AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post the 2nd site visit and questions and answ ers no. 2. There are no other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P918B0039

X 9B. DATED (SEE ITEM 11)

27-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2018

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P918B0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

QUESTIONS & ANSWERS NO. 2

Questions & Answers No. 2

Q14. Reference: Specification Section 02 01 00 page 3 paragraph 3.3 & 3.4.

a. Please clarify in 3.3 what 3-Phase Primary Power is being discussed. The power coming over via the

3/C#250MCM from the Distribution Panel is clearly single phase.

A14(a). Paragraph 3.3 is intended to explain that 3-phase primary power will be provided for the new facility. The successful bidder should expect that the new 3-phase power will be stubbed to the existing location at the exterior of the existing operator’s building. The successful bidder is expected to coordinate all required connections and activation of the new primary power, but 3-phase power will be provided.

b. Please clarify in 3.4 what type of fixtures are expected. The (2) fixtures called out on K-C-5/E-2 are Fluorescent and HPS.

A14(b). K-C-5/E-2 is a reference drawing of the existing facility provided for information only. Fixtures shall be LED as referenced in paragraph 3.4.

Q15. Reference: K-C-5/E-1.

Can someone identify the Manufacturer of the existing Distribution Panel?

A15. Labeling on the existing panel indicate General Electric (GE) is the manufacturer.

Q16. Reference: Drawing K-C-5/E-1 Is the 3/C#250kcmil w/GRND to be Copper or Aluminum?

A16. Per section 02 01 00, Section 3.0, there is no requirement specifying either copper or aluminum.

Q17. It is our understanding the Nexum is not proposing on this project, could you please clarify if there are any other approved manufacturers besides Wastewater Technologies?

A17. The contractor can submit an equal brand. Please respond to the brand name or equal.

Q18. Please consider extending the proposal date so that we have time to figure out the design for the wastewater treatment facility.

A18. At this time the IFB respond date is not extended.

Q19. The Amendment 0001 SF30 states that a second site visit is being scheduled but no date

W912P918B0039 or time is given, please clarify.

A19. A second organized site visit has been scheduled-- To start at 10:30 a.m. local time on 23 August 2018.

Participants will meet at— 25501 Boulder Access Road, Shattuc, Illinois 62231.

Q20. Is a 5%bid bond required for this job?

A20. Bid Bonds are not required for this project. However, payment bonds and performance bonds are required (100%).

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A second organized site visit has been scheduled-- To start at 10:30 a.m. local time on 23 August 2018.

Participants will meet at— 25501 Boulder Access Road, Shattuc, Illinois 62231.

(End of provision)

(End of Summary of Changes)