B2500 Renovation W912PL19B0005 Vandenberg AFB, CA

APPENDICES

* Interior Finish Board

* Submittal Register – 63 pages

* Furniture, Fixtures and Equipment (FFE) – 105 pages

INTERIOR FINISH BOARD

B2500 Renovation

Vandenberg Air Force Base, California

February 21, 2019

APC1 – CEILING TILE

CG1 AND CR1

CORNER GUARD

CHAIR RAIL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 63 PAGES

B2500 Vandenberg

01 11 00 SD-01 Preconstruction Submittals

1.7 GSalvage Plan

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4 GMonthly Exposure Reports

1.12 GNotifications and Reports

1.12.2 GAccident Reports

1.12.3 GLHE Inspection Reports

SD-07 Certificates

1.6.1.4 GCrane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8 GActivity Hazard Analysis (AHA)

1.9.1 GConfined Space Entry Permit

1.9.1 GHot Work Permit

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 63 PAGES

01 45 00.00 10 SD-06 Test Reports

3.9.2 GVerification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1 GWritten Practices

3.1.3 GWritten Practices

3.1.1 GNDT Procedures and Equipment

Calibration Records

3.1.3 GNDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1 GDaily Reports

3.1.3 GDaily Reports

3.1.1 GBiweekly Reports

3.1.2 GBiweekly Reports

SD-07 Certificates

2.1 GFabrication Plant

2.1 GAC472 Accreditation

2.1 GCertificate of Compliance

1.5.11 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1 GQualification Records

3.1.3 GQualification Records

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 63 PAGES

01 45 35 3.1.1 GInterim Final Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-03 Product Data

1.4 GBackflow Preventers

SD-06 Test Reports

2.5 GBackflow Preventer Tests

SD-07 Certificates

1.4.1 GBackflow Tester

1.4 GBackflow Preventers

01 57 20 SD-01 Preconstruction Submittals

3.2 GEnvironmental Protection Plan

3.13 GAir Emissions data

3.12.2.2 GStorm Water Pollution Prevention

Plan (SWPPP)

SD-03 Product Data

3.13.9 Gboilers

3.13.9 Ghot water heaters

SD-05 Design Data

3.14 GAboveground Storage Tank

(AST)

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 63 PAGES

01 57 20 3.14 GAir Quality Recordkeeping Form

3.13.9 GEmission Standards

1.2.16 GHazardous Material

3.17 GRecovered Materials

Determination Form (RMDF)

3.17 GRecovered Material Content

1.2.11 GSolid Waste

3.12.5 GIndustrial Wastewater Treatment

Plant Processing Request

3.14 GDischarge to Grade

1.5.4 GStorm Water

3.12.2.2 GSWPPP

1.4.1 GInspection

1.4.1 GNoncompliance

SD-07 Certificates

3.12.2.2 GRisk Assessment

3.12.2.2 GNotice of Termination

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6 GRecords

01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5 GWarranty Tags

1.5 GSpare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 63 PAGES

01 78 00 1.7.1 GInstructions

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

2.1 GCertification of EPA Designated

Items

3.8 GInterim DD FORM 1354

3.8 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 63 PAGES

01 91 00.15 1.7.1 GLead Commissioning Specialist

1.7.2 GTechnical Commissioning

Specialists

SD-06 Test Reports

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.4.2 GPre-Functional Checklists

1.8 GIssues Log

3.2 GCommissioning Report

3.3.1 GPost-Construction Trend Log

Report

SD-07 Certificates

1.9 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 GTraining Plan

3.1.5 GTraining Attendance Rosters

3.1.6 GSystems Manual

SD-11 Closeout Submittals

3.2 GFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 63 PAGES

02 41 00 1.9 GExisting Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.3 GReceipts

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data

2.2 GForm Materials

SD-05 Design Data

2.1 GCalculations

SD-06 Test Reports

3.2 GInspection

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data

2.3 GReinforcing Steel

SD-06 Test Reports

2.8 GTests, Inspections, and

Verifications

SD-07 Certificates

2.3 GReinforcing Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 63 PAGES

03 20 00.00 10 1.3.1 GQualified Welders

1.3.2 GQualification of Steel Bar

Butt-Splicers

03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.5 GQuality Control Plan

1.5.4 GLaboratory Accreditation

1.5.6 GQuality Control Personnel

Certifications

1.5.6 GQuality Control Organizational

Chart

1.5.1.1 GConcrete Curing Plan

SD-02 Shop Drawings

3.2 GReinforcing Steel

SD-03 Product Data

2.3 GCementitious Materials

2.16 GVapor Retarder And Vapor

Barrier

2.2.7 GFloor Finish

2.15 GFloor Hardener

2.5 GChemical Admixtures

2.17.2 GJoint Sealant

2.17.1 GJoint Filler

2.1 GMaterials For Forms

2.7 GConcrete Curing Materials

2.10.3 GMechanical Reinforcing Bar

Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 63 PAGES

03 30 00.00 10 SD-04 Samples

1.5.3 GSurface Finish Sample

SD-05 Design Data

2.2.1 GConcrete Mix Design

SD-06 Test Reports

2.2.1 GConcrete Mix Design

2.3.3 GFly Ash

1.5.2.1 GPozzolan

2.3.6 GGround Granulated Blast-Furnace

(GGBF) Slag

2.4 GAggregates

2.2.1.1.1.1GAir Content

3.10.2.4 GAir Content

3.10.2.3 GCompressive Strength Tests

3.10.2.1 GSlump Tests

2.6 GWater

SD-07 Certificates

1.5.1.2 GMaterial Safety Data Sheets

1.5.6.2 GField Testing Technician And

Testing Agency

03 39 00.00 10 SD-03 Product Data

2.1 GCuring Materials

SD-06 Test Reports

3.2 GTesting and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1 GCuring Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 63 PAGES

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.1.1 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.2.1 GConcrete Masonry Units (CMU)

2.6.1 GAnchors, Ties, and Bar

Positioners

2.6.2 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.5 GBracing Calculations

SD-06 Test Reports

3.6.1.1 GField Testing of Mortar

3.6.1.2 GField Testing of Grout

SD-07 Certificates

1.3.1 GSpecial Masonry Inspector

Qualifications

2.2.2.1 GConcrete Masonry Units (CMU)

2.4.1.1 GCementitious Materials

2.6.1 GAnchors, Ties, and Bar

Positioners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 63 PAGES

04 20 00 2.6.2 GJoint Reinforcement

SD-10 Operation and Maintenance

Data

3.8 GTake-Back Program

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4 GWelder, Welding Operator, and

Tacker Qualification

1.3.2 GPrevious Qualifications

1.3.3 GPre-Qualified Procedures

2.2 GWelding Electrodes and Rods

SD-06 Test Reports

3.3 GNondestructive Testing

3.2 GWeld Inspection Log

SD-07 Certificates

1.3.1 GCertified Welding Procedure

Specifications (WPS)

1.3.1 GCertified Brazing Procedure

Specifications (BPS)

1.3.1 GCertified Procedure Qualification

Records (PQR)

1.3.1 GCertified Welder Performance

Qualifications (WPQ)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 63 PAGES

05 05 23.16 1.3.1 GCertified Brazer Performance

Qualifications (BPQ)

1.3.5 GCertified Welding Inspector

1.3.5 GNondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2 GShop Primer

2.4.1 GWelding Electrodes and Rods

2.4.2 GNon-Shrink Grout

SD-05 Design Data

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.3 GBolts, Nuts, and Washers

3.7.1.2 GWeld Inspection Reports

3.7.2 GEmbrittlement Test Reports

SD-07 Certificates

2.2 GSteel

2.3 GBolts, Nuts, and Washers

2.5 GGalvanizing

1.3 GAISC Structural Steel Fabricator

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 63 PAGES

05 12 00 1.3 GAISC Structural Steel Erector

Quality Certification

1.4.3.1 GWelding Procedures and

Qualifications

2.4.1 GWelding Electrodes and Rods

3.7.1.1 GCertified Welding Inspector

3.7.1.2 GNDT Technician

3.4 GWelding Procedure Specifications

(WPS)

05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data

2.1 GStuds, Joists

2.1 GRecycled Content of Steel

Products

SD-05 Design Data

1.5.2 GMetal Framing Calculations

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 63 PAGES

05 51 00 2.2.3 GProtective Coating

2.3.1 GSteel Stairs

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.2.3 GProtective Coating

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.1.2 GProtective Coating

2.2.5 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 63 PAGES

05 52 00 SD-08 Manufacturer’s Instructions

3.2 GInstallation Instructions

06 10 00 SD-03 Product Data

GPlywood and Structural-use

Panels

2.4.2 GAdhesives

SD-06 Test Reports

1.4.3 GPreservative-treated

SD-07 Certificates

1.8.1 GCertificates of Grade

1.7 GPreservative Treatment

06 41 16.00 10 SD-02 Shop Drawings

1.4.2 GShop Drawings

2.10 GShop Drawings

3.1 GInstallation

SD-03 Product Data

2.1 GWood Materials

2.10.7.3 GFinish Schedule

1.4.3 GCertification

SD-04 Samples

2.3 GPlastic Laminates

2.6 GCabinet Hardware

SD-07 Certificates

1.4 GQuality Assurance

3.1 GLaminate Clad Casework

06 61 16 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 63 PAGES

06 61 16 3.1 GInstallation

SD-03 Product Data

2.1 GSolid Polymer Material

1.5.1 GQualifications

2.3 GFabrications

2.2.4 GIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.4 GCounter and Vanity Tops

SD-06 Test Reports

2.1 GSolid Polymer Material

SD-07 Certificates

2.3 GFabrications

1.5.1 GQualifications

2.1 GIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2 GClean-up

07 21 16 SD-03 Product Data

2.1 GBlanket Insulation

2.1.2 GRecycled Content for Insulation

Materials

2.2 GAccessories

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 63 PAGES

07 21 16 2.1.4 GIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

3.3.1 GInsulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

SD-06 Test Reports

1.7.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.1 GInsulation

07 27 26 SD-01 Preconstruction Submittals

1.6.1 GQualifications of Manufacturer

1.6.2 GQualifications of Installer

SD-02 Shop Drawings

1.3 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.3 GFluid-Applied Membrane Air

Barrier

2.2 GPrimers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 63 PAGES

07 27 26 2.4 GReinforcement

1.3.2 GSafety Data Sheets

SD-06 Test Reports

1.5 GCapillary Moisture Test

1.3.3 GField Peel Adhesion Test

1.3.3 GFlame Propagation of Wall

Assemblies

1.3.3 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.3 GFluid-Applied Membrane Air

Barrier

1.6.1 GQualifications of Manufacturer

1.6.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.3 GFluid-Applied Membrane Air

Barrier

2.2 GPrimers, Adhesives, and Mastics

07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 63 PAGES

07 42 13 SD-03 Product Data

2.2.1 GWall Panels

2.2.2 GFactory Color Finish

1.5.5 GClosure Materials

2.5.3.4 GPressure Sensitive Tape

2.5.3.1 GSealants and Caulking

1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

1.5.5 GAccessories

2.5 GAccessories

SD-04 Samples

2.2.2.5 GColor chart

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

2.2.2.6 GCoating

2.2.2.6 GChalking

1.3.2 GSeismic Tests

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 63 PAGES

07 42 13 3.3 GInstallation

SD-09 Manufacturer’s Field

Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

1.8.1 G20 year 'No Dollar Limit' warranty

for labor and material

07 54 19 SD-02 Shop Drawings

1.6 GDetail Drawings

1.6 GRoof Plan

SD-03 Product Data

3.3.2 GPVC Roofing Membrane

2.1.2 GBonding Adhesive

1.5.5 GFlashing

3.3.2.1 GFlashing

2.1.6 GRoof Insulation

SD-05 Design Data

1.3.2 GWind Uplift Resistance

SD-07 Certificates

1.5.1 GQualification of Manufacturer

1.5.2 GQualifications of Applicator

1.5.4 GQualification of Engineer of

Record

1.3.2 GWind Uplift Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 63 PAGES

07 54 19 1.3.1 GFire Resistance

2.1.1 GMinimum Polymer Thickness

2.1.4 GMinimum Polymer Thickness

1.10 GSample

SD-08 Manufacturer’s Instructions

3.3 GApplication Method

2.1.4 GMembrane Flashing

3.4.2 GMembrane Flashing

3.3.4 GPerimeter Attachment

1.8 GCold Weather

SD-11 Closeout Submittals

1.10 GWarranty

3.10 GInstructions to Government

Personnel

07 60 00 SD-02 Shop Drawings

2.1.1 GExposed Sheet Metal

3.1.10 GGutters

3.1.11 GDownspouts

2.1.1 GGravel Stops and Fasciae

3.1.8 GCounterflashing

3.1.12 GCopings

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

3.5 GQuality Control Plan

07 84 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 63 PAGES

07 84 00 2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2 GInspector Qualifications

2.2 GFirestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

2.1.1 GIndoor Air Quality For Interior

Sealants

2.1.3 GIndoor Air Quality For Interior

Acoustical Sealants

2.5 GIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GRecycled Content for Steel Door

Product

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 63 PAGES

08 11 13 2.3 GFrames

2.3 GFrames

2.3 GRecycled Content for Steel Frame

Product

SD-03 Product Data

2.3 GFrames

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2 GAccessories

2.3.7 GWater-resistant Sealer

1.5 GWarranty

2.1.2 GSound Transmission Class

Rating

2.1.3 GFire Resistance Rating

SD-04 Samples

2.1 GDoors

2.3.6.2 GDoor Finish Colors

SD-06 Test Reports

2.4 GCycle-Slam

2.4 GHinge Loading Resistance

SD-07 Certificates

1.3.1 GCertificates of Grade

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 63 PAGES

08 14 00 2.1.1.1 GIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5 GWarranty

08 34 02 SD-02 Shop Drawings

3.3 GInstallation

SD-03 Product Data

1.4 GBullet Resistant Components

SD-07 Certificates

1.4 GBullet Resistant Components

SD-10 Operation and Maintenance

Data

1.4 GBullet Resistant Components

08 34 73 SD-02 Shop Drawings

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

SD-03 Product Data

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

2.1 GIntumescent Seals and Gasketing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 63 PAGES

08 34 73 2.1 GThresholds

2.1 GAstragals

SD-06 Test Reports

2.4.4 GWind Loading Tests

2.4.4 GWater Leakage Tests

2.4.4 GAcoustical Tests

2.4.4 GAir Infiltration Tests

2.4.4 GPositive Pressure Tests

SD-07 Certificates

2.1 GHollow Metal Sound Retardant

Doors

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

1.3.1.2 GIntumescent Seals,Gasketing and

Door Bottoms

2.1 GThresholds

2.1 GAstragals

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.5 GHardware Schedule

2.3.7 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 63 PAGES

08 71 00 SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1 GKey Bitting

08 81 00 SD-03 Product Data

2.1 GPlastic Glazing

SD-04 Samples

3.2.1 GPlastic Sheet

2.2.1.1 GSealant

SD-07 Certificates

2.1 GPlastic Glazing

SD-08 Manufacturer’s Instructions

2.2 GSetting and Sealing Materials

3.2 GGlass Setting

09 29 00 SD-03 Product Data

2.1.2 GWater-Resistant Gypsum Backing

Board

2.1.5 GAccessories

2.1.1 GGypsum Board

2.1.3 GVOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

2.1.1 GIndoor Air Quality for Gypsum

Board

09 30 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 63 PAGES

09 30 10 3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.2 GUnGlazed Wall Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.6 GTransition Strips

2.4.3 GGrout

SD-07 Certificates

2.4 GIndoor Air Quality for Adhesives

2.4.7 GIndoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.7 GMaintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 51 00 SD-04 Samples

2.1 GAcoustical Units

SD-07 Certificates

2.1.1.1 GIndoor Air Quality for Type IV

Ceiling Tiles

2.5 GIndoor Air Quality for Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 63 PAGES

09 51 00 2.8 GIndoor Air Quality for Sealants

09 65 00 SD-02 Shop Drawings

2.9 GResilient Flooring and

Accessories

SD-03 Product Data

2.9 GResilient Flooring and

Accessories

2.5 GAdhesives

2.1 GLuxury Vinyl Tile

2.2 GStatic Dissipative Vinyl Tile

2.3 GWall Base

SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.9 GResilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 63 PAGES

09 68 00 SD-03 Product Data

2.1 GCarpet

2.3 GIndoor Air Quality for Aerosol

Adhesives

2.3 GIndoor Air Quality for Non-Aerosol

Adhesives

SD-04 Samples

2.1 GCarpet

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

2.1.1 GIndoor Air Quality for Carpet

SD-08 Manufacturer’s Instructions

3.1 GSurface Preparation

SD-10 Operation and Maintenance

Data

3.5 GCleaning and Protection

SD-11 Closeout Submittals

1.6 GWarranty

09 69 13 SD-02 Shop Drawings

2.2.2 GDetailed Installation Drawings

2.2.1 GFabrication Drawings

SD-03 Product Data

2.1 GAccess Flooring System

2.4 GAccess Flooring System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 63 PAGES

09 69 13 2.1.5 GIndoor Air Quality For Pedestal

Adhesive

2.2.7 GIndoor Air Quality For Adhesives

SD-04 Samples

2.2 GFloor Panels

2.2.4 GFloor Covering

2.3 GPanel Support System

2.2.5 GAccessories

2.4 GExposed Step and Ramp

Structure

2.8 GPerforated Directional Air Supply

Panels

2.9 GCut Outs

SD-05 Design Data

2.1.7 GSeismic Calculations

SD-06 Test Reports

2.5 GFactory Tests

2.1.1 GConcentrated Load

2.1.1 GUniform Live Load

2.1.1 GRolling Load

2.1.1 GRolling Load

2.1.1 GImpact Load

2.1.1 GUltimate Load

2.1.3 GStringer Load

2.1.4 GPedestal Axial Load

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 63 PAGES

09 69 13 2.1.5 GBonding Strength of Pedestal

Adhesive

3.2.4 GElectrical Resistance

3.2 GField Tests

SD-07 Certificates

2.1 GCompliance with ICC-ES AC300

2.1 GCompliance with ICC IBC

2.1 GCertificate of Compliance

1.4.1 GQualification of Manufacturer

SD-10 Operation and Maintenance

Data

3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.8 GLifting Device

1.6 GWarranty

09 84 20 SD-02 Shop Drawings

2.2 GApproved Detail Drawings

SD-03 Product Data

3.2 GInstallation

2.2 GAcoustical Wall Panels

SD-04 Samples

2.2 GAcoustical Wall Panels

SD-07 Certificates

2.2 GAcoustical Wall Panels

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 63 PAGES

09 84 20 1.5 GWarranty

09 90 00 SD-02 Shop Drawings

3.9 GPiping Identification

SD-03 Product Data

2.1 GCoating

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.4 GApplicator's Qualifications

1.5.1.2 GQualification Testing

2.1 GIndoor Air Quality for Paints and

Primers

SD-08 Manufacturer’s Instructions

3.2.1 GApplication Instructions

3.5.2 GMixing

1.8.2 GManufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.20 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data

3.1 GInstallation

1.6 GWarranty

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 63 PAGES

10 14 00.20 1.4.1 GInterior Signage

1.3 GSoftware

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1 GFabrication Drawings

3.3 GInstallation Drawings

SD-03 Product Data

2.1 GCleaning and Maintenance

Instructions

2.7 GColors And Finishes

2.2.1 GGalvanized Steel Sheet

2.2.2 GSound-Deadening Cores

2.2.3 GAnchoring Devices and Fasteners

2.2.5 GHardware and Fittings

2.2.4 GBrackets

2.2.6 GDoor Hardware

2.3.1 GToilet Enclosures

2.3.2 GUrinal Screens

2.5 GPilaster Shoes

2.2.5.2 GFinishes

SD-04 Samples

2.7 GColors and Finishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 63 PAGES

10 21 13 2.2.5 GHardware and Fittings

2.2.3 GAnchoring Devices and Fasteners

SD-07 Certificates

1.5 GWarranty

2.3 GIndoor air quality for HDPE

partitions and screens

SD-10 Operation and Maintenance

Data

2.1.1 GPlastic Identification

10 22 19 SD-02 Shop Drawings

3.3 GInstallation

SD-03 Product Data

1.7 GWarranty

2.2 GPartition System

2.2 GPartition System

SD-04 Samples

2.4 GPartition System Samples

SD-07 Certificates

2.1.2 GAcoustical Performance

2.1.3 GStructural Performance

2.3.1.1 GIndoor air quality for aerosol

adhesives

SD-10 Operation and Maintenance

Data

2.3.1 GAssembly Manuals

3.5 GMaintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 63 PAGES

10 26 00 SD-02 Shop Drawings

2.2 GCorner Guards

2.3 GWall Guards (Chair Rail)

SD-03 Product Data

2.2 GCorner Guards

2.3 GWall Guards (Chair Rail)

2.4 GWall Covering/Panels

SD-04 Samples

2.6 GFinish

SD-06 Test Reports

2.2 GCorner Guards

2.3 GWall Guards (Chair Rail)

2.4 GWall Covering/Panels

SD-07 Certificates

2.2 GCorner Guards

2.3Wall Guards (Chair Rail)

2.4 GIndoor air quality for wall

covering/panels

2.7 GIndoor air quality for adhesives

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2 GAccessory Items

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 63 PAGES

10 28 13 2.2 GAccessory Items

10 73 12 SD-02 Shop Drawings

2.1 GCanopy

2.1 GCanopy

3.1 GCanopy

3.1 GCanopy

2.2.3 GSection

2.2.5 GFlashing

SD-03 Product Data

1.4.3 GManufacturer

SD-04 Samples

2.2.5 GColor

SD-07 Certificates

GProfessional Engineer

SD-08 Manufacturer’s Instructions

1.2 GInstallation

12 59 00 SD-03 Product Data

1.6 GWarranty

SD-04 Samples

2.2.1 GWorkstations

SD-06 Test Reports

1.4.2 GFire Safety

1.4.3 GElectrical System

SD-10 Operation and Maintenance

Data

3.2 GMaintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 63 PAGES

12 59 00 3.2 GCleaning

1.7 GMaintenance Agreements

3.1 GInstallation

13 48 00 SD-02 Shop Drawings

3.1 GBracing

3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SD-03 Product Data

3.1 GBracing

2.1 GEquipment Requirements

3.3 GAnchor Bolts

2.1.2 GVibration Isolators

3.4.2 GSnubbers

SD-05 Design Data

1.2.3 GDesign Calculations

SD-06 Test Reports

3.3 GAnchor Bolts

SD-07 Certificates

3.6 GICC ES AC156 Shake Table Test

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.9 GAs-Built Drawings

SD-03 Product Data

1.4.1 GFire Protection Related

Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 63 PAGES

21 13 13.00 10 2.3 GMaterials and Equipment

1.6 GSpare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8 GPreliminary Test Report

3.9 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10 GOperating and Maintenance

Manuals

22 00 00 SD-03 Product Data

2.1 GRecycled Content for Steel Pipe

2.1 GRecycled Content for Cast Iron

Pipe

2.4 GFixtures

2.4.3 GFlush Valve Water Closets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 63 PAGES

22 00 00 2.4.3 GWaterSense Label for Flush

Valve Water Closet

2.4.4 GFlush Valve Urinals

2.4.4 GWaterSense Label for Urinal

2.4.6 GCountertop Lavatories

2.4.1 GWaterSense Label for Lavatory

Faucet

2.4.7 GKitchen Sinks

2.4.8 GDrinking-Water Coolers

2.4.8 GEnergy Star Label for Electric

Water Cooler

2.4.9 GEnergy Star Label for Wheelchair

Electric Water Cooler

3.9.1.1 GBackflow Prevention Assemblies

1.5.1 GWelding

3.4 GVibration-Absorbing Features

SD-06 Test Reports

3.9 GTests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3 GMaterials and Equipment

2.1.1 GBolts

SD-10 Operation and Maintenance

Data

3.9.1 GPlumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 63 PAGES

23 00 00 SD-01 Preconstruction Submittals

3.14.1 GCritical Infrastructure Event (CIE)

3.14.2 GMethod of Procedure (MOP)

SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.9.1.1 GMetallic Flexible Duct

2.9.1.2 GInsulated Nonmetallic Flexible

Duct Runouts

2.9.1.2 GDuct Connectors

2.9.2 GDuct Access Doors

2.9.3 GFire Dampers

2.9.4 GManual Balancing Dampers

2.9.6 GAutomatic Smoke-Fire Dampers

2.9.9 GSound Attenuation Equipment

2.9.9.3 GAcoustical Duct Liner

2.9.10.1 GDiffusers

2.9.10.2 GRegisters and Grilles

2.9.11 GAir Vents, Penthouses, and

Goosenecks

2.10.1.1 GCentrifugal Fans

2.10.1.2 GIn-Line Centrifugal Fans

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 63 PAGES

23 00 00 1.4.5 GTest Procedures

1.2.1.2 GDiagrams

2.9.1 GIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.11 GPerformance Tests

3.9 GDamper Acceptance Test

SD-07 Certificates

1.4.3 GOzone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2 GManufacturer's Installation

Instructions

3.13.2 GOperation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.13.1 GOperation and Maintenance

Manuals

2.9.3 GFire Dampers

2.9.4 GManual Balancing Dampers

2.9.6 GAutomatic Smoke-Fire Dampers

2.10.1.1 GCentrifugal Fans

2.10.1.2 GIn-Line Centrifugal Fans

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 63 PAGES

23 00 00 2.12.2.1 GVariable Volume, Single Duct

Terminal Units

SD-11 Closeout Submittals

3.12 GIndoor Air Quality During

Construction

23 05 15 SD-01 Preconstruction Submittals

1.2 GMaterial, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GConnection Diagrams

1.2 GCoordination Drawings

SD-03 Product Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

2.4 GMiscellaneous Materials

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

3.1 GValve-Operating Tests

3.1 GDrainage Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 63 PAGES

23 05 15 1.4.3 GList of Qualified Permanent

Service Organizations

SD-10 Operation and Maintenance

Data

3.8 GOperation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.6 GIsolators

SD-06 Test Reports

2.4 GType of Isolator

2.4 GType of Base

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 48.19 SD-02 Shop Drawings

3.1 GCoupling and Bracing

3.3 GFlexible Couplings or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF…