Exhibit_B.pdf
PDF 47 KB Posted
- Attached to
- Emergency Maintenance Repair
- Solicitation number
- W912PB-15-R-3010
About this file
Exhibit B - Rose Baracks
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMR- Contract USAG Bavaria Rose Barracks Basic Year 01 January 2016 - 31 December 2016
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B001
Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V001; (Item No's V001AA-V001AN)
B001AA PM at Fan's; (Item No V001AA) 906.00 SV
B001AB PM at Heat Exchangers; (Item No V001AB) 490.00 SV
B001AC PM at Cooling Coil; (Item No V001AC) 14.00 SV
B001AD PM at Heat Recovery Systems; (Item No V001AD) 29.00 SV
B001AE PM at Outside Air Filter; (Item No V001AE) 825.00 SV
B001AF PM at Air Filter; (Item No V001AF) 557.00 SV
B001AG PM at Humidifier Steam; (Item No V001AG) 20.00 SV
B001AH PM at Humidifier Water; (Item No V001AH) 16.00 SV
B001AJ PM at Flaps/Volume Dampers; (Item No V001AJ) 634.00 SV
B001AK PM at Control Panels; (Item No V001AK) 818.00 SV
B001AL PM at Fire Protection Flaps; (Item No V001AL) 841.00 SV
B001AM PM at Air Outlets; (Item No V001AM) 3,396.00 SV
B001AN PM at Ventilation Systems according to VDI 6022; (Item No V001AN) 124.00 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B002
Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V002; (Item No's V002AA-V002AJ)
B002AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No V002AA) 338.00 SV
B002AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No V002AB) 54.00 SV
B002AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No V002AC) 24.00 SV
B002AD Reserved 0.00 SV
B002AE PM at Water Cooling Units up to 100 KW; (Item No V002AE) 12.00 SV
B002AF Reserved 0.00 SV
B002AG PM at Evaporators; (Item No V002AG) 618.00 SV
B002AH PM at Control Panels; (Item No V002AH) 164.00 SV
B002AJ Performance of PM according to VDI 6022-Inspection; (Item No V002AJ) 103.00 SV
B003
Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V003; (Item No's V003AA-V003AB)
B003AA PM at AC Window Type Unit; (Item No V003AA) 20.00 SV
B003AB Performance of PM according to VDI 6022-Inspection; (Item No V003AB) 7.00 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B004
Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V004; (Item No's V004AA-
V004AH)
B004AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No V004AA) 56.00 SV
B004AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No V004AB) 30.00 SV
B004AC Reserved 0.00 SV
B004AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No V004AD) 8.00 SV
B004AE PM at Compressor Units up to 10KW; (Item No V004AE) 90.00 SV
B004AF PM at Compressor Units over 10KW; (Item No V004AF) 4.00 SV
B004AG PM at Evaporators with single and multible Fans; (Item No V004AG) 98.00 SV
B004AH PM at Control Panels; (Item No V004AH) 26.00 SV
B005
Performance of Cleaning at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V005; (Item No's V005AA-V005AH)
B005AA Cleaning of Fans; (Item No V005AA) 94.00 SV
B005AB Cleaning of Flaps; (Item No V005AB) 0.00 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B005AC Cleaning of Ducts in Meter up to 0.5 qm cross width; (Item No V005AC) 184.00 mtr
B005AD Cleaning of Ducts in Meter up to 0.5 to 2.0 qm cross width; (Item No V005AD) 341.00 mtr
B005AE Grease Filters Service; (Item No V005AE) 7,410.00 SV
B005AF Cleaning of Hoods in Square Meters; Item No V005AF) 768.00 sqm
B005AG Cleaning of Heat Recovery Systems; (Item No V005AG) 2.00 SV
B005AH Cleaning of Fire Protection Flaps; (Item No V005AH) 12.00 SV
B206
Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V006; (Item No V006AA-V006AB)
B206AA PM at Passive Smoke and Heat Exhaust System; (Item No V006AA) 133.00 SV
B206AB PM at Mechanical Smoke and Heat Exhaust System; (Item No V006AB) 41.00 SV
B007
Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V007; (Item No V007AA+V007AB)
B007AA PM at Cooled Drinking Water Dispensers; (Item No V007AA) 77.00 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B007AB PM at Cooling Dispenser Beverage; (Item No V007AB) € 4.00 SV
B008
Performance of Preventive Maintenance (PM) at Other Special Equipment including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V008; (Item No's V008AA-V008AD)
B008AA PM at Gas Leak Detection System (Item No V008AA) 3.00 SV
B008AB Reserved 0.00 SV
B008AC Reserved 0.00 SV
B008AD Reserved 0.00 SV
B008AE PM at Heating Systems (Pumps, Valves, Pressure Maintenance) (Item No V008AE) 15.00 SV
B008AF PM at Heating Burners up to 100KW (CNG, LPG & Fuel) (Item No V008AF) 12.00 SV
B008AG PM at Sensor Systems Sewage Treatment Vilseck (Item No V008AG) 2.00 SV
B008AH PM at Propane gas Tank (Underground and above Ground) (Item No V008AH) 9.00 SV
B008AI PM at Heating Burners above 100KW (CNG, LPG & Fuel) (Item No V008AI) 4.00 SV
B009 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.
B009AA Labeling and inventorying of the approximately 50 each plant/system components at USAG-Grafenwoehr, Rose Barracks Vilseck 100.00 EA
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B010 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate
B010AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr, Rose Barracks Vilseck 1,050.00 HRS
Government Estimate
B010AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr, Rose Barracks Vilseck 250.00 EA
B011 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate
B011AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru 16.00 pm 30.00 HRS
Government Estimate
B011AB
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru
16.00 pm
15.00 EA
Government Estimate
B011AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am 25.00 HRS
Government Estimate
B011AD
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am
13.00 EA
B012 Repair Parts and Handling Fees
B012AA Repair Parts IAW Paragraph 2 Government Estimate LS 80,000.00
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B012AB
Contractor Material Handling Fee for the total Gov. Estimated Amount for repair parts settled with ELIN No B212AA Material Handling Fee: 15 %
80,000.00 X 15.00% 12,000.00
Total Amount:
1st Option Year 01 January 2017 - 31 December 2017
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B101
Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V001; (Item No's V001AA-V001AN)
B101AA PM at Fan's; (Item No V001AA) 906 SV
B101AB PM at Heat Exchangers; (Item No V001AB) 490 SV
B101AC PM at Cooling Coil; (Item No V001AC) 14 SV
B101AD PM at Heat Recovery Systems; (Item No V001AD) 29 SV
B101AE PM at Outside Air Filter; (Item No V001AE) 825 SV
B101AF PM at Air Filter; (Item No V001AF) 557 SV
B101AG PM at Humidifier Steam; (Item No V001AG) 20 SV
B101AH PM at Humidifier Water; (Item No V001AH) 16 SV
B101AJ PM at Flaps/Volume Dampers; (Item No V001AJ) 634 SV
B101AK PM at Control Panels; (Item No V001AK) 818 SV
B101AL PM at Fire Protection Flaps; (Item No V001AL) 841 SV
B101AM PM at Air Outlets; (Item No V001AM) 3396 SV
B101AN PM at Ventilation Systems according to VDI 6022; (Item No V001AN) 124 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B102
Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V002; (Item No's V002AA-V002AJ)
B102AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No V002AA) 338 SV
B102AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No V002AB) 54 SV
B102AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No V002AC) 24 SV
B102AD Reserved 0 SV
B102AE PM at Water Cooling Units up to 100 KW; (Item No V002AE) 12 SV
B102AF Reserved 0 SV
B102AG PM at Evaporators; (Item No V002AG) 618 SV
B102AH PM at Control Panels; (Item No V002AH) 164 SV
B102AJ Performance of PM according to VDI 6022-Inspection; (Item No V002AJ) 103 SV
B103
Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V003; (Item No's V003AA-V003AB)
B103AA PM at AC Window Type Unit; (Item No V003AA) 20 SV
B103AB Performance of PM according to VDI 6022-Inspection; (Item No V003AB) 7 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B104
Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V004; (Item No's V004AA-
V004AH)
B104AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No V004AA) 56 SV
B104AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No V004AB) 30 SV
B104AC Reserved 0 SV
B104AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No V004AD) 8 SV
B104AE PM at Compressor Units up to 10KW; (Item No V004AE) 90 SV
B104AF PM at Compressor Units over 10KW; (Item No V004AF) 4 SV
B104AG PM at Evaporators with single and multible Fans; (Item No V004AG) 98 SV
B104AH PM at Control Panels; (Item No V004AH) 26 SV
B105
Performance of Cleaning at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V005; (Item No's V005AA-V005AH)
B105AA Cleaning of Fans; (Item No V005AA) 94 SV
B105AB Cleaning of Flaps; (Item No V005AB) 0 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B105AC Cleaning of Ducts in Meter up to 0.5 qm cross width; (Item No V005AC) 184 mtr 0.00 €
B105AD Cleaning of Ducts in Meter up to 0.5 to 2.0 qm cross width; (Item No V005AD) 341 mtr
B105AE Grease Filters Service; (Item No V005AE) 7410 SV
B105AF Cleaning of Hoods in Square Meters; Item No V005AF) 768 sqm
B105AG Cleaning of Heat Recovery Systems; (Item No V005AG) 2 SV
B105AH Cleaning of Fire Protection Flaps; (Item No V005AH) 12 SV
B106
Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V006; (Item No V006AA-V006AB)
B106AA PM at Passive Smoke and Heat Exhaust System; (Item No V006AA) 133 SV
B106AB PM at Mechanical Smoke and Heat Exhaust System; (Item No V006AB) 41 SV
B107
Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V007; (Item No V007AA+V007AB)
B107AA PM at Cooled Drinking Water Dispensers; (Item No V007AA) 77 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B107AB PM at Cooling Dispenser Beverage; (Item No V007AB) 4 SV
B108
Performance of Preventive Maintenance (PM) at Other Special Equipment including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V008; (Item No's V008AA-V008AD)
B108AA PM at Gas Leak Detection System (Item No V008AA) 3 SV
B108AB Reserved 0 SV
B108AC Reserved 0 SV
B108AD Reserved 0 SV
B108AE PM at Heating Systems (Pumps, Valves, Pressure Maintenance) (Item No V008AE) 15 SV
B108AF PM at Heating Burners up to 100KW (CNG, LPG & Fuel) (Item No V008AF) 12 SV
B108AG PM at Sensor Systems Sewage Treatment Vilseck (Item No V008AG) 2 SV
B108AH PM at Propane gas Tank (Underground and above Ground) (Item No V008AH) 9 SV
B108AI PM at Heating Burners above 100KW (CNG, LPG & Fuel) (Item No V008AI) 4 SV
B109 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.
B109AA Labeling and inventorying of the approximately 50 each plant/system components at USAG-Grafenwoehr, Rose Barracks Vilseck 100 EA
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B110 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate
B110AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr, Rose Barracks Vilseck 1050 HRS
Government Estimate
B110AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr, Rose Barracks Vilseck 250 EA
B111 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate
B111AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru 16.00 pm 30 HRS
Government Estimate
B111AB
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru
16.00 pm
15 EA
Government Estimate
B111AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am 25 HRS
Government Estimate
B111AD
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am
13 EA
B012 Repair Parts and Handling Fees
B112AA Repair Parts IAW Paragraph 2 Government Estimate LS 80,000.00
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B112AB
Contractor Material Handling Fee for the total Gov. Estimated Amount for repair parts settled with ELIN No B212AA Material Handling Fee: 15 %
80,000.00 X 15.00% 12,000.00
2nd Option Year 01 January 2018 - 31 December 2018
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B001
Performance of Preventive Maintenance (PM) at Ventilation Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V001; (Item No's V001AA-V001AN)
B001AA PM at Fan's; (Item No V001AA) 906 SV
B001AB PM at Heat Exchangers; (Item No V001AB) 490 SV
B001AC PM at Cooling Coil; (Item No V001AC) 14 SV
B001AD PM at Heat Recovery Systems; (Item No V001AD) 29 SV
B001AE PM at Outside Air Filter; (Item No V001AE) 825 SV
B001AF PM at Air Filter; (Item No V001AF) 557 SV
B001AG PM at Humidifier Steam; (Item No V001AG) 20 SV
B001AH PM at Humidifier Water; (Item No V001AH) 16 SV
B001AJ PM at Flaps/Volume Dampers; (Item No V001AJ) 634 SV
B001AK PM at Control Panels; (Item No V001AK) 818 SV
B001AL PM at Fire Protection Flaps; (Item No V001AL) 841 SV
B001AM PM at Air Outlets; (Item No V001AM) 3396 SV
B001AN PM at Ventilation Systems according to VDI 6022; (Item No V001AN) 124 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B002
Performance of Preventive Maintenance (PM) at Air Conditioning Split Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V002; (Item No's V002AA-V002AJ)
B002AA PM at Air Conditioning Compressor Units up to 20 KW; (Item No V002AA) 338 SV
B002AB PM at Air Conditioning Compressor Units from 20 KW to 50KW; (Item No V002AB) 54 SV
B002AC PM at Air Conditioning Compressor Units from 50 KW to 100KW; (Item No V002AC) 24 SV
B002AD Reserved 0 SV
B002AE PM at Water Cooling Units up to 100 KW; (Item No V002AE) 12 SV
B002AF Reserved 0 SV
B002AG PM at Evaporators; (Item No V002AG) 618 SV
B002AH PM at Control Panels; (Item No V002AH) 164 SV
B002AJ Performance of PM according to VDI 6022-Inspection; (Item No V002AJ) 103 SV
B003
Performance of Preventive Maintenance (PM) at Air Conditioning Window Type Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V003; (Item No's V003AA-V003AB)
B003AA PM at AC Window Type Unit; (Item No V003AA) 20 SV
B003AB Performance of PM according to VDI 6022-Inspection; (Item No V003AB) 7 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B004
Performance of Preventive Maintenance (PM) at Refrigerator and Freezer Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V004; (Item No's V004AA-
V004AH)
B004AA PM at Walk-In Refrigerator Cells up to 1200 Cubic Feet; (Item No V004AA) 56 SV
B004AB PM at Walk-In Freezer Cells up to 1200 Cubic Feet; (Item No V004AB) 30 SV
B004AC Reserved 0 SV
B004AD PM at Walk-In Freezeer Cells from1201 - 4000 Cubic Feet; (Item No V004AD) 8 SV
B004AE PM at Compressor Units up to 10KW; (Item No V004AE) 90 SV
B004AF PM at Compressor Units over 10KW; (Item No V004AF) 4 SV
B004AG PM at Evaporators with single and multible Fans; (Item No V004AG) 98 SV
B004AH PM at Control Panels; (Item No V004AH) 26 SV
B005
Performance of Cleaning at Kitchen Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V005; (Item No's V005AA-V005AH)
B005AA Cleaning of Fans; (Item No V005AA) 94 SV
B005AB Cleaning of Flaps; (Item No V005AB) 0 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B005AC Cleaning of Ducts in Meter up to 0.5 qm cross width; (Item No V005AC) 184 mtr
B005AD Cleaning of Ducts in Meter up to 0.5 to 2.0 qm cross width; (Item No V005AD) 341 mtr
B005AE Grease Filters Service; (Item No V005AE) 7410 SV
B005AF Cleaning of Hoods in Square Meters; Item No V005AF) 768 sqm
B005AG Cleaning of Heat Recovery Systems; (Item No V005AG) 2 SV
B005AH Cleaning of Fire Protection Flaps; (Item No V005AH) 12 SV
B206
Performance of Preventive Maintenance (PM) at Smoke Exhaust Systems including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V006; (Item No V006AA-V006AB)
B206AA PM at Passive Smoke and Heat Exhaust System; (Item No V006AA) 133 SV
B206AB PM at Mechanical Smoke and Heat Exhaust System; (Item No V006AB) 41 SV
B007
Performance of Preventive Maintenance (PM) at Drinking Fountains including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V007; (Item No V007AA+V007AB)
B007AA PM at Cooled Drinking Water Dispensers; (Item No V007AA) 77 SV
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B007AB PM at Cooling Dispenser Beverage; (Item No V007AB) 4 SV
B008
Performance of Preventive Maintenance (PM) at Other Special Equipment including all system components at USAG-Grafenwoehr, Rose Barracks Vilseck IAW the Performance Work Statement and the Annual Maintenance Schedule determined on Attachment No V008; (Item No's V008AA-V008AD)
B008AA PM at Gas Leak Detection System (Item No V008AA) 3 SV
B008AB Reserved 0 SV
B008AC Reserved 0 SV
B008AD Reserved 0 SV
B008AE PM at Heating Systems (Pumps, Valves, Pressure Maintenance) (Item No V008AE) 15 SV
B008AF PM at Heating Burners up to 100KW (CNG, LPG & Fuel) (Item No V008AF) 12 SV
B008AG PM at Sensor Systems Sewage Treatment Vilseck (Item No V008AG) 2 SV
B008AH PM at Propane gas Tank (Underground and above Ground) (Item No V008AH) 9 SV
B008AI PM at Heating Burners above 100KW (CNG, LPG & Fuel) (Item No V008AI) 4 SV
B009 Labeling and Inventorying of Equipment IAW the Performance Work Statement Paragraph 2.3 thru 2.3.4.
B009AA Labeling and inventorying of the approximately 50 each plant/system components at USAG-Grafenwoehr, Rose Barracks Vilseck 100 EA
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B010 Routine and On-Call Repair Work IAW Paragraph and 2.2 and 2.2.1 Government Estimate
B010AA Hourly-rates for the performance of routine repair work at USAG-Grafenwoehr, Rose Barracks Vilseck 1050 HRS
Government Estimate
B010AB Service call for on-call service for the performance of routine repair work at USAG- Grafenwoehr, Rose Barracks Vilseck 250 EA
B011 Emergency On-Call Repair Work IAW Paragraph 2.2.2 Government Estimate
B011AA Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru 16.00 pm 30 HRS
Government Estimate
B011AB
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck during regular duty hours 08.00am thru
16.00 pm
15 EA
Government Estimate
B011AC Hourly-rates for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am 25 HRS
Government Estimate
B011AD
Emergency service call for on-call service for the performance of emergency repair work at USAG-Grafenwoehr, Rose Barracks Vilseck after regular duty hours 16.00pm thru 08.00am
13 EA
B012 Repair Parts and Handling Fees
B012AA Repair Parts IAW Paragraph 2 Government Estimate LS 80,000.00
ITEM No DESCRIPTION Annual Number of Maintenance Cycles
Unit UNIT
PRICE
TOTAL
AMOUNT
B012AB
Contractor Material Handling Fee for the total Gov. Estimated Amount for repair parts settled with ELIN No B212AA Material Handling Fee: 15 %
80,000.00 X 15.00% 12,000.00
Total Amount:
| Exhibits B Rose Barrack Base Year |
| Exhibits B Rose Barracks Option 1 |
| Exhibits B Rose Barracks Option 2 |
File details come from the government source that posted it. Updated .