W912P9-16-R-0002.pdf
PDF 646 KB Posted
- Solicitation number
- W912P9-16-R-0002
About this file
RFP W912P9-16-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendee_Sheet.pdf | ||
| W912P9-16-R-0002-0004.pdf | ||
| Question_and_Answers_5 _48 _203 _ _213_-_221.docx | DOCX document | |
| Question_and_Answers.docx | DOCX document | |
| Appendix_A_PPQ_Coversheet.pdf | ||
| W912P9-16-R-0002-0002.pdf | ||
| W912P9-16-R-0002-0001.pdf | ||
| Attachment_4_PPQ.pdf | ||
| Attachment_4_PPQ_Cover_Page.pdf | ||
| Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.xlsx | XLSX spreadsheet | |
| D4_Frost_Ave_Sampling.docx | DOCX document | |
| SAG_for_SLS_-_October_2000.pdf | ||
| FUSRAP_St__Louis_QAPP_Sep_2015r2_apdf.pdf | ||
| Question_and_Answers_Posting_4_November_2015.docx | DOCX document | |
| D2_SLDS_FUSRAP_Compound.docx | DOCX document | |
| Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.pdf | ||
| D1_SLAPS_FUSRAP_Compound.docx | DOCX document | |
| D3_Ballfields_Excavation.docx | DOCX document | |
| Question_and_Answers_for_Posting.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S
until 10:00 AM local time 20 Nov 2015
A X B X C
D
EX
X G F 36 - 41
42 - 46 H 47- 51
Treniece.S.Stith@usace.army.mi
RATIN PAG OF PAGE
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-
Prescribed by
FAR (48 CFR)
1 51
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AN
ADDRES
SIGN OFFER (Type or print)
O
OFFERO
AMENDMENT DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE
IS DIFFERENT FROM ABOVE -
SUCH ADDRESS IN
18. OFFER DATE
1. THIS CONTRACT IS A RATED
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P9 8. ADDRESS OFFER
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
A. (NO COLLECT CALLS)
TRENIECE S STITH 314 331-8520
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT
SUPPLIES OR SERVICES AND PRICES/
2 - 5
X I CONTRACT
DESCRIPTION/ SPECS./ WORK X
PACKAGING AND
6 - 19 J LIST OF
INSPECTION AND
DELIVERIES OR
X K
REPRESENTATIONS, CERTIFICATIONS
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION X
SPECIAL CONTRACT
OFFER (Must be fully completed by offeror) X M
L 1. INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF
(The offeror acknowledges receipt of amendments
AMENDMENT DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X SEC. DESCRIPTIO (X SEC. DESCRIPTIO PAGE(S
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF 28. AWARD
EMAIL: TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. 21. ACCOUNTING AND
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN ITEM
24. ADMINISTERED BY (If other than Item 7) COD 25. PAYMENT WILL BE MADE COD
PART IV - REPRESENTATIONS AND
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
22 - 35
PART II - CONTRACT
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
314 331-8746FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE 5. DATE
15 Oct 2015
4. TYPE OF
SEALED BID
NEGOTIATED
[ X ]
3. SOLICITATION NO.
W912P9-16-R-0002
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Job
FUSRAP
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
FOB: Destination
SIGNAL CODE: A
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Job
OPTION FUSRAP
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Job
OPTION FUSRAP
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Job
OPTION FUSRAP
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Job
OPTION FUSRAP
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
UNIT UNIT PRICE MAX AMOUNT
5001 UNDEFINED Job OPTION FUSRAP (Six-Month Extension of Services)
CPFF
Contractor to provide Formerly Utilized Sites Remedial Action Program (FUSRAP) services to U.S. Army Corps of Engineers St. Louis District.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00 $50,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00 $50,000,000.00
Section C - Descriptions and Specifications
FUSRAP STATEMENT OF WORK
STATEMENT OF WORK
ST. LOUIS FUSRAP REMEDIAL ACTION
September 9, 2015
PART 1- GENERAL
SECTION C
1.1 CONTRACT AWARD
The Government intends to award a Single Award Task Order Contract (SATOC), remedial action indefinite delivery/indefinite quantity type contract under Solicitation W912P9-16-R-0002. The contract will be awarded to a Small Business-Set Aside firm utilizing the best value tradeoff process. Task Orders issued under this contract will be cost reimbursable Cost Plus Fixed-Fee (CPFF).
1.2 DESCRIPTION OF WORK
This contract will provide for Hazardous, Toxic and Radioactive Waste (HTRW) remediation activities managed by the U.S. Army Corps of Engineers St. Louis District. This contract for the environmental response actions, associated investigation, design and removal activities will include service and construction activities mandated by Formerly Utilized Sites Remedial Action Program (FUSRAP). The work at the FUSRAP St. Louis Sites falls under the Comprehensive Environmental Response Compensation, Liability Act (CERCLA). The St. Louis FUSRAP sites contain low-level radiological and chemically contaminated material. The St. Louis sites are located in the metropolitan St. Louis area in two primary vicinities, the St. Louis Downtown Site (SLDS) and the St. Louis North County sites (NORCO). The NORCO sites includes the St. Louis Airport Site (SLAPS), SLAPS Vicinity Properties (SLAPS VPs), and the Hiss/Latty Avenue Properties (HISS/Latty). Work may be concurrent at multiple locations within these sites. Sites range from heavily industrialized areas to open fields. Contaminated accessible soil remaining for excavation and offsite disposal currently is estimated at 182,700 cubic yards.
1.3 SCOPE OF WORK
The SATOC to be awarded will require personnel, plant and equipment to respond to the St. Louis District FUSRAP support. The remedial action work encompasses any and all remediation work for remedial/removal actions including general conditions, field engineering, environmental services, environmental actions, remedial actions and management services. The work anticipated under this contract is primarily for, but not limited to, low level radioactive contaminated material removal.
Radiological contaminates are primarily thorium, radium and uranium, with co-located chemical contamination such as selenium, cadmium, and arsenic. The Record of Decision for SLDS and the Record of Decision for the St. Louis North County Sites (including SLAPS VPs and HISS/Latty) are viewable on-line at the St. Louis FUSRAP web site:
http://www.mvs.usace.army.mil/Missions/CenterofExpertise/FormerlyUtilizedSitesRemedialActi onProgram/aspx.
1.4 CONTRACTOR CAPABILITY, TECHNICAL EXPERTISE
The Contractor selected for this work shall have and demonstrate the capability to perform environmental compliance and remediation services relating to FUSRAP and HTRW or similar work with radioactive contamination in the areas of field engineering, remediation work and management services, including , but not limited to:
1.4.1 Field Engineering
1.4.1.1 The contractor shall present capability to perform environmental investigations, remedial design of work plans and documents relating to FUSRAP and HTRW or similar work.
1.4.1.2 The Contractor shall be responsible for the utilization of existing Remedial Action Work Descriptions in the remediation efforts. Contractor may be required to update work plans or generate additional construction work plans detailing how the work will be executed. Applicable portions of the construction work plans must be certified by respective registered professionals (i.e., P.E., Site Safety Officer, Radiological Safety Officer, Quality Control Officer, Geologist, Professional Land Surveyor, Certified Health Physicist, etc).
1.4.1.3 Contractor may be required to fill data gaps as needed to prepare the construction work plans.
Subsurface boring capabilities would be required for obtaining such data. Installation and/or decommissioning of ground water monitoring wells may be required.
1.4.1.4 The contractor will be required to develop and implement appropriate Health and Safety Programs and Plans for HTRW site operations as mandated by OSHA and EM 385-1-1.
1.4.1.5 The contractor shall provide HTRW Construction Quality Management, including submittals and other requirements EP 415-1-266.
1.4.1.6 Conducting final status surveys in accordance with the Multi-Agency Radiation Survey and Site Manual ( MARSSIM )experience and gamma walkover/guided excavation will be required.
1.4.2 Remediation Work
The Contractor shall present capability to perform construction remedial action operations (i.e.
excavation, backfilling, site restoration, decontamination and demolition) relating to FUSRAP and HTRW or similar work
1.4.2.1 Contractor shall provide excavation of contaminated soils and materials located at SLDS, SLAPS VPs, and the HISS/Latty. Excavation depths range from surface soil removal to depths exceeding 25 feet, located in a variety of conditions (e.g., open field, near/under structures, above and below ground water, near utilities). Contractor shall be responsible for planning and executing all excavation activities. The Contractor (or its subcontractor) shall be responsible for detailing and installing deep excavation support/bracing, as required for remediation and to include support/bracing modification as necessitated by field conditions. Post-excavation evaluation by a geologist for preferential pathways will be required.
1.4.2.2 Contractor may be required to decontaminate buildings. Structural support, demolition and disposal of structures may be required.
1.4.2.3 Documentation of current, final excavation and restoration as-built conditions via land survey, GIS and CADD drawing will be required. Safety support, quality control, and site-wide management are also requirements.
1.4.2.4 Contractor shall be responsible for the collection and control of surface and/or ground water.
This may include on-site physical water treatment via batch treatment facility, with subsequent discharge to either publicly-owned treatment works or surface waters according to applicable discharge requirements.
1.4.2.5 As part of the excavation process, permanent and/or temporary relocation of utilities may be required.
1.4.2.6 Contractor shall provide for the backfill and restoration of disturbed areas.
1.4.2.7 In conjunction with construction activities discussed above (excavation, utility relocation, water management, etc.), the Contractor shall work with regulators, local entities, railroad entities and stakeholders, to include, but not limited to, EPA Region VII, Missouri Department of Natural Resources, St. Louis Airport Authority, Federal Aviation Administration, Metropolitan St. Louis Sewer District, and Mallinckrodt LLC.
1.4.2.8 Contractor shall manage stockpiles and coordinate transportation of excavated materials to appropriate off-site disposal facilities via an existing transshipment rail facility or with other transportation contractor. Primary radiological disposal shall be accomplished with existing USACE contracts; however, the Contractor may be required to secure disposal facilities subcontracts during the execution of this work. Knowledge of and experience with classification of materials, Department of Transportation Regulations, and HTRW manifesting are required.
1.4.3 Management Services
1.4.3.1 Management organization and staffing, including a list of key personnel and their related qualification (experience and education) and authorities, plus subcontractors
1.4.3.2 Cost Reimbursable Contract Management Procedures and accounting system.
1.4.3.3 Scheduling, cost control and performance status reporting
1.4.3.4 Procurement and Subcontracting policies.
1. 5 BACKGROUND INFORMATION
The Contractor will be furnished a Scope of Work for each proposed task order. The Scope of Work will typically include a narrative remedial action work description and accompanying plans and specifications.
Other applicable back up data such as records of decisions, engineering evaluations/cost analysis, pre-design investigation reports and design considerations will be furnished or made available to the Contractor. Joint USACE – Contractor site inspections are anticipated prior to negotiation of each task order.
1.6 DESCRIPTION OF TASK ORDERS
A Task Order is an official contracting instrument under this contract. The function is to direct the Contractor to perform scoped work and/or approved items of work. The Contracting Officer, or his/her authorized representative, will furnish the Contractor with a Scope of Work for the activity or services required. The Service Contract Act or the Davis Bacon Act wages will be incorporated , as applicable, depending on the type of work being performed in each Task Order. The Contractor shall provide the Government with a cost proposal within 14 to 30 calendar days of the request for proposal, depending on the work/Task Order, or unless specified otherwise. The Contractor’s proposal shall be supported by appropriate documentation (production rates, use of overtime, crew sizes and make-up, types of equipment, materials and supplies). The Government will review the proposal for reasonableness and completeness, and then negotiate with the Contractor all items and period(s) of performance. The Contracting Officer will then issue the task order. Only the Contracting Officer (or designee) may formally execute or modify Task Orders. The Contractor will not be reimbursed for the preparation of the cost proposal.
1.7 COST REIMBURSEMENT TASK ORDERS
Cost reimbursement task orders provide payment to the Contractor for allowable, allocable, and reasonable costs incurred in the performance of the work. This section outlines Government policies, procedures, practices, and requirements as it relates to cost reimbursement contracting mechanisms. If Government Furnish Property/ Government Furnished Equipment (GFP/GFE) is provided, it will be stated in the individual Task Order and will be accounted for in accordance with the approved property control plan (PCP) and any site specific addendum to the PCP. If property is acquired by the Contractor under Cost Reimbursable task order in performance of the work, the Contractor acquired property (CAP) will also be accounted for in the same manner.
1.7.1 Objective
The objective of a cost reimbursement task order is for USACE and the Contractor to jointly accomplish the work in conformance with the specified requirements, to complete the work on schedule and at the most economical cost.
1.7.2 Management Organization, Responsibilities and Authorities
The Contractor shall provide a management staff and organization that is capable of effectively and efficiently managing its own resources, as well as any subcontracts. Managers are to have relevant experience and past responsibilities to control costs and insure timely execution of the work. Likewise, key technical personnel are to have relevant education and experience to perform the scope of services.
The primary Government authority under this contract is the Contracting Officer (CO). Designated representatives will be identified, in writing, as authorized Contracting Officer’s Representative (COR), or Administrative Contracting Officer (ACO) and also serve as personnel of authority. Only the CO or ACO may cause an increase in the contract obligation amount. Technical direction under a cost reimbursement task order may also be made by the COR as long as it does not impact cost or schedule.
1.7.3 Cost Control
Since much of the risk associated with cost reimbursable contracting is borne by the Government, the Contractor must show evidence of sufficient cost control policies and procedures. Cost control is also important because of the multiple funding sources possible under this contract. It is imperative that the contractor be capable of estimating, budgeting, accounting and reporting costs by individual funding sources as well as work item. In accordance with FAR 16. 104(h), the contractor must be capable to track costs on cost –reimbursable actions. To the extent practicable, the Government will attempt to segregate task orders and other work authorizations by sole funding source, for administrative purposes. The Contractor shall make available, upon request, supporting documents and provide for physical inspection or demonstration at the appropriate office, of its accounting system capabilities to support cost reimbursement contract accounting needs.
1.7.4 Mobilization
Mobilization is a non-recurring cost unique to individual work sites for a given task order. Costs for mobilization will be reimbursed, if incurred, after formal execution of the relevant cost reimbursement task order. Mobilization costs prior to formal task orders are not reimbursable. Contractors are encourage to segregate non-recurring costs such as mobilization when submitting task order proposals.
1.7.5 Contract Management Procedures
The Contractor is expected to have in place standard operating procedures that cover in detail the methods that the Contractor will employ relating to cost reimbursement contracted work with the Government, especially the capability to estimate, budget, account and report costs.
1.7.6 Management Information System (MIS)
The principles of defining and maintaining a performance measurement baseline for comparison against the current estimate at completion and schedule are expected to be incorporated in some fashion in the contractor's MIS. Detailed analysis capability of cost variances for labor, material, equipment, overhead, etc., between the performance measurement baseline and the current estimate at completion is expected.
The MIS must be capable of integrating cost and recording progress payments for fixed-price and/or cost reimbursement type subcontracts. The MIS shall include accurate updates of schedule logic, actual dates, and actual budgeting data on the schedule. The MIS shall be capable of simultaneously managing on multiple task orders, the current approved budget and schedule, actual cost and progress incurred, earned value, and projected future budget and schedule data. Key personnel successful experience in using the MIS tools should be demonstrated.
1.7.7 Work Allocation Document (WAD)
1.7.7.1 The Work Allocation Document system may be used to allocate previously obligated contract funds by the Government to the contractor and to further control the obligation or expenditures of funds for identified work. It is a series of numbered documents directly related to the Work Breakdown Structure (WBS) prepared by the contractor, and approved by the CO or COR.
1.7.7.2 After task order issuance, the Government may request the contractor to submit WAD budgets in the government-specified WAD system format. This format will include: a) an approved WBS; b) an estimate keyed to the WBS; c) a schedule for the task; and d) a narrative description of the scope of work.
The Government will review the submitted WAD/WADs and approve/disapprove as necessary. The budget estimates of costs for the work orders submitted for each WAD shall not exceed the total budget for that order.
1.8 Sub-Contracting and Procurement
The Contracting Officer shall review and consent to solicitations over $25,000. The Contractor must give notice to the Contracting Officer and obtain specific approval for any cost reimbursement type subcontract. The Contractor will have detailed closeout procedures in place for subcontractors.
1..8.1 Just as the Government clearly defines its procurement policy, the contractor's procurement policy shall be clearly delineated. The contractor shall utilize procurement and subcontracting procedures consistent with good faith principles and fair dealing. Further, where required, the contractor will employ the principles and requirements of the Federal Acquisition Regulation.
1..8.2 The objective of the Government is to select contractors that will raise the standards of subcontract administration while incorporating integrity and peer respect. Adequate staffing to perform subcontract management is required. Detailed contractor procurement procedures and subcontract program plans are critical to the successful implementation of this contract. In accordance with FAR 44.203(a), the Contracting Officer’s consent to a subcontract or approval of the contractor’s purchasing system does not constitute a determination of the acceptability of the subcontract terms or price, or of the allowability of costs, unless the consent or approval specifies otherwise.
1.8.3 Technical Changes and Claims
Contract clauses for changes and disputes are included for cost reimbursement task orders. The contractor shall minimize subcontract disputes and effectively and efficiently control and process subcontract changes. Pre-pricing of subcontract changes is preferred, as is a formal system of issuing subcontract changes where obligations are recorded in advance of issuance of drawing changes or task orders issued to the contractor.
1.8.4 Closeout Procedures
All cost reimbursement task orders will require a final audit by the cognizant audit office of the Federal Government. The contractor is expected to demonstrate procedures and processes that facilitate quick subcontract and supplier closeout and resolution of disputes.
1.8.5 Fee Determination
For Cost-Plus-Fixed-Fee Task Orders, the fee rate will be determined during initial negotiations for each separate task order.
1.9 SITE-SPECIFIC SUBMITTALS. Site work shall not commence on a project until the Government, (the Contracting Officer’s Representative (COR) or other management personnel has approved all of the site-specific submittals required for each specific Task Order.
1.9.1 Work Plan
A comprehensive Work Plan shall be prepared, as required, to fully describe all aspects of the work to be completed. The Work Plan shall contain but not be limited to the following:
1.9.1.1 Work to be accomplished.
1.9.1.2 Discussion of implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations.
1.9.1.3 Schedule that presents the requirements to complete the required field work and key milestones.
1.9.1.4 Permits, licenses, and certificates, identification number, and locations of the disposal facility, if necessary.
1.9.1.5 Key personnel to be used on the project and their responsibilities.
1.9.1.6 Logs, reports, and record keeping to be utilized
1.9.1.7 Plans as listed below, as required.
1.9.2 Health and Safety
Site-specific health and safety submittals including safety practices, procedures, and equipment are required. The Contractor shall develop, implement, and enforce an Accident Prevention Plan (APP). The plan shall incorporate the requirements of 29 CFR 1910, Corps of Engineers EM 385-1-1 (Safety and Health Requirements) and ER385-1 (Safety and Occupational Health Requirements for Hazardous, Toxic, and Radioactive Waste (HTRW) Activities). The Health and Safety Manager shall sign and date the APP prior to submittal for approval.
1.9.3 Sampling and Analysis
A Contractor prepared sampling and analysis plan in accordance with the requirements of USACE’s EM 200-1-3 shall be developed in accordance with the plans and specifications submitted for each project and shall include information described in the paragraph “Project Staff Organization and Responsibilities" in this section.
1.9.4 Contractor Quality Control
A Contractor Quality Control Plan including quality control organization, qualifications of personnel, authority, areas of responsibility, subcontractor quality control, tracking procedures and other necessary information based upon the work in the task order shall be submitted.
1.9.5 Daily Quality Control
Daily quality control reports shall be prepared in accordance with the task order and contract requirements and submitted to government personnel during the construction remediation process.
1.9.6 Technical
Technical submittals are those required and further described in the Statement of Work specifications of each individual Task Order.
PART 2 – PRODUCTS (Not Applicable)
PART 3 – EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS
All remedial actions shall be in full compliance with applicable Federal, State and local environmental laws and regulations including but not limited to: Pertinent Occupational Safety and Health Administration requirements, Department of Transportation requirements, National Environmental Policy Act, Clean Air Act, Clean Water Act, Toxic Substances Control Act (TSCA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Act (RCRA),and Underground Storage Tank (UST) regulations. The Contractor shall assure that all activities performed by his personnel, subcontractors and suppliers are executed as required by these laws and regulations.
3.2 PERMITS AND LICENSES
The Contractor shall meet the substantive and/or administrative requirements of all Environmental Permits, Licenses and/or Certificates required by each task order. All required clearances, such as digging permits, shall be obtained prior to initiation of excavating or drilling operations.
3.3 TRANSPORTATION, STORAGE, TREATMENT AND/OR DISPOSAL OF HAZARDOUS
WASTES
Transportation, storage, treatment and/or disposal of hazardous wastes requirements will be detailed in the site specific Scope of Work, or accompanying plans and specifications, of each individual task order.
The Contractor shall ensure that the transportation, storage, treatment and/or disposal of hazardous wastes comply with applicable federal, state and local laws and regulations. The Contractor shall also ensure that his personnel and staff, and all subcontractors handle, transport, store, treat, and/or dispose of all hazardous wastes as required by applicable laws and regulations. The Contractor is responsible for the storage, loading, and certification of all manifests. Details on completing the Complete Manifest Package will be issued in the individual task orders if necessary.
3. 4 SITE SAFETY AND HEALTH
Site safety and health requirements will be detailed in the site-specific Scope of Work, or accompanying plans and specifications, of each individual task order. The Contractor shall have an ongoing Safety and Health Program that meets the requirements of the OSHA standard 29 CFR 1910.120 / 29 CFR 1926.65 and other requirements of EM 385-1-1 and ER 385-1-92.
3.5 CHEMICAL DATA QUALITY MANAGEMENT (CDQM)
CDQM, if required, will be detailed in the site-specific Scope of Work, or accompanying plans and specifications, of each individual task order. The Contractor shall be able to provide services that conform to requirements presented in ER 1110-1-263 and guidance contained in the following:
EM 200-1-1 on laboratory validation EM 200-1-2 on technical project planning EM 200-1-3 on preparation of sampling and analysis EM 200-1-6 on chemical quality assurance
3.6 SECURITY
The Contractor shall provide site security (e.g., fencing and/or guard service) as required by each individual Task Order. However, at a minimum the Contractor shall maintain the site and all other Contractor controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area. Work on or near roadways shall be carefully marked with lights and barricades meeting State and local regulations or, where such regulations are not applicable, deemed adequate to minimize the risk of an accident. Open excavations that pose a danger to site personnel or others shall be fenced to prevent accidental entry. Side slopes of excavations shall be shored or left at a safe angle of repose as defined by OSHA 1926.650-652 and EM 385-1-1, Section 25. All equipment, when not in operation, shall be left in a safe manner (e.g., wheels blocked and buckets on the ground).
Near residential areas where there may be children, special consideration shall be given to site security/safety needs.
3.7 ENGINEERING REQUIREMENTS
The engineering requirements related to the remedial action will be described in detail in each individual Task Order. The Contractor shall perform all necessary field work and analyses to address the appropriate engineering requirements. Engineering work performed should be under the authority of a properly licensed engineer. Furthermore, engineering support to be performed incidental to construction /remediation will depend on the requirements of the individual Task Order. If required, the Contractor shall outline a complete Quality Control Plan in order to implement quality control testing for construction of project's engineering features. The Contractor shall specify and perform any and all necessary engineering quality control testing, at required frequencies, deemed necessary in order to adequately control and monitor construction/remediation
3.8 MANAGEMENT AND TECHNICAL STAFF ORGANIZATION AND RESPONSIBILITIES
The Contractor shall clearly describe his organization including subcontractors and identify personnel (management, administrative and technical) and their responsibilities. The project organization shall address the Contractor-subcontractor interactions. Subcontractors shall not be replaced without prior approval of the Contracting Officer.
3.8.1 List of Key Personnel shall include their general qualifications (experience/education) and their HTRW specific qualifications.
3.8.2 The Contractor’s management and quality control (QC) chains-of-command shall be mutually exclusive. The Contractor's CQCC shall report to a responsible company senior officer. The Contractor's project production management and quality control chain-of-command shall be mutually exclusive.
3.8.3 Subcontractors shall not be replaced without prior approval of the Contracting Officer.
3.9 CONTRACTOR PERSONNEL AND QUALIFICATIONS
The following list of qualifications is indicative of HTRW-type personnel. Requirements of on-site personnel may be further detailed in the site-specific Scope of Work of individual task orders. The Contractor shall not replace key personnel without prior approval of the Contracting Officer.
3.9.1 Program Manager The Program Manager is responsible for overall management of the contract including cost control, schedule and technical quality. The Program Manager shall be the primary Contractor contact before issuance of a Task Order. The Program Manager’s qualifications, experience and performance must be satisfactory to the Contracting Officer and based on the following:
3.9.1.1. Degree from an accredited college or university in engineering, construction or engineering management, geology, chemistry or other relevant fields;
3.9.1.2. Professional registration in respective field;
3.9.1.3. Experience in environmental restoration or comparable work;
3.9.1.4. Experience with federal government cost reimbursable contracting.
3.9.1.5. Working knowledge of applicable federal, state and local environmental related laws, regulations.
3.9.2 Project Manager
The Contractor shall designate a Project Manager for each individual task order. The Program Manager may be designated as the Project Manager if execution is sufficiently limited and with prior approval of the Contracting Officer. The Project Manager shall be the primary Contractor contact for the designated Task Order. The Project Manager is responsible for the management and execution of the Task Order and assures compliance with the Scope of Work, accompanying plans and specifications, all work plans, and applicable federal, state, and local laws and regulations. The Project Manager shall be the primary Contractor contact once the Task Order is issued and in progress. The Project Manager’s qualifications, experience and performance must be satisfactory to the Contracting Officer and based on the following:
3.9.2.1. Degree from an accredited college or university in engineering, construction or engineering management,
3.9.2.1. Degree from an accredited college or university in engineering, construction or engineering management, geology, chemistry or other relevant field;
3.9.2.2. Professional registration in respective field;
3.9.2.3. Project Management-level experience in environmental restoration or HTRW work;
3.9.2.4. Experience with federal government cost reimbursable contracting.
3.9.2.5. Working knowledge of applicable federal, state and local environmental related laws, regulations.
3.9.3 Safety and Health Officer
The Contractor shall utilize a trained, experienced Safety and Health Officer to enforce all aspects of the Safety and Health Program at each site. The Safety and Health Officer shall have the authority to stop work if unacceptable health or safety conditions exist. The Safety and Health Officer’s qualifications, experience and performance must be satisfactory to the Contracting Officer and based on the following:
3.9.3.1 Work experience at HTRW sites or comparable environmental restoration field activities where
Level C and Level B personal protective equipment was required
3.9.3.2 Relevant specialized training, safety program implementation such as the proper use of air monitoring instruments, air sampling methods and the interpretation of results.
3.9.3.3 Certification of completion in First Aid and CPR training by a recognized organization such as the
American Red Cross.
3.9.3.4 Working knowledge of applicable federal, and state occupational and health regulations.
3.9.4 Radiation Safety Officer (RSO)
For sites where radiation is a hazard of concern, the Contractor shall utilize a RSO to implement radiation protection programs. The RSO’s qualifications, experience and performance must be satisfactory to the Contracting Officer and based on the following:
3.9.4.1 Degree from an accredited institution in health physics or related field. Equivalent education, training and experience can be submitted for USACE concurrence in lieu of a degree for personnel that are otherwise qualified.
3.9.4.2 Experience in implementing radiation protection programs at HTRW sites or other comparable work.
3.9.4.3 Working knowledge of applicable federal, state and USACE radiation protection regulations and requirements.
3.9.5 Project Engineer
The Project Engineer shall be responsible for field engineering activities to ensure technical compliance with the task order’s Scope of Work and accompanying plans and specifications. The Project Engineer’s qualifications, experience and performance must be satisfactory to the Contracting Officer and based on the following:
3.9.5.1 Degree from an accredited college or university in civil, environmental, geotechnical engineering, or other relevant field;
3.9.5.2 Experience in remedial/removal activities at HTRW sites, or comparable environmental restoration work.
3.9.6 Contractor Quality Control (CQC) Manager
For each task order and/or site, the Contractor shall designate an individual within the organization who shall have overall management responsibility for CQC with authority to act in all matters of CQC for the Contractor. The CQC manager shall be on-site during construction and remedial/removal activities. The CQC manager shall have no other duties. The CQC Manager’s qualifications, experience and performance must be satisfactory to the Contracting Officer and shall be based on the number of years of comparable experience at an HTRW site or other environmental restoration work activity.
3.9.7 Site Superintendent
For each task order issued, or distinct site location, the Contractor shall have a designated Site Superintendent with responsibility and authority to direct the work to be performed and to verify compliance. The Site Superintendent shall have evidence of the following qualifications:
3.9.7.1 Experience as a site superintendent, or equivalent position.
3.9.7.2 Experience in equivalent positions at HTRW sites, or comparable environmental restoration work.
3.9.7.3 Experience with cost-reimbursable contracts and/or task orders.
3.9.8 Field Staff
All field personnel, shall meet the training, medical surveillance, safety and health program requirements of OSHA that are pertinent to each individual task order.
3.9.9 Other Key Technical or Management Personnel
Each individual task order may require additional professional-level staff for the remedial/removal action work or services. Additional disciplines and areas of expertise may include, but are not limited to, environmental engineering, geology, hydrogeology, chemistry, occupational physician, health physicist, industrial hygienist, health physics technicians, and regulatory specialist.
3.10 MANAGEMENT INFORMATION SYSTEM (MIS)
A MIS capability is required as an on-site management tool to facilitate the tracking of costs scheduled and incurred, overruns and underruns, and subcontractor costs, for cost-reimbursement task orders.
3.10.1 This MIS should integrate cost and schedule information to provide at a minimum: daily tracking of costs incurred, daily tracking of costs scheduled, projection of cost and schedules, earned value, and time phased budget and spending curves. Automated information should be remotely accessible at the work site and other locations to allow for daily cost tracking of actual labor (both on-site and home office), equipment, purchases, subcontracts, other commitments, obligations, and expenditures. This system should be able to be used as a project management tool to capture committed or obligated costs as they occur, not when reconciled at invoice. Anticipated capabilities of a MIS include, but may not be limited, to the following:
3.10.2 As a minimum the system must have the following capabilities. All of these capabilities may not be required on every Task Order and will be required for each specifically based upon the need.
3.10.2.1 The cost tracking system shall be maintained on-site and shall provide real time ability to capture costs.
3.10.2.2 The cost tracking system shall have the ability to forecast costs.
3.10.2.3 The cost tracking system shall provide a daily report for review and approval by the Government.
3.10.2.4 The cost tracking system shall allow for active management and budgeting of task order costs, including but not limited to home office costs, direct field costs, indirect costs, subcontractor costs, equipment costs, and other project costs.
3.10.2.4 The cost tracking system shall have the ability to provide a weekly cost comparison/cost variance report. This report shall capture all committed/expended costs and shall allow the comparison of the forecasted total task order cost with the budgeted cost. It shall also show the overruns/underruns on the individual task order tasks.
3.10.2.5 Work Breakdown Structure.
The Contractor shall provide MIS procedures anticipated for tracking all phases of cost, from daily subcontracting, material, labor and overheads, through the phase required to invoice for cost. The daily cost tracking shall be performed in a Work Breakdown Structure (WBS) format, with various defined levels of control. The upper levels of the WBS shall be where the Contractor’s costs roll-up to levels where the COR will manage costs and funding. For example, Level 1 would be the total project and Level 2 will be Engineering, Construction and Fee. The lower level of the WBS shall be where the Contractor controls costs per his own accounting system. The MIS and/or accounting system must be capable of recording and tracking costs by separate project funds in addition to work schedule items. Earned Value reporting is expanded at the upper levels of the WBS.
3.10.2.6 Planning and Scheduling
The planning and scheduling system shall be based on a network theory embodied in the critical path method (CPM) that shows the time needed for each step of the project and also the steps that must be taken in a logical sequence. This should include a standard network analysis system that can be resource loaded for cost and manpower projections and earned value analysis.
3.10.2.7 Technical and Regulatory Reports.
The Contractor shall track technical and regulatory reports using the MIS for each project, as required in the Task Order. These systems reports shall contain the following information, at a minimum: Contract number, Contractor name, project name, reporting period, scheduled completion date, actual completion date.
3.11 CONTRACTOR QUALITY CONTROL (CQC)
The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause entitled “Inspection of Construction.” The quality control system shall consist of plans, procedures, and organizations necessary to produce an end product which complies with the contract requirements. The system shall cover all construction operations, both on-site and off-site and specific requirements shall be included in individual Task Orders.
PART 4 – SECURITY
4.1 SUSPICIOUS ACTIVITY REPORTING TRAINING (E.G. IWATCH, CORPSWATCH, OR
SEE SOMETHING, SAY SOMETHING)
The contractor and all associated sub-contractors shall receive a brief/training (provided by the Requiring Activity (RA)) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
4.2 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government 5001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-DEC-2015 TO
30-NOV-2016
N/A FUSRAP OFFICE
8945 LATTY AVENUE
BERKELEY MO 63134-1024
9665A6
1001 POP 01-DEC-2016 TO
30-NOV-2017
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-DEC-2017 TO
30-NOV-2018
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-DEC-2018 TO
30-NOV-2019
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-DEC-2019 TO
30-NOV-2020
N/A (SAME AS PREVIOUS LOCATION)
5001 POP 01-DEC-2020 TO
31-MAY-2021
N/A (SAME AS PREVIOUS LOCATION)
Section I - Contract Clauses
52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
DEC 2014
52.210-1 Market Research APR 2011 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997 52.215-23 Limitations on Pass-Through Charges OCT 2009 52.216-8 Fixed Fee JUN 2011 52.216-26 Payments Of Allowable Costs Before Definitization DEC 2002 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.222-2 Payment For Overtime Premiums JUL 1990 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-35 Equal Opportunity for Veterans JUL 2014 52.222-37 Employment Reports on Veterans JUL 2014 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-41 Service Contract Labor Standards MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification AUG 2013 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-20 Limitation Of Cost APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JUL 2013 52.232-25 Alt I Prompt Payment (July 2013) Alternate I FEB 2002 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-7 Permits and Responsibilities NOV 1991 52.249-6 Termination (Cost Reimbursement) MAY 2004 52.249-14 Excusable Delays APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding of Unclassified Controlled Technical
Information
NOV 2013
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
DEC 2014
252.215-7002 Cost Estimating System Requirements DEC 2012 252.216-7009 Allowability of Legal Costs Incurred in Connection With a
Whistleblower Proceeding
SEP 2013
252.222-7005 Prohibition on Use of Nonimmigrant Alien--Guam SEP 1999 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.
This is the start of the file's text. The full file is on GovTribe.