This document provides details on a federal solicitation for multiple water supply line project access roads. The United States Army Corps of Engineers New Orleans District is seeking bids for clearing, grading, construction of seven aggregate roads, installation of culverts, and asphalt paving. The work magnitude is estimated between $10-25 million. Bids are due by July 6, 2021 at 1:00pm CST and will be conducted virtually. A bid bond and payment and performance bonds will be required after award as stipulated in the forthcoming invitation for bid expected to publish in June 2021.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Access Roads Construction Project, St. John the Baptist and St. Charles Parishes, Louisiana has been amended to:

1. Make changes to drawings Nos. C-107, C-121, and DT-102.

2. Provide answers to Industry Questions as shown on the attached "WSLP Access Roads Questions and Answers".

3. The Bid Opening currently scheduled for Tuesday, 3 August 2021 at 1:00 PM CST has been changed to Friday, 6 August 2021 at 11:00 a.m. CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:00 AM CST, which is the bid receipt cutoff time. All bids received after 10:00 AM CST on Friday, 6 August 2021 will be considered late.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P821B0047

X 9B. DATED (SEE ITEM 11)

04-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2021

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

(See continuation pages)

DRAWINGS

SHEET IDENTIFICATION Nos C-107, C-121, and DT-102. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos C-107, C- 121, and DT-102 therefore.

W912P821B0047

TOP EL. OF ROAD

EXISTING GROUND

CC1CC2

AGGREGATE ROAD TYPICAL SECTION 2 AGGREGATE ROAD TYPICAL SECTION 2

SEE DETAIL ON SHEET DT-105

CULVERT CROSS SECTION 1

SEE DETAIL ON SHEET DT-105

CULVERT CROSS SECTION 1

1V:10H

G-027

G-039

G-038

G-037

G-041

G-021

G033

G-032

G-034

G-031

G-019

G-040

G-035

G-030

ACCESS ROAD C

4a

4b

4c

4d 4e

60a

60b

60c

60d

60e

5a 5b

5c 5d

5e

59a

59b

59c59d 59e

NEW CULVERT CC2

NEW CULVERT CC1

1V:23.5H

1V:15H

1V:20H 1V:20H

1V:26H 1V:40H

N-082

O-081

EASMENT/TNWA C3

ADDITIONAL ROAD

TNWA C1

EASMENT/TNWA C2

ADDITIONAL ROAD

200'0 100'

SCALE:1"=100'

H -8

-4

C -1

.d g n P

L A

N A

N D

P R

O F

IL

E

V

IE

W A

C C

E S

S R

O A

D C

C-107

S H

E E

T C -1

M A T

C H

L

IN

E

N O

R T

H

P L

A N

ST. JOHN THE BAPTIST PARISH, LA

.5

.8

.3

C /L S

T A .6

L

IM

IT

O

F W

O R

K

:1

CENTERLINE

PLAN VIEW

PROFILE VIEW

S H

E E

T C

-1

M A

T C

H L

IN

E

C /L

S T

A

.6

L

IM

IT

O

F W

O R

K

COORDINATION WITH THE PIPELINE COMPANY AT THE TIME OF THE LA ONE CALL SUFFCIENT

EXISTING PIPELINE MARKERS CAN BE REMOVED/RELOCATED IN THE FIELD AFTER 2.

WHERE THE SLOPE MAY APPEAR TO BE STEEP DUE TO THE VERTICAL SKEW OF THE PROFILE.

SLOPE MEASUREMENTS IN THE PROFILE ARE APPROXIMATE AND SHOWN IN AREAS1.

NOTE:

R E

V

IS

E D

T E

X T

P

O

IN

T S

A

N D

A D

D E

D T

A B

L E

-2

-2

M O

D

IF

IE

D

P O

IT

S

A

N D

A

N D

A C

R E

A G

E -2

-2

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D

A T

E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

A P

P R

®of Engineers

US Army Corps

ID

Sheet of Engineers

US Army Corps

A N

S I

D

W P

-2

-B

-0

W

P

-X

B .A

.M

M A

B

L A

U R

E N

H H

A T

T E

N P

.E

H -8

-4

B R

IA

N

R J O

H N

S O

N

S T

C

H A

R L

E S

P A

R

IS

H L

A

B O

N N

E T

C A

R R

E S

T O

C K

P

IL

E C

O N

T R

A C

T

R

IS

K R

E D

U C

T

IO

N P

R O

J E

C T

H U

R R

IC

A

N E

A N

D S

T O

R M

D A

M A

G

W

S T

S H

O R

E L

A K

E P

O N

T C

H A

R T

R A

IN

L

O U

IS

IA

N A

S E

P T

E M

B E

R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

N E

W O

R L

E A

N S

D

IS

T R

IC

T

N E

W O

R L

E A

N S

L

O U

IS

IA

N A

NEW ORLEANS DISTRICT

J U

L Y

-10

74+0075+0076+0077+0078+0079+0080+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+00

-10

W912P821B0047

W912P821B0047

WSLP Access Roads Questions and Answers

1. Can we have better directions or points of reference for the access points of the access roads where they intersect major roads or highways?

USACE response: See approximate latitude and longitude points below from Google Maps. A site visit is highly recommended.

Road A: 30.075908, ‐90.624749 Road B: 30.076363, ‐90.606155 Road C: 30.076683, ‐90.587691 Road D: 30.076841, ‐90.578861 Road F: 30.077489, ‐90.545597 Road G: 30.099654, ‐90.478729 Road P: 30.090792, ‐90.440052 Road S: 30.036626, ‐90.435109

2. Is crushed concrete allowed?

USACE Response: No.

3. Who is the Corps contact person to gain access to the project sites for review before the bid?

USACE Response: Mr. Jerome Boudreaux 504‐329‐3319 or Mr. Robert Guillot 504‐628‐5092.

4. What is considered “PERMISSIBLE WORK HOURS”?

USACE response: See specification Section 01100, paragraph 10, Permissible Hours of Work. These are the allowable work hours and days that are available to the contractor to perform work.

5. We assume that signage is required at each site. Is this correct?

USACE Response: A project sign is required at each access road. Traffic control signs are required at each access road in accordance with your traffic control plan.

6. Do any of these areas have eagle nesting sites that we should be concerned about?

USACE response: No.

W912P821B0047

7. On the access roads that agricultural activities will shut down the work. Who pays for any repairs that might be needed?

USACE response: Payment will be made at the contract unit price for crushed stone for placement of additional stone on the roads for repairs.

8. The job has a very specific requirement for the Inspector’s Field Office with numerous amenities and services, and also fencing, but there is no specific pay item. Will one please be added with the next Amendment (to answer these questions)?

USACE response: No. Include the cost in mobilization and demobilization.

9. There is no time extension for the Options, but they will likely extend the duration of the field office within the Project time. If a price is added can it be by time (i.e. month) and not JOB?

USACE response: No. All costs for the field offices shall include the entire contract duration.

10. Will constant supervision and verified light loads be required at the Road A pipeline crossing per the Special Work Requirement?

USACE response: Yes. The weight restrictions and supervision apply to ALL pipeline crossings not just Road A. At some point, every access road crosses pipelines, so the contractor must supervise these crossings and adhere to the weight restrictions when crossing over these pipelines on all roads.

11. The Special Work Requirements also indicate the contractor shall employ a flagger during cane season: if this can be coordinated by other means without a flagger is that acceptable?

USACE response: Any suggested changes would have to be discussed with the Administrative Contracting Officer. The intent of the flagger is to control the traffic safely and efficiently during road construction with the traffic generated during the cultivation of the adjacent sugar cane fields.

12. As the trucking required for this project based on the number of roads and duration of the contract with options included, large tandem trucks will be required to meet the schedule. There are no provisions for large truck turn arounds in the bid documents. Is it then intent that these trucks will be required to “BACK IN” in most cases to unload or it is up the GC to create turn arounds as needed throughout the construction process? Example of

W912P821B0047 this scenario is at Road “P”. Road “P” is being created in a virgin swamp/ marsh and trucks will not be able to turn around without major construction cost to create them. Also, many of the roads in confined areas such as Roads A, C, D, and F of the base bid, will require encroachment onto adjacent farmland, swamp land and structures to turn around. I assume access road “A” is still owned by wildlife and Fisheries. Please review this scenario and advise.

USACE response: The contractor shall always stay within the designated right‐of‐way limits. You are not allowed to travel or construct features outside the right‐of‐way. After reviewing the right‐of‐way limits, determine your construction methods. Note that additional right‐of‐way is available where culverts will be installed beneath the access roads. Some alternatives to conventional dump trucks include large front‐end loaders and tracked dump trucks that can maneuver within the right‐of‐way limits.

13. Please provide details and specifications for the “Ground Penetrating Radar” added to the project bid at Road “G”. Also, what Bid line items are we to add this cost in the Road “G” bid form? Please advise.

USACE response: As a first order of work on Road G, the contractor shall employ the services of a company that regularly engages in locating underground utilities. The contractor shall mark the location of the fiber optic and sewer line in the field where these lines cross the new access road. The contractor shall also provide the depth of each line below the ground surface. The location and depths of each line shall be surveyed, and this information shall be immediately provided to USACE and included on the as‐built drawings. Payment shall be included the cost for mobilization and demobilization.

14. We have noticed at other current USACE projects in this area, Police Traffic Control is in place on US Highway 61. Is this required for all new roads coming in and out of US 61 and US 55 since they are “US” highways? For which Roads will Police Control be required for this project? Please advise.

USACE response: We are not specifically requiring police vehicles at the entrances to the new access roads. Any requirements for traffic control shall be as specified by your traffic engineer and shown on your traffic control plan.

W912P821B0047

15. Is there an order that the Roads are to be constructed in the base Bid such as A and then B then C and finish with F? Please advise.

USACE response: See specification Section 01100, paragraph 21, Order of Work (B, C, A, F). You can work on more than one road at a time.

16. Is there an order that the Option roads are to be constructed if all options are accepted? Please advise.

USACE response: No.

17. Can USACE take the OW 1 thru OW 6 in any order? Such as, can they accept option 2, 4 and 6 without taking 1, 3 and 5? Please advise.

USACE response: Options can be awarded in any order and quantity.

18. In Amendment 2, there are 79 revised and or new drawings issued. These drawings, in some cases duplicate themselves in the attachments in Amendment # 2 which is confusing. One example of this is Revised drawing C‐113 is in the attachment Part II‐ 2 of 4 and then again in Part II – 3 of 4 in Amendment 2 and there are many other drawings like this duplicated in Attachments. Is there some reason there are duplicate drawings in Amendment # 2? Is it possible to consolidate all drawings into clean one set of finalized “Issued for Bid” drawings?

USACE response: We are aware that drawings were duplicated in the electronic files that were posted to Sam.gov. Simply ignore the duplicate drawings. At this time, we will not be issuing another set of drawings.

19. Can we drone the property?

USACE response: Follow the regulations for operating a drone.

20. Is the GC furnished Trailer for USACE use with hookups at the I‐10 Weigh Station the only office USACE will need regardless of the options accepted?

Please advise.

USACE response: One office for the exclusive use of Government employees shall be provided for the entire contract duration. Specification Section 01100, paragraph 4, Inspector’s Field Office, requires the office trailer to be located at Road F. In lieu of an office trailer, the contractor may rent commercial office space within the Laplace area to satisfy this requirement.

W912P821B0047

21. We respectfully request an extension the bid date from Tuesday 8‐2‐2021 to at least one work week later.

USACE response: Any changes to the bid opening date will be posted to Sam.gov.

22. The USACE apparently in answering question 5 offered use of the Spillway at Contractor’s risk: but will it still be required to be by the ton?

USACE response: Yes.

Am_0004_WSLP Access Roads Construction Project_Ed 20-019.pdf
ENCL Amend 03_WSLP Access Roads 26 July21.pdf
H-8-48287_C-107
H-8-48287_C-121
H-8-48287_DT-102

File details come from the government source that posted it. Updated .