AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1. Schedule a 2nd Site Visit

2. Post Questions & Answ ers

There are no other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P918B0039

X 9B. DATED (SEE ITEM 11)

27-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2018

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P918B0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by reference:

52.236-27

The following have been added by full text:

QUESTIONS & ANSWERS NO. 1

Questions & Answers No. 1

Q1. The FBO listings states that this solicitation falls under NAICS Code 221320. The solicitation section 52.204-8 states that the NAICS Code is 562219 with a size standard of $38,500,000. Could you please clarify which NAICS Code this will fall under and the size standard for the small business?

A1. The correct NAICS Code is 221320 with a standard size of $20.5M.

Q2. Please clarify the due date and time in section 13 of the SF1442.

A2. Monday 27 August 2018 at 10:00AM.

Q3. Please clarify as to whether the site superintendent can act as the site safety and health officer as well.

A3. Yes.

Q4. Please confirm that a fulltime site QC Manager with no other duties will be required at the site.

A4. Yes. No other duties will be required of the fulltime site QC Manager.

Q5. Please clarify as to whether this project is exempt from sales taxes.

A5. A sales tax exemption form will be issued to the awardee.

Q6. Please clarify as to whether page 6 of the solicitation is required with the proposal and if so, whether the total for this item is to be the sum of Items 0001-0003 or the sum of Items 0001-0006 from the bid schedule.

A6. All lines items must be priced. Give a sub-total for Line Items 0001 thru 0003 and a sub-total for Line Items 0004 thru 0006, then give a total price for all 6 line items.

Q7. Please confirm that the design of all optional items 0004-0006 is to be included in Item 0002 on the bid schedule.

A7. Yes. Bid item 0002 includes the design of all optional items 0004-0006.

Q8. Plan Sheet C-1 dated July 2018 shows the existing asphalt being removed from the pad of the Wastewater Treatment Plant and the lot out to the road. However, the sheet only shows new asphalt going back in for the pad.

Please clarify.

A8. All pavement should be replaced - please see revised plan sheet (attached). Please note, per the solicitation, pavement and fencing is an optional bid item.

Q9. Plan Sheet P-2 shows the width of the new fence is 29’, therefore the width of the new asphalt pad is 33’. I do not see enough dimensioning to figure the length of the pad. Can you provide a proposed length for the asphalt pad and area of the parking lot (if required)? Also, there is a note about 1272 sf of pavement under the proposed plan. We are unable to calculate where this quality comes from. Can you please clarify the intent?

A9. Plan Sheet P-2 is provided for information only. Guidance and clarification as to the design and fabrication of the new facility can be found in Section 02 01 00, paragraph 3.2 The contractor shall use all appropriate and relative design codes, including but not necessarily limited to The International Building Code (IBC) and all appendices, guides, loading, Unified Facilities Guide Specifications (UFGS), and normal engineering practices to develop the plans and specifications. The plans and specifications shall include all necessary items to construct a complete and usable wastewater treatment facility for all base and optional line items, including, but not necessarily limited to contractor submittal requirements, packaged wastewater treatment equipment, lighting, utilities, pavement, fencing, foundations, demolition, storage, security, and earthwork. Unless specified otherwise in these specifications, the facility, facility equipment, site improvements, etc. shall be designed and constructed to match the quality, functionality, material type, and intent of the existing wastewater treatment facility. All contractor submitted designs, plans, and specifications, shall be certified and approved by the contractor furnished Licensed Professional Engineer.

Q10. Is the pavement section detail shown on Plan Sheet C-1 dated May 1999 still valid? If not, what is the required thicknesses for the Binder and Surface lifts?

A10. Contractor should design pavement per work requirement found in Section 02 01 00, paragraph 3.5.

Pavement and access ways shall be designed to include replacement and compaction of subgrade to an adequate depth in accordance with applicable codes to prevent settlement of final surfaces. Pavement thickness shall be adequately sized to support standard vehicle traffic and tractor-trailer delivery of miscellaneous equipment. All areas within the secured fenced area and between components shall be paved with asphalt. Grades of pavement shall be such so that they do not interfere with intent or operation of equipment and provide sufficient and adequate storm water runoff from the site that does not generate surface erosion upon exit of all runoff. Contractor shall design and install appropriate erosion controls to prevent erosion of surrounding features. All underground piping shall include valve pits or risers at locations of valves. Pavement shall not interfere with any equipment controls or areas requiring typical access for maintenance requirements, adequate access control, panels, or entry points shall be provided through pavement at these locations to provide for reoccurring maintenance. Note: New fence footing and posts shall be installed prior to replacement paving.

Q11. No specifications are provided for the new asphalt, are we following IDOT Specifications for this material?

A11. Pavement work requirement is found in Section 0201 00, paragraph 3.5. Pavement and access ways shall be designed to include replacement and compaction of subgrade to an adequate depth in accordance with applicable codes to prevent settlement of final surfaces. Pavement thickness shall be adequately sized to support standard vehicle traffic and tractor-trailer delivery of miscellaneous equipment. All areas within the secured fenced area and between components shall be paved with asphalt. Grades of pavement shall be such so that they do not interfere with intent or operation of equipment and provide sufficient and adequate storm water runoff from the site that does not generate surface erosion upon exit of all runoff. Contractor shall design and install appropriate erosion controls to prevent erosion of surrounding features. All underground piping shall include valve pits or risers at locations of valves. Pavement shall not interfere with any equipment controls or areas requiring typical access for maintenance requirements, adequate access control, panels, or entry points shall be provided through pavement at these locations to provide for reoccurring maintenance. Note: New fence footing and posts shall be installed prior to replacement paving.

12. Reference: Drawings K-C-5/E-1, K-C-5/E-2, K-C-5/P-1.

Drawings K-C-5/E-1, K-C-5/E-2 do not have a Scale and are in need of a Scale. There is no other way to take off footages for conduit and cable. Is there any chance that the Scale shown on K-C-5/P-1 (0-10’) can be used for K-C- 5/E-1 & K-C-5/E-2?

A12. All drawings included in Exhibit B, including, but not limited to K-C-5/E-1 & K-C-5/E-2 represent the layout of the existing facility, not the requested new facility. Per Section 01 01 00, paragraph 3.3. in the solicitation, "Primary power source from local utility to termination at this stub up shall be converted to three phase power and installed by others. Contractor shall provide installation and connection of all electrical components from the primary power source stub". This solicitation is not requesting new conduit and cable to the extent shown in drawing K-C-E/E-1 - the drawing is merely provided for information only to depict existing conditions.

13. Reference: K-C-5/E-2.

Does the Fixture A and Fixture B come shipped with the Operator’s Building. If not, can we get Model#’s of the preferred Fixtures?

A13. Drawing K-C-5/E-2 represents the existing facility and building, not the requested new facility. This drawing is provided for information only to depict existing conditions. Per Section 02 01 00, paragraph 3.4. in the solicitation, "Fixtures shall be LED".

End of Questions & Answers.

SECTION 00 10 00 - SOLICITATION

The required response date/time 27-Aug-2018 10:00 AM has been added.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 221320.

(2) The small business size standard is $20,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.

(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.

(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.

(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,186.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

The following have been deleted:

52.236-27

(End of Summary of Changes)