Amendment0003.pdf
PDF 21 KB Posted
- Attached to
- Remove Structural Columns JSP Building 2025, ASA Federal contract opportunity
- Solicitation number
- W912PF-16-R-0012
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment18GeotechnicalReport.pdf | ||
| Attachment162025-Pier.pdf | ||
| Attachment122025-Floor_Plan.pdf | ||
| Attachment132025-Foundation_Plan.pdf | ||
| Attachment172025-Roof_Plan.pdf | ||
| Amendment0002.pdf | ||
| Attachment152025-Lighting_system.pdf | ||
| Attachment142025-Frames.pdf | ||
| Attachment10SchedeVal.pdf | ||
| Attachment9PSCPrel.pdf | ||
| Amendment0001.pdf | ||
| Attachment11CostiSic.pdf | ||
| Attachment2TechSpecs.pdf | ||
| Attachment6RequisitiGenerali.pdf | ||
| Solicitation16R0012.pdf | ||
| Attachment8AntimafiaCert.pdf | ||
| Attachment7RequisitiGeneraliBIS.pdf | ||
| Attachment3DesignExperienceQuest.pdf | ||
| Attachment5PastPerformanceQuest.pdf | ||
| Attachment1SOW Att1.pdf | ||
| Attachment4ConstrExperienceQuest.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010853250 AA1 00286-5
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2 for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF-16-R-0012
X 9B. DATED (SEE ITEM 11)
09-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2016
CODE
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
W912PF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PF-16-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
The purpose of this modification is as follows:
a) to provide all prospective contractors with a copy of "Geotechnical Report" consisting of 17 pages dated February 2006;
b) to correct a type error made in the previous Amendment relative to the attachments indicated in Section J. For this reason, the description of Attachment #13 has changed from "Attachment#13 - 2015 - Foundation Plan" to "Attachment #13 - 2025 - Foundation Plan";
c) to revise Section J to include:
- Attachment #18 "Geotechnical Report", and
d) to change the hour and date specified for receipt of Offer from 13 June 2016, 12:00 hrs, to 16 June 2016, 12:00 hrs.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Jun-2016 12:00 PM to 16-Jun-2016 12:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
The following documents are incorporated into the solicitation:
Attachment #1 - Scope of Work/Performance Work Schedule consisting of 11 pages and 4 enclosures dated 06 April 2016 & Attachment #1 titled "Minimum Ammunition Storage Area Safety/Security Requirement consisting of 2 pages Attachment #2 - Technical Specifications consisting of 27 pages Attachment #3 - Design Past Experience Questionnaire consisting of 1 page Attachment #4 - Construction Past Experience Questionnaire consisting of 1 page Attachment #5 - Past Performance Questionnaire consisting of 1 page Attachment #6 - Dichiarazione del possesso dei requisiti generali (Statement of Possession of General Requirements) consisting of 2 pages Attachment #7 - Dichiarazione del possesso dei requisiti generali bis (Statement of Possession of General Requirements - Additional Information) consisting of 1 page Attachment #8 - Antimafia certification
W912PF-16-R-0012
Attachment #9 - "Piano di Sicurezza e Coordinamento Preliminare" consisting of 34 pages dated 13 May 2016 (Review 01) Attachment #10 - "Allegato 01 Schede Valutazione dei rischi" consisting of 93 pages dated 02 May 2016 (Rev 00) Attachment #11 - "Allegato 02 Costi della sicurezza" consisting of 2 pages dated 02 May 2016 (Rev 00) Attachment #12 - "2025 - Floor Plan" Attachment #13 - "2025 - Foundation Plan" Attachment #14 - "2025 - Frames" Attachment #15 - "2025 - Lightning system" Attachment #16 - "2025 - Pier" Attachment #17 - "2025 - Roof Plan" Attachment #18 - "Geotechnical Report" consisting of 17 pages dated February 2006
(End of Summary of Changes)
File details come from the government source that posted it. Updated .