THE APPROVED COMMISSIONING

PLAN.

Step 5 REMOVE TEMPORARY SPRINKLER CURTAIN SYSTEM AROUND CER AND FINISH THE CEILING WORK IN THIS AREA.

Step 6 INSTALL FF&E AS REQUIRED.

Step 7 PULL CONDUIT AND CABLE FOR SECURITY WIRING THROUGH THE WALL INTO ROOM 37. PROVIDE 14 DAYS’ NOTICE

SO THAT THE GOVERNMENT CAN PROVIDE ESCORTS FOR THIS WORK.

Step 8 GOVERNMENT TEAM WILL TERMINATE ALL SECURITY WIRING INTO THE SECURITY BACKBOARD IN ROOM 37.

Step 9 FINISH ALL PERIMETER WORK REQUIRED TO FINALIZE THE BUILDING ICD/ICS 705 BOUNDARY INCLUDING:

· REPLACE EXISTING DOOR X82 WITH DOOR 37.1

· INSTALL DOOR 37.2

· REMOVE EXISTING DOOR X83 AND FINISH OPENING AS SHOWN

· REPLACE EXISTING DOOR X78 WITH DOOR 33.1

· REMOVE EXISTING DOOR X79 AND INFILL OPENING.

· GOVERNMENT TEAM WILL COMMISSION THE SECURITY SYSTEM.

· GOVERNMENT TO DECERTIFY TEMPORARY SECURE FACILITY AND OBTAIN SECURE FACILITY

CERTIFICATION FOR ENTIRE BUILDING (B2500 AND B2510).

1.3.3 INSTALLATION OF THE NEW AUTOMATIC TRANSFER SCHEME IN EXISTING SWITCHGEAR MSA/MSB SHALL ALSO OCCUR

DURING PAHSE 2, BUT IS NOT TIED TO ONE OF THE SPECIFIC STEPS OUTLINES ABOVE.

4 5321

D

C

B

A

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

F

IL

E N

U M

B E

R

IS

S

U E

D A

T E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

S

IZ

E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

X

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

G re e n w o d P la z a B lv d

G re e n w o o d V ill a g e

C O

S e n a te

A ve n u e

C a m p H ill P

A

S U

B M

IT

T

E D

B Y

US Army Corps of Engineers ®

W ild fl o w e r

C o u rt

N e w

H o p e P

A

L o c a l F ile

AT FULLSIZE: = 1 INCH

/1

/2

:2

:4

P M

B

IM

/0

B

V a n d e n b e rg /6

V a n d e n b e rg

B

A c e n tr a l_ R

A

.r v t

GI103

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

S E

Q U

E N

C E

O F

C O

N S

T R

U C

T

IO

N

B R

E N

O V

A T

IO

N

J

F

IC

K E

S

J

F

IC

K E

S

C

B E

A U

D U

Y

F E

B R

U A

R Y

V a n d e n b e rg

B A c e n tr a l_

R A

.r vt

ISSUED FOR CONSTRUCTION

L O

S A

N G

E L E

S D

IS

T

R

IC

T

J

D e G o u r

W P

L -1

-C

-0

W O

L -1

-R

-0

C e n tr a l F ile B

IM

V a n d e n b e rg

B A c e n tr a l_

R A

.r v t

P ro je c t N u m b e r:

V A

N D

E N

B E

R G

A

IR

F O

R C

E B

A S

E

X

X X

TRAILERS

FOR TSLV

AR

IZ

ON

A

AV

E

AR

IZ

ON

A

AV

E

32 ND STREET

BLDG

BLDG

BLDG

TRANSFORMER

COMM

VAULT

COMPLEX

TRAILER

SEWER

MANHOLE

TRANSFORMER

TRANSFORMER

CHILLER

SLAB

PICNIC

AREA

BASKETBALL COURT

X X

X X

X X

X X

X X

X X

X X

X XX X X X X X X X X X X X X

X

X X

X X

X X

X X

X X

XX XX

XX XXXX

X X

XX XXXXX

X X

97.2'

132.8'

PERIMETER FENCE

PERIMETER FENCE

231.9'

4.

4'

PERIMETER FENCE

PERIMETER FENCE

.0

.0

86.0'

.0

.0

86.0'

PERIMETER FENCE

86' STANDOFF

28.1'

.2

.5

BUILDING 2510 BUILDING 2500

86' STANDOFF FROM BUILDING PERIMETER

PERIMETER FENCE

N

PROJECT

NORTH

KEY PLAN

B2510

4 5321

D

C

B

A

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

FI

LE

N U

M

BE

R

IS

SU

E D

AT

E:

C H

EC

KE

D B

Y: FI

LE

N

AM

E:

SI

ZE

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

" X

4"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

G re en w od P la za

B lv d G re en w oo d Vi lla ge

, C O

Se na te

A ve nu e

C am p H ill, P

A

SU

BM

IT

TE

D B

Y:

US Army Corps of Engineers ®

AREA 'A'

W ild flo w er

C ou rt N ew H op e, P A

AREA 'B'

Lo ca l F ile

AT FULLSIZE: = 1 INCH

3/ 4/

2:

:4

PM

BI

M

B2

Va nd en be rg /6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t

GI104

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

AT

FP

S

TA

N D

O

FF

D

IS

TA

N

C

ES

B2

R

EN

O

VA

TI

O N

J.

F

IC

KE

S

J.

F

IC

KE

S

C . B

EA

U

D U

Y

FE

BR

U

AR

Y

, 2

6_ Va nd en be rg

B

_A

_c en tra l_

R

_A

0.

rv t

ISSUED FOR CONSTRUCTION

LO

S

AN

G

EL

ES

D

IS

TR

IC

T

J.

D eG ou r

W

2P L-

-C

-0

W

2O L-

-R

-0

C en tra l F ile : B

IM

0:

\6

_V an de nb er g

B2

0_ A_ ce nt ra l_

R

_A

0.

rv t Pr oj ec t N um be r:

VA

N

D

EN

BE

R

G A

IR

F

O R

C E

BA

SE

SCALE: NTSGI104

ATFP MINIMUM STANDOFF DISTANCES1

AT/FP STANDOFF LEGEND

NOTE: ATFP REQUIREMENTS - COMPLY WITH UFC 04-010-01 (2018)

N

PROJECT

NORTH

KEY PLAN

B2510

4 5321

D

C

B

A

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

F I L

E

N

U M

B E

R

I S

S U

E

D

A T

E

C H

E C

K E

D

B

Y

F I L

E

N

A M

E

S I Z

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

C T

O

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SHEET ID

G r e e n w o d

P l a z a

B l v d

G r e e n w o o d

V i l l a g e

C

O

S e n a t e

A v e n u e

C a m p

H l l

P

A

S U

B M

I T

T E

D

B

Y

US Army Corps of Engineers ®

W l d f l o w e r

C o u r t

N e w

H o p e

P

A

L o c a l

F i l e

AT FULLSIZE: = 1 INCH

B

D

I X

O N

T

K

E A

N E

B

D

I X

O N

W

O L

R

W

P L

C

U

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

L O

S

A

N G

E L

I S

T R

I C

T

B

R

E N

O V

A T

I O

N

TC001

LEGEND:

PICNIC AREA

BLDG 2505

EXISTING FENCING

BLDG 2500

T E

M P

O R

A R

Y

C O

N S

T R

U C

T I O

N

P

L A

N

TSLV TRAILER #2

TSLV TRAILER #1

BLDG 2509

BLDG

V A

N D

E N

B E

R

S

E

P

M

K

V a n d e n b e r g

B

W o r k i n g C

A D

D C i v i l C

T

E M

P C

O N

S T

P

L A

N d w g P r o j e c t

N u m b e r

J U

ISSUED FOR CONSTRUCTION

A p p r o v e r

V

A N

D E

N B

E R

G

B

C

T

E M

P C

O N

S T

P

L A

N D

W G

ARIZONA AVE

GEN.

TEMPORARY CONSTRUCTION FENCE

BLDG 2510

BLDG 2530

CONTRACTOR TRAILER (S)

N

D

S

T R

E E

T

R

D

S

T R

E E

T

EXISTING AUTOMATED VEHICLE GATE TO REMAIN

CLOSED DURING CONSTRUCTION HOURS - CARD

READER ACCESS TO BE PROVIDED

TEMPORARY

SWING GATE

FOR DELIVERIES

TEMPORARY VEHICULAR

MANUAL SWING GATE

EXISTING AUTOMATED

VEHICLE GATE

TEMPORARY 2" ASPHALT PAVED WALK SURFACE

(PRIOR TO PUTTING UP CONSTRUCTION FENCE)

NEVADA AVE

P R

O V

I D

E

B

A S

E

C

O U

R S

E

P

A R

K I N

G

O

R

E E

T

L

T

H

E

N T

R I E

S

O

T

H

C

R O

R

E E

T S

R

I Z

O N

A

C

O M

P L

E T

E

P

R I O

R

T

O

P

U T

T I N

G

U

P

C O

N S

T R

U C

T I O

N

F

E N

C E

CLEAR ZONE

TEMPORARY 2" ASPHALT

PAVED WALK SURFACE TO

MATCH CURRENT GRADE

(PRIOR TO PUTTING UP

CONSTRUCTION FENCE)

GENERAL NOTES:

1. 4" BASE COURSE TO BE PROVIDED FOR TEMPORARY

VEHICLE PARKING AND WALKING SURFACES FOR

UNPAVED AREAS.

PEDESTRIAN ROUTE

EXIT CARD READER

30' FENCE CLEAR ZONE

K E

E

A R

BASKETBALL

COURT

B2500

24'

60'

CONTRACTOR PERSONNEL ENTRY GATE

(EMERGENCY EGRESS GATE)

CONTRACTOR PARKING

OFF NEVADA AVE

242'

PACKAGE GATE CARD

READER ACCESS 24/7

CONTRACTOR LAYDOWN AREA -

RETURN TO SOD AT END OF PROJECT

TEMPORARY

PERSONNEL GATE

5'

4" BASE COURSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

EXISTING FENCE

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

KEY PLAN

B2510

4 5321

D

C

B

A

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

F I L

E

N

U M

B E

R

I S

S U

E

D

A T

E

C H

E C

K E

D

B

Y

F I

M

E

S I Z

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SHEET ____ OF ____

SHEET ID

e e n w o d

P l a v d

G r e e n w o l l a g e

C

O

S e n a e n u e

C a l l

P

A

S U

B M

I T

T E

D

B

Y

US Army Corps of Engineers ®

AREA 'A'

l d f l o w e r

C o u r t

N e w

H o p e

P

A

AREA 'B'

L o c a l

F i l e

AT FULLSIZE: = 1 INCH

B

D

I X

O N

T

M

O O

R E

B

D

I X

O N

W

O L

R

W

P L

C

M

Y

C

O R

E

N G

I N

E E

R S

L O

S

A

N G

E L

S

T R

I C

T

B

R

E N

O V

A T

I O

N

C001

100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION

S I T

E

H

A U

L

R

O U

T E

C A

L I F

O R

N

A L A

B A

M

E

O C

E A

N

V I E

W

A I R

F I E

L D

N E

W

M

E X

I C

O

A

V E

R D

L A

U R

A L

O A

K S

T R

E E

T

E L D

STREET

CEDAR

STREET

ASPEN

STREET

STREET

VIEW

STREET

NUTMEG STREET

STREET

WYOMING

BLVD.

MAIN GATE

N

HAUL ROUTE

HAUL ROUTE

35TH ST

ENTER SITE ON

33RD STREET

W A

S H

IN

G

TO

N

A V

E

33RD STREET

2200 AREA

T

I M

B

E

R

L

A

N

E

C

O

T

T

O

N

W

O

O

D

T

A

X

I

W

Y

A

X

I

W

A

M

A

R

A

C

K

S

T

R

E

E

T

M

I

D

D

H

O

O

L

A

Z

A

L

N

E

M

E

X

I

C

O

M

A

D

A

L

A

S

K

Y

C

A

L

I

F

O

R

N

E

C

A

L

I

F

O

R

N

E

A

L

A

B

A

E h

R

E

E

T

S

P

R

U

C

E

S

T

R

E

E

T

T

E

A

K

B

O

U

L

E

V

A

R

D

F

E

N

E

F

I

R

E

T

H

O

N

E

H

E

M

L

O

C

K

W

I

L

L

R

E

E

T

I

C

E

L

A

E

S

Y

C

A

M

O

R

E

R

O

S

E

W

O

O

D

S

T

R

E

E

T

P

O

P

L

A

R

U

T

E

I C

E

L

A

E

S

A

B

E

R

S

A

G

E

B

A

S

S

W

O

O

D

W

A

S

H

I N

G

T

E

C

A

L

I F

O

R

N

E

N

E

V

A

E

U

T

E

S

T

R

E

E

T

H

A

C

K

E

N

B

E

R

R

Y

P

E

C

R

E

E

T

H

A

W

T

H

O

R

E

E

T

H

E

A

R

E

E

T

M

U

L

B

E

R

R

E

E

T

N

E

B

R

A

S

E

B

E

E

R

E

E

T

C

H

E

R

R

Y

S

T

R

E

E

T

A

R

B

O

R

G

R

E

E

T

S

T

O

R

A

M

I

D

W

E

G

U

E

L

D

R

E

S

K

O

R

I

N

A

O

C

E

A

N

C

A

M

I

S

N

E

H

E

A

T

H

N

E

J

U

N

I

P

E

R

S

T

R

E

E

T

V

I E

W

B

L

V

D

STREET

N

E W

B

A

Y

W

O

O

D

A

I

R

F

I

E

A

C

A

C

I

A

S

A

N

C

N

Y

L

A

M

P

H

O

R

A S

H

S T

R E

E T

K O

R I N

A

H I C

K O

C A

L I F

O R

N

A

E

U T

A H

ASPEN

ASPEN

OCEAN

LOCUST

MAPLE

STREET

MONTANA

JUNIPER

AVENUE

JUNIPER STREET

ENTRY/EXIT AT

LOMPOC GATE

32ND ST

PROJECT

LOCATION

34 ST

35TH ST

33RD ST

2300 AREA

33RD ST

N

750'

SCALE: 1"=1500'-0"

0 750' 1500'

E

B

O

N

Y

S

T

R

E

E

T

L

O

M

P

S

M

A

L

A

D

S

T

R

E

E

T

A

I

R

F

I

E

T

A

X

I

W

A

X

I

W

O

R

I

N

A

M

A

D

T

A

X

I

W

A

X

I

W

A

T

E

A

V

E

N

U

E

S

T

R

E

E

T

C

A

L

I

F

O

R

N

I

A

V

A

N

D

E

N

B

E

R

G

W

I

L

L

R

E

E

T

C

A

R

R

E

E

T

Y

U

C

M

A

P

H

O

O

L

A

L

A

B

A

E

N

X

I

E

C

I

R

C

L

E

S

A

N

R

B

A

E

A

R

I

Z

O

E

N

E

V

A

E

A

R

I

Z

O

E

N

E

V

A

E

N

X

I

E

N

X

I

E

N

E

V

A

E

A

R

I

Z

O

E

D

R

I

V

E h

R

E

E

T

U

T

A

H

R

E

D

W

O

R

E

E

T

S

T

R

E

E

T

T

E

A

K

O

L

I

V

E

S

T

R

E

E

T

S

T

R

E

E

T

C

A

L

I

F

O

R

N

I

A

S

T

R

E

E

T

I

R

O

N

W

O

R

E

E

T

K

O

R

I

N

A

S

T

R

E

E

T

K

O

R

I

N

A

S

T

R

E

E

T

Q

U

I

N

R

E

E

T

N

X

I

E

S

T

R

E

E

T

T

E

R

R

A

R

D

S

T

R

E

E

T

A

V

E

N

U

E

S

T

R

E

E

T

P

I N

E

S

T

R

E

E

T

A

V

E

N

U

E

S

T

R

E

E

T

N

E

V

A

E

B

U

C

K

E

Y

E

C

H

E

S

T

N

U

T

H

A

Z

E

L

N

U

T

M

U

L

B

E

R

I V

E

S

T

R

E

E

T

N

E

B

R

A

S

E

H

E

R

A

E

W

A

S

H

I N

G

T

E

T

A

N

G

A

A

D

J

A

C

K

A

R

A

N

R

E

E

T

L

O

M

P

E

C

A

L

I F

O

R

N

E

K

A

T

S

U

R

E

E

T

M

O

C

K

E

R

N

R

E

E

T

S

T

R

E

E

T

D

R

I

V

E

O

C

E

A

N

V

I

E

W

B

L

V

D

E

L

M

S

T

R

E

E

T

G

R

E

E

T

E

R

E

E

T

U

T

E

E

L

E

M

E

N

T

A

H

O

O

L

C

O

M

M

U

N

I

O

P

T

A

N

G

A

I

R

S

U

M

A

C

L

O

M

P

O

C

C

A

S

M

A

L

I

A

R

O

A

D

V

I

E

W

B

L

V

D

C

A

M

E

L

L

N

E

M

O

N

T

A

N

A

A

V

E

N

U

E

M

A

G

N

O

L

I

A

S

T

R

E

E

T

W

A

S

H

I

N

G

T

E

M

O

U

N

T

A

I N

ASH

S T

R E

E T

U

T

A

H

F

SITE LOCATION MAP

SCALE : 1'' = 1500'

VICINITY MAP

SCALE : NOT TO SCALE

V A

N D

E N

B E

R

S

E

P

M

K

V a n d e n b e r g

B

W o r k i n g C

A D

D C i v i l C

S

I T

E P

L A

N d w g

C e n t r a l

F i l e

B

I M

V a n d e n b e r g

B

A c e n t r a l R

A r v t

P r o j e c t

N u m b e r bdixon Snapshot

1" DW

32ND STREET

BLDG 2505

G A

S

C

O V

E R

S E

W E

R

C

O V

E R

C O

U

L T

C O

U

L T

G A

S

V

A L

V E

G A

S

V

A L

V E

G A

S

V

E N

T

C O

M M

COMM

C O

M M

C

O M

M

8" SS

8" SS

14" FW 14" FW

14" FW

S

S

D

W

F

W

G

G

D

W

3/4" G

3/4" G

3/4" G

S

S

E

E

C

O M

M

E

E

E

" P

V C

F

W

AIP3" CW

AIP1" E

M

M

G

2" ABS

N O

N O

E

F

W

F

W

D

W

F

W

D

W

D

W

W V

S

S

WV

W V

S E

W E

R

M

A N

H O

L E

E L

E C

T R

I C

U

L T

T R

A N

S F

O R

M E

R

PICNIC AREA

W V

D

W

3/4" E

1" DW

1" E

2" E 2" E

E

E

E

2" E

2" E

P U

L L

B O

X

P U

L L

B O

X

1" E

1" E 1" E

1" E

E

1" E

E

E

1" E

6" PVC

6" PVC

E

TRAILER POWER

TRANSFORMER PAD

TSLV TRAILER #2

TSLV TRAILER #1

ARIZONA AVE

V

BLDG 2509

BLDG

N

PROJECT

NORTH

KEY PLAN

B2510

4 5321

D

C

B

A

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

F I L

E

N

U M

B E

R

I S

S U

E

D

A T

E

C H

E C

K E

D

B

Y

F I

M

E

S I Z

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SHEET ____ OF ____

SHEET ID

e e n w o d

P l a v d

G r e e n w o l l a g e

C

O

S e n a e n u e

C a l l

P

A

S U

B M

I T

T E

D

B

Y

US Army Corps of Engineers ®

AREA 'A'

l d f l o w e r

C o u r t

N e w

H o p e

P

A

AREA 'B'

L o c a l

F i l e

AT FULLSIZE: = 1 INCH

B

D

I X

O N

T

M

O O

R E

B

D

I X

O N

W

O L

R

W

P L

C

M

Y

C

O R

E

N G

I N

E E

R S

L O

S

A

N G

E L

S

T R

I C

T

B

R

E N

O V

A T

I O

N

SHEET NOTES:

C002

100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION

LEGEND:

TELECOMMUNICATIONS LINE

DOMESTIC WATER LINE

FIRE WATER LINE

NATURAL GAS LINE

SANITARY SEWER LINE

STORM DRAIN

UNDERGROUND ELECTRIC LINE

BLDG 2500

U T

I L

I T

Y

P

L A

N

EXISTING BOLLARD

GENERAL NOTES:

1. PROTECT EXISTING SIDEWALK AND OTHER EXTERIOR

FEATURES IN PLACE AS NECESSARY. CONTRACTOR IS

RESPONSIBLE FOR DAMAGES AND REPAIRS AT NO COST TO

OWNER.

2. UTILITIES SHOWN ON THIS PLAN ARE APPROXIMATE AND

ARE FOR REFERENCE ONLY. CONTRACTOR IS TO VERIFY

FIELD LOCATION OF UTILITIES AND REPORT TO ENGINEER

OF RECORD IF DISCREPANCIES ARE PRESENT.

BLDG 2510

NEW CHILLER UNIT ACC-2. SEE MECHANICAL PLANS.

36'' x 36'' PRECAST CONCRETE HANDHOLE

CONCRETE ENCASED DUCTBANK (3) 4'' - TWO ACTIVE, ONE

SPARE (FEEDER 006)

CONCRETE ENCASED DUCTBANK (3) 4''-TWO ACTIVE, ONE SPARE

(FEEDER 003), AND (1) 1'' (TECH POWER FROM TP3B TO SWGR)

CONCRETE…