20230522 Amendment 05 - Corrosion Control.docx

DOCX document 17 KB Posted

Attached to
ADAL Corrosion Control
Solicitation number
W912LM23R1000
Issued by

About this file

This document contains an amendment to a request for proposal for corrosion control renovation services. The amendment provides responses to contractor questions, clarifying that assembled equipment will be contractor installed but using non-union labor. Acceptable pipe insulation alternatives are also specified, and compressed air piping material is identified. The closing date is unchanged. Contractors must acknowledge this amendment when submitting proposals. The related opportunity posted by the Minnesota Army National Guard seeks proposals for corrosion control renovation at the 133rd Airlift Wing in Saint Paul, Minnesota, with a magnitude between $1,000,000 to $5,000,000. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $45 million in average annual receipts.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF PROPOSED TASK ORDER

REQUEST FOR PROPOSAL

Amendment 05

DATE: 22 May 2023

PROJECT TITLE & NUMBER:Corrosion Control
PN: QJKL149550

1. This amendment is being issued to answer questions.

Do we have cut sheets or a list of connections for the GFCI equipment? As the mechanical contractor what would we be responsible for? Are these pre-assembled skids or is additional set up involved?

Repsonse: The Government Furnished Contractor Installed units are to be assembled by supplier not the contractor but will be limited to non-union labor. Installation of the equipment to supporting utilities such as duct work, electrical, gas, etc. are within contractor’s scope.

Would 1" or 1 1/2" pre-molded fiberglass jacketed pipe insulation be an acceptable alternative for the rainwater pipe insulation as we have used on other projects on this Base? In my opinion, cellular glass and Polyiso are not very good choices for rainwater insulation. Using 1/2" closed cell may not provide enough insulation on larger pipes.

Response: Follow specs and if a no cost change, can bring up during the submittal process.

Please specify what type of piping material is to be used for the compressed air piping as the Specifications do not call out what kind of piping material to use.

Response: Section 20 05 13, par. 3.08 Pipe schedule Compressed air ASTM B88 Hard-Drawn Copper (ACU1) or ASTM A53 Gr. B Steel (ACS6). Where multiple Pipe Class Specifications are specified, selection of material is at Contractor’s option.

2. With this amendment the closing date will not be extended: