20230501 Amendment 01 - Corrosion Control.docx
DOCX document 16 KB Posted
- Attached to
- ADAL Corrosion Control
- Solicitation number
- W912LM23R1000
About this file
This notice amends a request for proposal for corrosion control renovation services. The project is a small business set-aside between $1 million to $5 million for the 133rd Airlift Wing in Saint Paul, Minnesota. An alternate epoxy product may be used besides the specified Tennant epoxy as long as it meets the system properties and chemical resistance specified. The closing date is not extended by this amendment. Offerors must acknowledge any amendments when submitting proposals. The solicitation is from the Department of the Army Minnesota Army National Guard for corrosion control services at the specified location. A pre-proposal conference will be held on May 4th with a site visit following. Award will be made based on best value as outlined in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20230522 Amendment 05 - Corrosion Control.docx | DOCX document | |
| 20230522 Geotech report.pdf | ||
| 20230512 Amendment 04 - Corrosion Control.docx | DOCX document | |
| 20230512 Amendment 03 - Corrosion Control.docx | DOCX document | |
| 20230509 Amendment 02 - Corrosion Control.docx | DOCX document | |
| 20230508 Corrosion Control Signin.pdf | ||
| 20230509 Amendment 02 - Corrosion Control.docx | DOCX document | |
| EXHIBIT A Cor Ctl(Attachment).docx | DOCX document | |
| EXHIBIT B Cor Ctl Ld (Attachment).docx | DOCX document | |
| EXHIBIT D Letter of Commitment Ld Cor Ctl (Attachment).docx | DOCX document | |
| 20230417 W912LM23R1000 Corrosion Control.pdf | ||
| 20230406 Specification.pdf | ||
| EAL Request-Company-2023MMDD.xlsx | XLSX spreadsheet | |
| 20230406 QJKL149550 CorrosionControl Drawing 1 Nov 21.pdf | ||
| EXHIBIT C Reference_Questionnaire_Package Cor Ctl (Attachment).docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF PROPOSED TASK ORDER
REQUEST FOR PROPOSAL
Amendment 01
DATE: 01 May 2023
| PROJECT TITLE & NUMBER: | Corrosion Control |
| PN: QJKL149550 |
1. This amendment is being issued to answer questions.
Refer to the Attached EAL Request-Company-2023MMDD
Per spec section 09 67 00, paragraph 2.1, we are to use Tennant epoxy for the fluid applied flooring. Tennant was purchased by Sherwin Williams and Eco-CEP is no longer available. Are we able to use alternate products? Specifically, can we use Resul for MPE (not available pre-tinted) or Tnemec products?
Response: Yes, an alternate product can be used as long as it complies with the System Properties and Chemical Resistance properties specified in the same paragraph quoted.
2. With this amendment the closing date will not be extended:
3. This amendment must be acknowledged when submitting your proposal.