W912P821B0047_Bid Abstract 11 Aug 2021.pdf

PDF 1 MB Posted

Attached to
Multiple WSLP Access Roads
Solicitation number
W912P821B0047
Issued by

About this file

This is a bid abstract for a federal construction contract solicitation. The solicitation is for clearing, grading, and construction of seven aggregate roads and numerous culverts for access to the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project in St. John the Baptist and St. Charles Parishes, Louisiana. The work also includes asphalt paving. The contract value is between $10-25 million. Bids were due on July 6, 2021 and were opened on August 11, 2021. Nine contractors submitted bids ranging from $11.7-13.2 million. The apparent low bid was submitted by Lemoine-Frazier JV LLC for $13,168,619.40. The solicitation required a bid bond and payment and performance bonds will be required upon award. The soliciting agency is the US Army Corps of Engineers New Orleans District.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Lemoine -Frazier JV LLC, Lafayette, LA $13,168,619.40

2. J. Caldarera & Company, Inc., Laplace, LA $12,980,584.00

3. Silver Mountain Construction, LLC, Knoxville, TN $17,553,601.94

4. Onshore Materials, LLC, Thibodaux, LA $15,685,854.50

5. Cycle Construction Company, LLC, Kenner, LA $13,993,361.00

6. Durr Heavy Construction, LLC, Harahan, LA $16,265,367.20

7. Greenup Industries, LLC, Kenner, LA $15,969,094.75

8. Gulf South Piling & Construction, Inc $14,557,602.36

9. Justin Reeves, Construction, LLC, Houma, LA $11,689,631.20

Multiple West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Access Roads Construction Project, St. John the Baptist and St. Charles Parishes, Louisiana (ED 20-019)

SOLICITATION NO. W912P821B0047

2. DATE ISSUED 3. DATE OPENED

6/4/2021

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Roads A, B, C, and F (Sta. 0+00 to Sta. 57+20)

ITEM

0001 Mobilization and Demobilization 1 JB $215,210.00 $215,210.00 $290,000.00 $290,000.00 $250,000.00 $250,000.00 $489,822.00 $489,822.00

0002 Temporary Retaining Structures 1 JB $334,000.00 $334,000.00 $70,200.00 $70,200.00 $100,000.00 $100,000.00 $29,762.00 $29,762.00

0003 Traffic Control and Coordination 1 JB $449,000.00 $449,000.00 $46,800.00 $46,800.00 $30,000.00 $30,000.00 $39,650.00 $39,650.00

0004 Truck Wash-Down Rack 4 EA $25,550.00 $102,200.00 $33,426.90 $133,707.60 $8,000.00 $32,000.00 $37,500.00 $150,000.00

0005 Traffic Signage 1 JB $10,000.00 $10,000.00 $32,175.00 $32,175.00 $10,000.00 $10,000.00 $4,655.00 $4,655.00

0006 Separator Geotextile 104,317 SY $4.40 $458,994.80 $6.00 $625,902.00 $3.00 $312,951.00 $4.00 $417,268.00

0007 Geogrid 60,530 SY $7.60 $460,028.00 $7.00 $423,710.00 $4.50 $272,385.00 $5.30 $320,809.00

0008 Clearing and Grubbing 18.5 AC $16,500.00 $305,250.00 $7,800.00 $144,300.00 $6,000.00 $111,000.00 $77,310.00 $1,430,235.00

0009 Dewatering 1 JB $50,318.00 $50,318.00 $19,500.00 $19,500.00 $100,000.00 $100,000.00 $23,200.00 $23,200.00

0010 Embankment Fill 31 TON $19.00 $589.00 $48.75 $1,511.25 $25.00 $775.00 $17.40 $539.40

0011 Sand Fill 23,170 TON $29.00 $671,930.00 $11.00 $254,870.00 $25.00 $579,250.00 $17.40 $403,158.00

0012 Asphaltic Pavement 252 TON $160.00 $40,320.00 $390.00 $98,280.00 $125.00 $31,500.00 $232.00 $58,464.00

0013 Surfacing 38,375 TON $59.60 $2,287,150.00 $50.00 $1,918,750.00 $60.00 $2,302,500.00 $44.00 $1,688,500.00

0014 Fencing and Gates 1 JB $13,470.00 $13,470.00 $6,094.00 $6,093.75 $10,000.00 $10,000.00 $11,600.00 $11,600.00

Turf Establishment and Maintenance

0.5 AC $5,320.00 $2,660.00 $6,825.00 $3,412.50 $10,000.00 $5,000.00 $5,235.00 $2,617.50

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

0016 24-Inch Corrugated Metal Pipe 548 LF $93.00 $50,964.00 $150.15 $82,282.20 $150.00 $82,200.00 $294.00 $161,112.00

0017 48-Inch Corrugated Metal Pipe 368 LF $172.00 $63,296.00 $194.05 $71,410.40 $300.00 $110,400.00 $516.00 $189,888.00

TOTAL $5,515,379.80 $4,222,904.70 $4,339,961.00 $5,421,279.90

OPTIONAL WORK 1 (OW1)

ROAD P

Optional

Mobilization and Demobilization -

OW 1

1 JB $102,370.00 $102,370.00 $9,750.00 $9,750.00 $100,000.00 $100,000.00 $49,900.00 $49,900.00

Optional

Traffic Control and Coordination -

OW1

1 JB $158,840.00 $158,840.00 $11,700.00 $11,700.00 $30,000.00 $30,000.00 $1,750.00 $1,750.00

Optional

Truck Wash-Down Rack - OW1 1 EA $26,940.00 $26,940.00 $33,426.90 $33,426.90 $8,000.00 $8,000.00 $47,400.00 $47,400.00

Optional

Separator Geotextile - OW1 16,900 SY $4.40 $74,360.00 $6.00 $101,400.00 $3.00 $50,700.00 $4.75 $80,275.00

Optional

Geogrid - OW1 51,600 SY $7.60 $392,160.00 $7.00 $361,200.00 $4.50 $232,200.00 $5.25 $270,900.00

Optional

Clearing and Grubbing – OW1 5.72 AC $30,020.00 $171,714.40 $7,800.00 $44,616.00 $20,000.00 $114,400.00 $21,300.00 $121,836.00

Optional

Sand Fill - OW1 20,305 TON $29.00 $588,845.00 $11.00 $223,355.00 $25.00 $507,625.00 $21.50 $436,557.50

Optional

Asphaltic Pavement - OW1 101 TON $160.00 $16,160.00 $390.00 $39,390.00 $125.00 $12,625.00 $204.00 $20,604.00

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

Optional

Surfacing - OW1 9,750 TON $60.00 $585,000.00 $50.00 $487,500.00 $62.00 $604,500.00 $46.00 $448,500.00

Optional

Fencing and Gates - OW1 1 JB $1,531.00 $1,531.00 $6,093.75 $6,093.75 $6,000.00 $6,000.00 $4,000.00 $4,000.00

Optional

24-Inch Corrugated Metal Pipe -

OW1

513 LF $93.00 $47,709.00 $150.15 $77,026.95 $150.00 $76,950.00 $260.00 $133,380.00

TOTAL OW 1 $2,165,629.40 $1,395,458.60 $1,743,000.00 $1,615,102.50

OPTIONAL WORK 2 (OW 2)

ROAD S

Optional

Mobilization and Demobilization –

OW2

1 JB $90,260.00 $90,260.00 $9,750.00 $9,750.00 $100,000.00 $100,000.00 $56,300.00 $56,300.00

Optional

Traffic Control and Coordination –

OW2

1 JB $181,600.00 $181,600.00 $11,700.00 $11,700.00 $20,000.00 $20,000.00 $4,500.00 $4,500.00

Optional

Truck Wash-Down Rack - OW2 1 EA $28,100.00 $28,100.00 $33,426.90 $33,426.90 $8,000.00 $8,000.00 $87,000.00 $87,000.00

Optional

Separator Geotextile - OW2 29,900 SY $4.40 $131,560.00 $6.00 $179,400.00 $3.00 $89,700.00 $4.00 $119,600.00

Optional

Geogrid - OW2 62,600 SY $7.60 $475,760.00 $7.00 $438,200.00 $4.50 $281,700.00 $5.30 $331,780.00

Optional

Clearing and Grubbing – OW2 0.5 AC $8,500.00 $4,250.00 $7,800.00 $3,900.00 $10,000.00 $5,000.00 $52,400.00 $26,200.00

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

Optional

Embankment Fill - OW2" 6,795 TON $18.50 $125,707.50 $46.00 $312,570.00 $30.00 $203,850.00 $20.00 $135,900.00

Optional

Sand Fill – OW2 15,200 TON $28.70 $436,240.00 $11.00 $167,200.00 $25.00 $380,000.00 $19.50 $296,400.00

Optional

Asphaltic Pavement – OW2 81 TON $160.00 $12,960.00 $390.00 $31,590.00 $125.00 $10,125.00 $231.00 $18,711.00

Optional

Surfacing – OW2 16,350 TON $60.00 $981,000.00 $50.00 $817,500.00 $62.00 $1,013,700.00 $45.00 $735,750.00

Optional

Fencing and Gates – OW2 1 JB $23,100.00 $23,100.00 $6,093.75 $6,093.75 $6,000.00 $6,000.00 $4,070.00 $4,070.00

Optional

Turf Establishment and Maintenance - OW2)

0.5 AC $5,320.00 $2,660.00 $6,825.00 $3,412.50 $10,000.00 $5,000.00 $5,235.00 $2,617.50

Optional

24-Inch Corrugated Metal Pipe –

OW2

233 LF $93.00 $21,669.00 $150.15 $34,984.95 $150.00 $34,950.00 $292.00 $68,036.00

TOTAL OW 2 $2,514,866.50 $2,049,728.10 $2,158,025.00 $1,886,864.50

OPTIONAL WORK 3 (OW3)

ROAD G

Mobilization and Demobilization –

OW3

1 JB $98,820.00 $98,820.00 $9,750.00 $9,750.00 $100,000.00 $100,000.00 $61,400.00 $61,400.00

Traffic Control and Coordination –

OW3

1 JB $262,190.00 $262,190.00 $11,700.00 $11,700.00 $20,000.00 $20,000.00 $5,235.00 $5,235.00

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

0044 Truck Wash-Down Rack - OW3 1 EA $20,940.00 $20,940.00 $33,426.69 $33,426.69 $8,000.00 $8,000.00 $54,000.00 $54,000.00

0045 Traffic Signage - OW3 1 JB $7,440.00 $7,440.00 $7,995.00 $7,995.00 $10,000.00 $10,000.00 $5,800.00 $5,800.00

0046 Separator Geotextile - OW3 19,813 SY $4.40 $87,177.20 $6.00 $118,878.00 $3.00 $59,439.00 $4.00 $79,252.00

0047 Geogrid - OW3 25,600 SY $7.60 $194,560.00 $7.00 $179,200.00 $4.50 $115,200.00 $5.25 $134,400.00

0048 Clearing and Grubbing – OW3 6.5 AC $17,230.00 $111,995.00 $7,800.00 $50,700.00 $10,000.00 $65,000.00 $19,775.00 $128,537.50

0049 Embankment Fill – OW3" 33 TON $19.00 $627.00 $46.00 $1,518.00 $30.00 $990.00 $19.00 $627.00

0050 Sand Fill – OW3 10,320 TON $29.00 $299,280.00 $11.00 $113,520.00 $25.00 $258,000.00 $17.00 $175,440.00

0051 Asphaltic Pavement – OW3 810 TON $160.00 $129,600.00 $390.00 $315,900.00 $125.00 $101,250.00 $155.00 $125,550.00

0052 Surfacing – OW3 12,510 TON $60.00 $750,600.00 $50.00 $625,500.00 $62.00 $775,620.00 $47.00 $587,970.00

0053 Pavement Markings - OW3 1 JB $20,670.00 $20,670.00 $7,020.00 $7,020.00 $10,000.00 $10,000.00 $5,800.00 $5,800.00

0054 Fencing and Gates – OW3 1 JB $9,390.00 $9,390.00 $6,093.75 $6,093.75 $6,000.00 $6,000.00 $5,235.00 $5,235.00

Turf Establishment and Maintenance – OW3

1.5 AC $4,620.00 $6,930.00 $6,825.00 $10,237.50 $10,000.00 $15,000.00 $5,235.00 $7,852.50

24-Inch Corrugated Metal Pipe –

OW3

357 LF $93.00 $33,201.00 $150.15 $53,603.55 $150.00 $53,550.00 $290.00 $103,530.00

48-Inch Corrugated Metal Pipe -

OW3

109 LF $172.00 $18,748.00 $194.05 $21,151.45 $300.00 $32,700.00 $500.00 $54,500.00

TOTAL OW3 $2,052,168.20 $1,566,193.94 $1,630,749.00 $1,535,129.00

OPTIONAL WORK 4 (OW4)

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

Road F (Sta. 57+20 to Sta. 107+20)

Mobilization and Demobilization –

OW4

1 JB $84,800.00 $84,800.00 $9,750.00 $9,750.00 $100,000.00 $100,000.00 $39,900.00 $39,900.00

0059 Separator Geotextile – OW4 16,613 SY $4.40 $73,097.20 $6.00 $99,678.00 $3.00 $49,839.00 $4.00 $66,452.00 0060 Geogrid – OW4 16,800 SY $7.60 $127,680.00 $7.00 $117,600.00 $4.50 $75,600.00 $5.25 $88,200.00 0061 Clearing and Grubbing – OW4 5.5 AC $17,840.00 $98,120.00 $7,800.00 $42,900.00 $10,000.00 $55,000.00 $20,000.00 $110,000.00 0062 Sand Fill – OW4 5,120 TON $29.00 $148,480.00 $11.00 $56,320.00 $25.00 $128,000.00 $17.50 $89,600.00 0063 Surfacing – OW4 8,661 TON $60.00 $519,660.00 $50.00 $433,050.00 $62.00 $536,982.00 $45.00 $389,745.00 0064 Dewatering – OW4 1 JB $50,220.00 $50,220.00 $19,500.00 $19,500.00 $80,000.00 $80,000.00 $19,000.00 $19,000.00

Temporary Retaining Structures –

OW4

1 JB $333,700.00 $333,700.00 $70,200.00 $70,200.00 $75,000.00 $75,000.00 $30,000.00 $30,000.00

48-Inch Corrugated Metal Pipe –

OW4

444 LF $172.00 $76,368.00 $194.05 $86,158.20 $300.00 $133,200.00 $440.00 $195,360.00

TOTAL OW 4 $1,512,125.20 $935,156.20 $1,233,621.00 $1,028,257.00

OPTIONAL WORK 5 (OW5)

Mobilization and Demobilization –

OW5

1 JB $110,000.00 $110,000.00 $9,750.00 $9,750.00 $100,000.00 $100,000.00 $49,900.00 $49,900.00

Traffic Control and Coordination –

OW5

1 JB $445,000.00 $445,000.00 $11,700.00 $11,700.00 $20,000.00 $20,000.00 $5,235.00 $5,235.00

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

0069 Truck Wash-Down Rack – OW5 1 EA $48,870.00 $48,870.00 $33,426.90 $33,426.90 $8,000.00 $8,000.00 $60,600.00 $60,600.00 0070 Traffic Signage – OW5 1 JB $640.00 $640.00 $7,995.00 $7,995.00 $5,000.00 $5,000.00 $2,900.00 $2,900.00 0071 Separator Geotextile – OW5 21,700 SY $4.40 $95,480.00 $6.00 $130,200.00 $3.00 $65,100.00 $4.00 $86,800.00 0072 Geogrid – OW5 33,600 SY $7.60 $255,360.00 $7.00 $235,200.00 $4.50 $151,200.00 $5.25 $176,400.00 0073 Clearing and Grubbing – OW5 7 AC $15,390.00 $107,730.00 $7,800.00 $54,600.00 $10,000.00 $70,000.00 $19,700.00 $137,900.00 0074 Embankment Fill – OW5 22 TON $19.00 $418.00 $48.75 $1,072.50 $30.00 $660.00 $17.50 $385.00 0075 Sand Fill – OW5 14,090 TON $29.00 $408,610.00 $11.00 $154,990.00 $25.00 $352,250.00 $17.50 $246,575.00 0076 Asphaltic Pavement – OW5 61 TON $160.00 $9,760.00 $390.00 $23,790.00 $125.00 $7,625.00 $278.00 $16,958.00 0077 Surfacing – OW5 12,000 TON $60.00 $720,000.00 $50.00 $600,000.00 $62.00 $744,000.00 $45.00 $540,000.00 0078 Fencing and Gates – OW5 1 JB $7,280.00 $7,280.00 $6,093.75 $6,093.75 $6,000.00 $6,000.00 $4,100.00 $4,100.00 0079 Dewatering - OW5 1 JB $50,220.00 $50,220.00 $19,500.00 $19,500.00 $80,000.00 $80,000.00 $37,800.00 $37,800.00

Temporary Retaining Structures -

OW5

1 JB $333,700.00 $333,700.00 $70,200.00 $70,200.00 $75,000.00 $75,000.00 $30,000.00 $30,000.00

24-Inch Corrugated Metal Pipe –

OW5

523 LF $93.00 $48,639.00 $150.15 $78,528.45 $150.00 $78,450.00 $227.00 $118,721.00

48-Inch Corrugated Metal Pipe –

OW5

249 LF $172.00 $42,828.00 $194.05 $48,318.45 $300.00 $74,700.00 $485.00 $120,765.00

TOTAL OW5: $2,684,535.00 $1,485,365.05 $1,837,985.00 $1,635,039.00

OPTIONAL WORK 6 (OW6)

DATE SIGNED

11-Aug-21

7A. ITEM 7C. EST. D. UNIT F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED F. UNIT G. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED

B. OFFEROR: Lemoine-Frazier JV LLC, 140 Rue Beauregard, Suite D, Lafayette, LA 70508

NO. 3

C. AMENDMENTS ACKNOWLEDGED

6(Including Profit)

7B. DESCRIPTION OF OFFERED ITEM

SMALL BUSINESS SET-A-SIDE

B. BID SECURITY (Type and amount)

Multiple WSLP, HSDRR Project Access Roads (Check A, B or C and complete D, E, F and G) NO. 1 NO. 2

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

A. HIRED LABOR B. OFFEROR: Justin J. Reeves, LLC, 7836 Park Avenue, Houma, LA 70364

B. OFFEROR: J. Caldarera & Company, Inc., 201 Woodland Drive, Lapalce, LA 70068

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER : W912P821B0047

8/11/2021

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, NOD

Melissa A. Vaughn

Veronica F. Garner-Flint

7400 Leake Avenue

New Orleans, LA 70118

ROAD B AND C (ADDITIONAL

ROAD EASEMENT AREAS)

0083 Separator Geotextile – OW6 570 SY $4.40 $2,508.00 $6.15 $3,505.50 $3.00 $1,710.00 $4.00 $2,280.00 0084 Geogrid – OW6 770 SY $7.60 $5,852.00 $7.80 $6,006.00 $4.50 $3,465.00 $5.25 $4,042.50 0085 Clearing and Grubbing – OW6 0.2 AC $28,420.00 $5,684.00 $7,800.00 $1,560.00 $10,000.00 $2,000.00 $94,225.00 $18,845.00 0086 Surfacing – OW6 364 TON $60.00 $21,840.00 $56.19 $20,453.16 $62.00 $22,568.00 $45.00 $16,380.00 0087 Sand Fill – OW6 300 TON $29.00 $8,700.00 $11.00 $3,300.00 $25.00 $7,500.00 $18.00 $5,400.00

TOTAL OW6 $44,584.00 $34,824.66 $37,243.00 $46,947.50

$16,489,288.10 $11,689,631.25 $12,980,584.00 $13,168,619.40TOTAL:

2021-08-11T15:09:51-0500
GARNER- FLINT.VERONICA.FAYE.1230833504

File details come from the government source that posted it. Updated .