Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.pdf
PDF 112 KB Posted
- Solicitation number
- W912P9-16-R-0002
About this file
Revised 30 Oct Cost Estimate Workbook Attachment 2 in Adobe is hereby posted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendee_Sheet.pdf | ||
| W912P9-16-R-0002-0004.pdf | ||
| Question_and_Answers_5 _48 _203 _ _213_-_221.docx | DOCX document | |
| Question_and_Answers.docx | DOCX document | |
| Appendix_A_PPQ_Coversheet.pdf | ||
| W912P9-16-R-0002-0002.pdf | ||
| W912P9-16-R-0002-0001.pdf | ||
| Attachment_4_PPQ.pdf | ||
| Attachment_4_PPQ_Cover_Page.pdf | ||
| Revised_30_Oct_Cost_Estimate_Workbook_Attachment_2.xlsx | XLSX spreadsheet | |
| D4_Frost_Ave_Sampling.docx | DOCX document | |
| SAG_for_SLS_-_October_2000.pdf | ||
| FUSRAP_St__Louis_QAPP_Sep_2015r2_apdf.pdf | ||
| Question_and_Answers_Posting_4_November_2015.docx | DOCX document | |
| D2_SLDS_FUSRAP_Compound.docx | DOCX document | |
| D1_SLAPS_FUSRAP_Compound.docx | DOCX document | |
| D3_Ballfields_Excavation.docx | DOCX document | |
| Question_and_Answers_for_Posting.docx | DOCX document | |
| W912P9-16-R-0002.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKSHEET
01.02.00 TASK 2 ‐ ‐ Home Office Support General Conditions
Scope: Provide Home office support effort in selected management, technical and services areas for which full time project assigned positons are not required.
Assumptions:
01.02.01 Home Office Support (NORCO)
Direct Labor
Code Job Description Hourly Rate Hours Labor Cost
" 0 0 0
" 0 0 0
" 0 0 0
Total Task Hours
Total Home Office Direct Labor Costs 0
Fringe on Home Office Labor 0% 0
Home Over head 0% 0
Total Direct Labor Cost 0
Other Direct Costs 0
Subcontracting
Subcontracting Total Cost 0
Materials
Material Total Cost 0
Equipment
Equipment Total Cost 0
Total ODC Costs 0
SUBTOTAL Direct Cost and ODC 0
G&A 0% 0
Total Task Total without Fee 0
WORKSHEET
01.02.00 TASK 2 ‐ ‐ Home Office Support General Conditions
Scope: Provide Home office support effort in selected management, technical and services areas for which full time project assigned positions are not required.
Assumptions:
01.02.02 Home Office Support St. Louis Downtown Site (SLDS)
Direct Labor
Code Job Description Hourly Rate Hours Labor Cost
" 0 0 0
" 0 0 0
" 0 0 0
Total Task Hours
Total Field Office Direct Labor Costs 0
Fringe on Direct Labor 0% 0
Field Over head 0% 0
Total Direct Labor Cost 0
Other Direct Costs 0
Subcontracting
Subcontracting Total Cost 0
Materials
Material Total Cost 0
Equipment
Equipment Total Cost 0
Total ODC Costs 0
SUBTOTAL Direct Cost and ODC 0
G&A 0% 0
Total Task Total without Fee 0
File details come from the government source that posted it. Updated .