Exhibit_D.pdf

PDF 44 KB Posted

Attached to
Emergency Maintenance Repair
Solicitation number
W912PB-15-R-3010
Issued by

About this file

Exhibit D - Garmisch

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMR - Contract USAG Bavaria Garmisch Basic Year Period 01 January 2016 - 31 December 2016

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D001 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP01; (Item No

GP01AA-GP01AN)

D001AA PM at Fan's; (Item No GP01AA) 245 SV

D001AB PM at Heat Exchangers; (Item No GP01AB) 176 SV

D001AC PM at Cooling Coil; (Item No GP01AC) 36 SV

D001AD PM at Heat Recovery Systems; (Item No GP01AD) 60 SV

D001AE PM at Outside Air Filter; (Item No GP01AE) 212 SV

D001AF PM at Air Filter; (Item No GP01AF) 273 SV

D001AG PM at Steam Humidifier; (Item No GP01AG) 21 SV

D001AH PM at Steam Water (Item No GP01AH) 1 SV

D001AJ PM at Flaps/Volumne Dampers; (Item No GP01AJ) 201 SV

D001AK PM at Control Panels; (Item No GP01AK) 100 SV

D001AL PM at Fire Protection Flaps; (Item No GP01AL) 240 SV

D001AM PM at Air Outlets; (Item No GP01AM) 904 SV

D001AN Performance of PM according to VDI 6022-Inspection; (Item No GP01AN) 76 SV

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D002 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP02; (Item No's GP02AA - GP02AJ)

D002AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No GP02AA) 140 SV

D002AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No GP02AB) 12 SV

D002AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No GP002AC) 12 SV

D002AD Reserved 0 SV

D002AE PM at Water Cooling Units up to 100 KW; (Item No GP02AE) 12 SV

D002AF Reserved 0 SV

D002AG PM at Evaporators; (Item No GP02AG) 404 SV

D002AH PM at Control Panels; (Item No GP02AH) 61 SV

D002AJ Performance of PM according to VDI 6022-Inspection; (Item No GP02AJ) 40 SV

D003 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP03; (Item No's GP03AA and GP03AB

D003AA PM at AC Window Type Unit; (Item No GP03AA) 4 SV

D003AB Performance of PM according to VDI 6022-Inspection; (Item No GP03AB) 1 SV

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D004 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP04; (Item No's GP04AA - GP04AH)

D004AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No GP04AA) 22 SV

D004AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No GP04AB) 6 SV

D004AC Reserved 0 SV

D004AD Reserved 0 SV

D004AE PM at Compressor Units up to 10KW; (Item No GP04AE) 56 SV

D004AF Reserved 0 SV

D004AG PM at Evaporators with single and multible Fans; (Item No GP04AG) 56 SV

D004AH PM at Control Panels; (Item No GP04AH) 14 SV

D005 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP05; (Item No's GP05AA - GP05AH)

D005AA PM at Fans; (Item No GP05AA) 14 SV

D005AB PM at Flaps; (Item No GP02AB) 8 SV

D005AC PM at Ducts up to 0.5 qm cross width; (Item No GP05AC) 44 mtr

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D005AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No GP05AD) 62 mtr

D005AE PM at Grease Filters; (Item No GP05AE) 708 SV

D005AF PM at Ventilation Hoods /Ventilation Covers; Item No GP05AF) 300 sqm

D005AG Reserved 0 SV

D005AH Reserved 0 SV

D006 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP06; (Item No's GP06AA and GP06AB)

D006AA PM at Passive Smoke and Heat Exhaust Systems; (Item No GP06AA) 16 SV

D006AB Reserved 0 SV

D007 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP07; (Item No's GP07AA and GP07AB)

D007AA PM at Cooled Drinking Water Dispensers; (Item No GP07AA) 30 SV

D007AB PM at Cooled Beverage Dispensers; (Item No GP07AB) 10 SV

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D008 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components and Repair Work at Heating Systems at USAG- Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP08; (Item No's GP08AA - GP08AF)

D008AA PM at Gas Leaking Detection Ststems; (Item No GP08AA) 1 SV

D008AB Reserved 0 SV

D008AC Reserved 0 SV

D008AD Reserved 0 SV

D008AE Heating Systems (Pumps, Automated Valves) 0 SV

D008AF Heating Burners (Natural Gas & Fuel) 0 SV

D009 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

Government Estimate D009AA Labeling and inventorying of the approximately 200 each plant/system components at

USAG-Garmisch

60 EA

D010 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

D010AA Hourly-rates for the performance of routine repair work at USAG-Garmisch 480 HRS Government Estimate

D010AB Service call for on-call service for the performance of routine repair work at USAG- Garmisch

150 EA

Descriptions BY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D011 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

D011AA Emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru

16.00 pm

32 HRS

Government Estimate D011AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru 16.00 pm

8 EA

Government Estimate D011AC Hourly-rates for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

32 HRS

Government Estimate D011AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

8 EA

D012 Repair Parts and Handling Fees

D012AA Ordering and delivery of Repair Parts IAW Paragraph 2 Government Estimate 52,000.00 €

D012AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No D012AA Handling Fees: 15 %

52,000.00 € X 15.00% 7,800.00 €

D013 Performance of Preventive Maintenance (PM) and Safety Inspections at Fire Alam Systems IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP09

D013AA Maintenance at different Fire Alam Systems 51 EA

Total

1st Option Year 01 January 2017 - 31 December 2017

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D101 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP01; (Item No

GP01AA-GP01AN)

D101AA PM at Fan's; (Item No GP01AA) 245 SV

D101AB PM at Heat Exchangers; (Item No GP01AB) 176 SV

D101AC PM at Cooling Coil; (Item No GP01AC) 36 SV

D101AD PM at Heat Recovery Systems; (Item No GP01AD) 60 SV

D101AE PM at Outside Air Filter; (Item No GP01AE) 212 SV

D101AF PM at Air Filter; (Item No GP01AF) 273 SV

D101AG PM at Steam Humidifier; (Item No GP01AG) 21 SV

D101AH PM at Steam Water (Item No GP01AH) 1 SV

D101AJ PM at Flaps/Volumne Dampers; (Item No GP01AJ) 201 SV

D101AK PM at Control Panels; (Item No GP01AK) 100 SV

D101AL PM at Fire Protection Flaps; (Item No GP01AL) 240 SV

D101AM PM at Air Outlets; (Item No GP01AM) 904 SV

D101AN Performance of PM according to VDI 6022-Inspection; (Item No GP01AN) 76 SV

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D102 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP02; (Item No's GP02AA - GP02AJ)

D102AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No GP02AA) 140 SV

D102AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No GP02AB) 12 SV

D102AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No GP002AC) 12 SV

D102AD Reserved 0 SV

D102AE PM at Water Cooling Units up to 100 KW; (Item No GP02AE) 12 SV

D102AF Reserved 0 SV

D102AG PM at Evaporators; (Item No GP02AG) 404 SV

D102AH PM at Control Panels; (Item No GP02AH) 61 SV

D102AJ Performance of PM according to VDI 6022-Inspection; (Item No GP02AJ) 40 SV

D103 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP03; (Item No's GP03AA and GP03AB

D103AA PM at AC Window Type Unit; (Item No GP03AA) 4 SV

D103AB Performance of PM according to VDI 6022-Inspection; (Item No GP03AB) 1 SV

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D104 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP04; (Item No's GP04AA - GP04AH)

D104AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No GP04AA) 22 SV

D104AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No GP04AB) 6 SV

D104AC Reserved 0 SV

D104AD Reserved 0 SV

D104AE PM at Compressor Units up to 10KW; (Item No GP04AE) 56 SV

D104AF Reserved 0 SV

D104AG PM at Evaporators with single and multible Fans; (Item No GP04AG) 56 SV

D104AH PM at Control Panels; (Item No GP04AH) 14 SV

D105 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP05; (Item No's GP05AA - GP05AH)

D105AA PM at Fans; (Item No GP05AA) 14 SV

D105AB PM at Flaps; (Item No GP02AB) 8 SV

D105AC PM at Ducts up to 0.5 qm cross width; (Item No GP05AC) 44 mtr

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D105AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No GP05AD) 62 mtr

D105AE PM at Grease Filters; (Item No GP05AE) 708 SV

D105AF PM at Ventilation Hoods /Ventilation Covers; Item No GP05AF) 300 sqm

D105AG Reserved 0 SV

D105AH Reserved 0 SV

D106 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP06; (Item No's GP06AA and GP06AB)

D106AA PM at Passive Smoke and Heat Exhaust Systems; (Item No GP06AA) 16 SV

D106AB Reserved 0 SV

D107 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP07; (Item No's GP07AA and GP07AB)

D107AA PM at Cooled Drinking Water Dispensers; (Item No GP07AA) 30 SV

D107AB PM at Cooled Beverage Dispensers; (Item No GP07AB) 10 SV

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D108 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components and Repair Work at Heating Systems at USAG- Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP08; (Item No's GP08AA - GP08AF)

D108AA PM at Gas Leaking Detection Ststems; (Item No GP08AA) 1 SV

D108AB Reserved 0 SV

D108AC Reserved 0 SV

D108AD Reserved 0 SV

D108AE Heating Systems (Pumps, Automated Valves) 0 SV

D108AF Heating Burners (Natural Gas & Fuel) 0 SV

D109 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

Government Estimate D109AA Labeling and inventorying of the approximately 200 each plant/system components at

USAG-Garmisch

60 EA

D110 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

D110AA Hourly-rates for the performance of routine repair work at USAG-Garmisch 480 HRS Government Estimate

D110AB Service call for on-call service for the performance of routine repair work at USAG- Garmisch

ITEM No DESCRIPTION 1OY Number of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

D111 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

D111AA Emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru

16.00 pm

32 HRS

Government Estimate D111AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru 16.00 pm

8 EA

Government Estimate D111AC Hourly-rates for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

32 HRS

Government Estimate D111AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

8 EA

D112 Repair Parts and Handling Fees

D112AA Ordering and delivery of Repair Parts IAW Paragraph 2 Government Estimate 52,000.00 €

D112AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No D012AA Handling Fees: 15 %

52,000.00 € X 15.00% 7,800.00 €

D113 Performance of Preventive Maintenance (PM) and Safety Inspections at Fire Alam Systems IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP09

D113AA Maintenance at different Fire Alam Systems 51 EA

2nd Option Year 01 January 2018 - 31 December 2018

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D201 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP01; (Item No

GP01AA-GP01AN)

D201AA PM at Fan's; (Item No GP01AA) 245 SV

D201AB PM at Heat Exchangers; (Item No GP01AB) 176 SV

D201AC PM at Cooling Coil; (Item No GP01AC) 36 SV

D201AD PM at Heat Recovery Systems; (Item No GP01AD) 60 SV

D201AE PM at Outside Air Filter; (Item No GP01AE) 212 SV

D201AF PM at Air Filter; (Item No GP01AF) 273 SV

D201AG PM at Steam Humidifier; (Item No GP01AG) 21 SV

D201AH PM at Steam Water (Item No GP01AH) 1 SV

D201AJ PM at Flaps/Volumne Dampers; (Item No GP01AJ) 201 SV

D201AK PM at Control Panels; (Item No GP01AK) 100 SV

D201AL PM at Fire Protection Flaps; (Item No GP01AL) 240 SV

D201AM PM at Air Outlets; (Item No GP01AM) 904 SV

D201AN Performance of PM according to VDI 6022-Inspection; (Item No GP01AN) 76 SV

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D202 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP02; (Item No's GP02AA - GP02AJ)

D202AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No GP02AA) 140 SV

D202AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No GP02AB) 12 SV

D202AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No GP002AC) 12 SV

D202AD Reserved 0 SV

D202AE PM at Water Cooling Units up to 100 KW; (Item No GP02AE) 12 SV

D202AF Reserved 0 SV

D202AG PM at Evaporators; (Item No GP02AG) 404 SV

D202AH PM at Control Panels; (Item No GP02AH) 61 SV

D202AJ Performance of PM according to VDI 6022-Inspection; (Item No GP02AJ) 40 SV

D203 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP03; (Item No's GP03AA and GP03AB

D203AA PM at AC Window Type Unit; (Item No GP03AA) 4 SV

D203AB Performance of PM according to VDI 6022-Inspection; (Item No GP03AB) 1 SV

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D204 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annually Maintenance Schedule determined on Attachment No GP04; (Item No's GP04AA - GP04AH)

D204AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No GP04AA) 22 SV

D204AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No GP04AB) 6 SV

D204AC Reserved 0 SV

D204AD Reserved 0 SV

D204AE PM at Compressor Units up to 10KW; (Item No GP04AE) 56 SV

D204AF Reserved 0 SV

D204AG PM at Evaporators with single and multible Fans; (Item No GP04AG) 56 SV

D204AH PM at Control Panels; (Item No GP04AH) 14 SV

D205 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP05; (Item No's GP05AA - GP05AH)

D205AA PM at Fans; (Item No GP05AA) 14 SV

D205AB PM at Flaps; (Item No GP02AB) 8 SV

D205AC PM at Ducts up to 0.5 qm cross width; (Item No GP05AC) 44 mtr

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D205AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No GP05AD) 62 mtr

D205AE PM at Grease Filters; (Item No GP05AE) 708 SV

D205AF PM at Ventilation Hoods /Ventilation Covers; Item No GP05AF) 300 sqm

D205AG Reserved 0 SV

D205AH Reserved 0 SV

D206 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP06; (Item No's GP06AA and GP06AB)

D206AA PM at Passive Smoke and Heat Exhaust Systems; (Item No GP06AA) 16 SV

D206AB Reserved 0 SV

D207 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP07; (Item No's GP07AA and GP07AB)

D207AA PM at Cooled Drinking Water Dispensers; (Item No GP07AA) 30 SV

D207AB PM at Cooled Beverage Dispensers; (Item No GP07AB) 10 SV

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D208 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components and Repair Work at Heating Systems at USAG- Garmisch IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP08; (Item No's GP08AA - GP08AF)

D208AA PM at Gas Leaking Detection Ststems; (Item No GP08AA) 1 SV

D208AB Reserved 0 SV

D208AC Reserved 0 SV

D208AD Reserved 0 SV

D208AE Heating Systems (Pumps, Automated Valves) 0 SV

D208AF Heating Burners (Natural Gas & Fuel) 0 SV

D209 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

Government Estimate D209AA Labeling and inventorying of the approximately 200 each plant/system components at

USAG-Garmisch

60 EA

D210 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

D210AA Hourly-rates for the performance of routine repair work at USAG-Garmisch 480 HRS Government Estimate

D210AB Service call for on-call service for the performance of routine repair work at USAG- Garmisch

ITEM No DESCRIPTION 2nd OY Number of Maintenance Cycles 2nd half

Unit UNIT

PRICE

TOTAL

AMOUNT

D211 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

D211AA Emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru

16.00 pm

32 HRS

Government Estimate D211AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch during regular duty hours 08.00am thru 16.00 pm

8 EA

Government Estimate D211AC Hourly-rates for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

32 HRS

Government Estimate D211AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Garmisch after regular duty hours 16.00pm thru 08.00am

8 EA

D212 Repair Parts and Handling Fees

D212AA Ordering and delivery of Repair Parts IAW Paragraph 2 Government Estimate 52,000.00 €

D212AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No D012AA Handling Fees: 15 %

52,000.00 € X 15.00% 7,800.00 €

D213 Performance of Preventive Maintenance (PM) and Safety Inspections at Fire Alam Systems IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No GP09

D213AA Maintenance at different Fire Alam Systems 51 EA

Exhibits D Garmisch Basic Year
Exhibits D Garmisch Option 1
Exhibits D Garmisch Option 2

File details come from the government source that posted it. Updated .