Exhibit_A.pdf

PDF 40 KB Posted

Attached to
Emergency Maintenance Repair
Solicitation number
W912PB-15-R-3010
Issued by

About this file

Exhibit A - Tower Baracks

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMR- Contract USAG Bavaria Tower Barracks 1st Option Year 01 January 2017 - 31 December 2017

ITEM No DESCRIPTION First Option Year No of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

A101 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G001; (Item No G001AA-G001AN)

A101AA PM at Fan's; (Item No G001AA) 826 SV

A101AB PM at Heat Exchangers; (Item No G001AB) 692 SV

A101AC PM at Cooling Coil; (Item No G0001AC) 96 SV

A101AD PM at Heat Recovery Systems; (Item No G001AD) 340 SV

A101AE PM at Outside Air Filter; (Item No G001AE) 507 SV

A101AF PM at Air Filter; (Item No G0001AF) 716 SV

A101AG PM at Steam Humidifier; (Item No G001AG) 76 SV

A101AH Reserved 0 SV

A101AJ PM at Flaps/Volumne Dampers; (Item No G001AJ) 583 SV

A101AK PM at Control Panels; (Item No G001AK) 312 SV

A101AL PM at Fire Protection Flaps; (Item No G001AL) 328 SV

A101AM PM at Air Outlets; (Item No G001AM) 3962 SV

A101AN Performance of PM according to VDI 6022-Inspection; (Item No G001AN) 193 SV

A102 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G002; (Item No's G002AA - G002AJ

A102AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No G002AA) 1284 SV

A102AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No G002AB) 420 SV

A102AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No G002AC) 108 SV

A102AD PM at Air Conditioning Compressor Units above 100KW; (Item No G002AD) 124 SV

A102AE PM at Water Cooling Units up to 100 KW; (Item No G002AE) 56 SV

A102AF PM at Water Cooling Units above 100 KW; (Item No G002AF) 84 SV

A102AG PM at Evaporators; (Item No G002AG) 2572 SV

A102AH PM at Control Panels; (Item No G002AH) 554 SV

A102AJ Performance of PM according to VDI 6022-Inspection; (Item No G002AJ) 600 SV

A103 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G003; (Item No's G003AA and G003AB

A103AA PM at AC Window Type Unit; (Item No G003AA) 76 SV

A103AB Performance of PM according to VDI 6022-Inspection; (Item No G003AB) 19 SV

A104 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G004; (Item No's G004AA - G004AH)

A104AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No G004AA) 42 SV

A104AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No G004AB) 12 SV

A104AC PM at Walk-In Refrigerator Cells from1201 - 4000 Cubic Feet; (Item No G004AC) 18 SV

A104AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No G004AD) 8 SV

A104AE PM at Compressor Units up to 10KW; (Item No G004AE) 136 SV

A104AF Reserved 0

A104AG PM at Evaporators with single and multible Fans; (Item No G004AG) 168 SV

A104AH PM at Control Panels; (Item No G004AH) 34 SV

A105 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G005; (Item No's G005AA - G005AH)

A105AA PM at Fans; (Item No G005AA) 154 SV

A105AB PM at Flaps; (Item No G005AB) 30 SV

A105AC PM at Ducts up to 0.5 qm cross width; (Item No G005AC) 953 mtr

A105AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No G005AD) 506 mtr

A105AE PM at Grease Filters; (Item No G005AE) 1304 SV

A105AF PM at Ventilation Hoods /Ventilation Covers; Item No G005AF) 1833 sqm

A105AG PM at Heat Recovery Systems; (Item No G005AG) 13 SV

A105AH Reserved 0 SV

A106 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G006; (Item No's G006AA and G006AB)

A106AA PM at Roof Systems; (Item No G006AA) 311 SV

A106AB PM at Window Systems; (Item No G006AB) 2 SV

A107 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G007; (Item No's G007AA and G007AB)

A107AA PM at Cooled Drinking Water Dispensers; (Item No G007AA) 22 SV

A107AB Reserved 0 SV

A108 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G008; (Item No's G008AA - G008AD)

A108AA PM at Gas Leaking Detection Ststems; (Item No G008AA) 30 SV

A108AB PM at Special Cooling Equipment, TISA Bldg 295; (Item No G008AB) 4 SV

A108AC Reserved 0 SV

A108AD Reserved 0 SV

A108AH Propan Gas Tank; 2ton Above Ground (Attachment G008AH) 1 SV

A109 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

A109AA Labeling and inventorying of the approximately 200 each plant/system components at USAG-Grafenwoehr

160 EA

A110 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

A110AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr 1680 HRS Government Estimate

A110AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr

400 EA

A111 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

A111AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

40 HRS

Government Estimate A111AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

20 EA

Government Estimate A111AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

80 HRS

Government Estimate A111AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

25 EA

A112 Repair Parts and Handling Fees

A112AA Repair Parts IAW Paragraph 2 Government Estimate LS 98,000.00

A112AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No A012AA Handling Fee: 15 %

98,000.00 € X 15.00% 14,700.00

Basic Year 01 January 2016 - 31 December 2016

ITEM No DESCRIPTION Basic Year No of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

A001 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G001; (Item No G001AA-G001AN)

A001AA PM at Fan's; (Item No G001AA) 826 SV

A001AB PM at Heat Exchangers; (Item No G001AB) 692 SV

A001AC PM at Cooling Coil; (Item No G0001AC) 96 SV

A001AD PM at Heat Recovery Systems; (Item No G001AD) 340 SV

A001AE PM at Outside Air Filter; (Item No G001AE) 507 SV

A001AF PM at Air Filter; (Item No G0001AF) 716 SV

A001AG PM at Steam Humidifier; (Item No G001AG) 76 SV

A001AH Reserved 0 SV

A001AJ PM at Flaps/Volumne Dampers; (Item No G001AJ) 583 SV

A001AK PM at Control Panels; (Item No G001AK) 312 SV

A001AL PM at Fire Protection Flaps; (Item No G001AL) 328 SV

A001AM PM at Air Outlets; (Item No G001AM) 3962 SV

A001AN Performance of PM according to VDI 6022-Inspection; (Item No G001AN) 193 SV

A002 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G002; (Item No's G002AA - G002AJ

A002AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No G002AA) 1284 SV

A002AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No G002AB) 420 SV

A002AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No G002AC) 108 SV

A002AD PM at Air Conditioning Compressor Units above 100KW; (Item No G002AD) 124 SV

A002AE PM at Water Cooling Units up to 100 KW; (Item No G002AE) 56 SV

A002AF PM at Water Cooling Units above 100 KW; (Item No G002AF) 84 SV

A002AG PM at Evaporators; (Item No G002AG) 2572 SV

A002AH PM at Control Panels; (Item No G002AH) 554 SV

A002AJ Performance of PM according to VDI 6022-Inspection; (Item No G002AJ) 600 SV

A003 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G003; (Item No's G003AA and G003AB

A003AA PM at AC Window Type Unit; (Item No G003AA) 76 SV

A003AB Performance of PM according to VDI 6022-Inspection; (Item No G003AB) 19 SV

A004 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G004; (Item No's G004AA - G004AH)

A004AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No G004AA) 42 SV

A004AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No G004AB) 12 SV

A004AC PM at Walk-In Refrigerator Cells from1201 - 4000 Cubic Feet; (Item No G004AC) 18 SV

A004AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No G004AD) 8 SV

A004AE PM at Compressor Units up to 10KW; (Item No G004AE) 136 SV

A004AF Reserved 0

A004AG PM at Evaporators with single and multible Fans; (Item No G004AG) 168 SV

A004AH PM at Control Panels; (Item No G004AH) 34 SV

A005 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G005; (Item No's G005AA - G005AH)

A005AA PM at Fans; (Item No G005AA) 154 SV

A005AB PM at Flaps; (Item No G005AB) 30 SV

A005AC PM at Ducts up to 0.5 qm cross width; (Item No G005AC) 953 mtr

A005AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No G005AD) 506 mtr

A005AE PM at Grease Filters; (Item No G005AE) 1304 SV

A005AF PM at Ventilation Hoods /Ventilation Covers; Item No G005AF) 1833 sqm

A005AG PM at Heat Recovery Systems; (Item No G005AG) 13 SV

A005AH Reserved 0 SV

A006 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G006; (Item No's G006AA and G006AB)

A006AA PM at Roof Systems; (Item No G006AA) 311 SV

A006AB PM at Window Systems; (Item No G006AB) 2 SV

A007 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G007; (Item No's G007AA and G007AB)

A007AA PM at Cooled Drinking Water Dispensers; (Item No G007AA) 22 SV

A007AB Reserved 0 SV

A008 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G008; (Item No's G008AA - G008AD)

A008AA PM at Gas Leaking Detection Ststems; (Item No G008AA) 30 SV

A008AB PM at Special Cooling Equipment, TISA Bldg 295; (Item No G008AB) 4 SV

A008AC Reserved 0 SV

A008AD Reserved 0 SV

A008AH Propane Gas Tank; 2ton Above Ground; (Attachment G008AH) 1 SV

A009 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

A009AA Labeling and inventorying of the approximately 200 each plant/system components at USAG-Grafenwoehr

200 EA

A010 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

A010AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr 1680 HRS Government Estimate

A010AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr

400 EA

A011 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

A011AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

40 HRS

Government Estimate A011AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

20 EA

Government Estimate A011AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

80 HRS

Government Estimate A011AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

A012 Repair Parts and Handling Fees

A012AA Repair Parts IAW Paragraph 2 Government Estimate LS 98,000.00

A012AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No A012AA Handling Fee: 15 %

98,000.00 € X 15.00% 14,700.00

2nd Option Year 01 January 2018 - 31 December 2018

ITEM No DESCRIPTION Second Option Year No of Maintenance Cycles

Unit UNIT

PRICE

TOTAL

AMOUNT

A201 Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G001; (Item No G001AA-G001AN)

A201AA PM at Fan's; (Item No G001AA) 826 SV

A201AB PM at Heat Exchangers; (Item No G001AB) 692 SV

A201AC PM at Cooling Coil; (Item No G0001AC) 96 SV

A201AD PM at Heat Recovery Systems; (Item No G001AD) 340 SV

A201AE PM at Outside Air Filter; (Item No G001AE) 507 SV

A201AF PM at Air Filter; (Item No G0001AF) 716 SV

A201AG PM at Steam Humidifier; (Item No G001AG) 76 SV

A201AH Reserved 0 SV

A201AJ PM at Flaps/Volumne Dampers; (Item No G001AJ) 583 SV

A201AK PM at Control Panels; (Item No G001AK) 312 SV

A201AL PM at Fire Protection Flaps; (Item No G001AL) 328 SV

A201AM PM at Air Outlets; (Item No G001AM) 3962 SV

A201AN Performance of PM according to VDI 6022-Inspection; (Item No G001AN) 193 SV

A202 Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G002; (Item No's G002AA - G002AJ

A202AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No G002AA) 1284 SV

A202AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No G002AB) 420 SV

A202AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No G002AC) 108 SV

A202AD PM at Air Conditioning Compressor Units above 100KW; (Item No G002AD) 124 SV

A202AE PM at Water Cooling Units up to 100 KW; (Item No G002AE) 56 SV

A202AF PM at Water Cooling Units above 100 KW; (Item No G002AF) 84 SV

A202AG PM at Evaporators; (Item No G002AG) 2572 SV

A202AH PM at Control Panels; (Item No G002AH) 554 SV

A202AJ Performance of PM according to VDI 6022-Inspection; (Item No G002AJ) 600 SV

A203 Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G003; (Item No's G003AA and G003AB

A203AA PM at AC Window Type Unit; (Item No G003AA) 76 SV

A203AB Performance of PM according to VDI 6022-Inspection; (Item No G003AB) 19 SV

A204 Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G004; (Item No's G004AA - G004AH)

A204AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No G004AA) 42 SV

A204AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No G004AB) 12 SV

A204AC PM at Walk-In Refrigerator Cells from1201 - 4000 Cubic Feet; (Item No G004AC) 18 SV

A204AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No G004AD) 8 SV

A204AE PM at Compressor Units up to 10KW; (Item No G004AE) 136 SV

A204AF Reserved 0

A204AG PM at Evaporators with single and multible Fans; (Item No G004AG) 168 SV

A204AH PM at Control Panels; (Item No G004AH) 34 SV

A205 Performance of Preventive Maintenance (PM) at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G005; (Item No's G005AA - G005AH)

A205AA PM at Fans; (Item No G005AA) 154 SV

A205AB PM at Flaps; (Item No G005AB) 30 SV

A205AC PM at Ducts up to 0.5 qm cross width; (Item No G005AC) 953 mtr

A205AD PM at Ducts from 0,5 qm to 2,0 qm cross width; (Item No G005AD) 506 mtr

A205AE PM at Grease Filters; (Item No G005AE) 1304 SV

A205AF PM at Ventilation Hoods /Ventilation Covers; Item No G005AF) 1833 sqm

A205AG PM at Heat Recovery Systems; (Item No G005AG) 13 SV

A205AH Reserved 0 SV

A206 Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G006; (Item No's G006AA and G006AB)

A206AA PM at Roof Systems; (Item No G006AA) 311 SV

A206AB PM at Window Systems; (Item No G006AB) 2 SV

A207 Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G007; (Item No's G007AA and G007AB)

A207AA PM at Cooled Drinking Water Dispensers; (Item No G007AA) 22 SV

A207AB Reserved 0 SV

A208 Performance of Preventive Maintenance (PM) at Gas Leaking Detection Systems including all system components at USAG-Grafenwoehr IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No G008; (Item No's G008AA - G008AD)

A208AA PM at Gas Leaking Detection Ststems; (Item No G008AA) 30 SV

A208AB PM at Special Cooling Equipment, TISA Bldg 295; (Item No G008AB) 4 SV

A208AC Reserved 0 SV

A208AD Reserved 0 SV

A208AH Propan Gas Tank; 2to Above Ground; (Attachment No G008AH) 1 SV

A209 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.

A209AA Labeling and inventorying of the approximately 200 each plant/system components at USAG-Grafenwoehr

160 EA

A210 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate

A210AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr 1680 HRS Government Estimate

A210AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr

400 EA

A211 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate

A211AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

40 HRS

Government Estimate A211AB Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr during regular duty hours 08.00am thru 16.00 pm

20 EA

Government Estimate A211AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

80 HRS

Government Estimate A211AD Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr after regular duty hours 16.00pm thru 08.00am

A212 Repair Parts and Handling Fees

A212AA Repair Parts IAW Paragraph 2 Government Estimate LS 98,000.00 €

A212AB Contractor handling fees for the total Gov. Estimated Amount for repair parts settled with Item No A012AA Handling Fee: 15 %

98,000.00 € X 15.00% 14,700.00 €

Exhibits A Tower Barracks Option 1
Exhibits A Tower Barracks Basic Year
Exhibits A Tower Barracks Option 2

File details come from the government source that posted it. Updated .