Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.pdf

PDF 112 KB Posted

Attached to
Formerly Utilized Sites Remedial Action Program (FUSRAP)
Solicitation number
W912P9-16-R-0002
Issued by

About this file

Revised 30 Oct Cost Estimate Workbook Attachment 2 in Adobe is hereby posted.

View the file

Other files

File Type Posted
Site_Visit_Attendee_Sheet.pdf PDF
W912P9-16-R-0002-0004.pdf PDF
Question_and_Answers_5 _48 _203 _ _213_-_221.docx DOCX document
Question_and_Answers.docx DOCX document
Appendix_A_PPQ_Coversheet.pdf PDF
W912P9-16-R-0002-0002.pdf PDF
W912P9-16-R-0002-0001.pdf PDF
Attachment_4_PPQ.pdf PDF
Attachment_4_PPQ_Cover_Page.pdf PDF
Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.xlsx XLSX spreadsheet
D4_Frost_Ave_Sampling.docx DOCX document
SAG_for_SLS_-_October_2000.pdf PDF
FUSRAP_St__Louis_QAPP_Sep_2015r2_apdf.pdf PDF
Question_and_Answers_Posting_4_November_2015.docx DOCX document
D2_SLDS_FUSRAP_Compound.docx DOCX document
D1_SLAPS_FUSRAP_Compound.docx DOCX document
D3_Ballfields_Excavation.docx DOCX document
Question_and_Answers_for_Posting.docx DOCX document
W912P9-16-R-0002.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORKSHEET

01.02.00 TASK 2 ‐ ‐ Home Office Support General Conditions

Scope: Provide Home office support effort in selected management, technical and services areas for which full time project assigned positons are not required.

Assumptions:

01.02.01 Home Office Support (NORCO)

Direct Labor

Code Job Description Hourly Rate Hours Labor Cost

" 0 0 0

" 0 0 0

" 0 0 0

Total Task Hours

Total Home Office Direct Labor Costs 0

Fringe on Home Office Labor 0% 0

Home Over head 0% 0

Total Direct Labor Cost 0

Other Direct Costs 0

Subcontracting

Subcontracting Total Cost 0

Materials

Material Total Cost 0

Equipment

Equipment Total Cost 0

Total ODC Costs 0

SUBTOTAL Direct Cost and ODC 0

G&A 0% 0

Total Task Total without Fee 0

WORKSHEET

01.02.00 TASK 2 ‐ ‐ Home Office Support General Conditions

Scope: Provide Home office support effort in selected management, technical and services areas for which full time project assigned positions are not required.

Assumptions:

01.02.02 Home Office Support St. Louis Downtown Site (SLDS)

Direct Labor

Code Job Description Hourly Rate Hours Labor Cost

" 0 0 0

" 0 0 0

" 0 0 0

Total Task Hours

Total Field Office Direct Labor Costs 0

Fringe on Direct Labor 0% 0

Field Over head 0% 0

Total Direct Labor Cost 0

Other Direct Costs 0

Subcontracting

Subcontracting Total Cost 0

Materials

Material Total Cost 0

Equipment

Equipment Total Cost 0

Total ODC Costs 0

SUBTOTAL Direct Cost and ODC 0

G&A 0% 0

Total Task Total without Fee 0

File details come from the government source that posted it. Updated .