20230509 Amendment 02 - Corrosion Control.docx
DOCX document 16 KB Posted
- Attached to
- ADAL Corrosion Control
- Solicitation number
- W912LM23R1000
About this file
This amendment to a request for proposal provides clarification on scope items and specifications for a corrosion control renovation project at a Minnesota Air National Guard facility. Key details include confirmation that toilet paper holders, sanitary napkin disposal units, and mop/broom holders are excluded from the contract scope and will be provided by the base. The amendment also specifies an increased minimum thickness of 72 mil for the TPO membrane and notes the closing date will remain unchanged despite the amendment. The related federal contract opportunity solicits fixed-price proposals for the corrosion control renovation project, which is set aside for small businesses with a revenue size standard of $45 million. The project value is estimated between $1 million to $5 million to be awarded by the Department of the Army Minnesota Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20230522 Amendment 05 - Corrosion Control.docx | DOCX document | |
| 20230522 Geotech report.pdf | ||
| 20230512 Amendment 04 - Corrosion Control.docx | DOCX document | |
| 20230512 Amendment 03 - Corrosion Control.docx | DOCX document | |
| 20230509 Amendment 02 - Corrosion Control.docx | DOCX document | |
| 20230501 Amendment 01 - Corrosion Control.docx | DOCX document | |
| 20230508 Corrosion Control Signin.pdf | ||
| 20230406 QJKL149550 CorrosionControl Drawing 1 Nov 21.pdf | ||
| 20230417 W912LM23R1000 Corrosion Control.pdf | ||
| 20230406 Specification.pdf | ||
| EAL Request-Company-2023MMDD.xlsx | XLSX spreadsheet | |
| EXHIBIT A Cor Ctl(Attachment).docx | DOCX document | |
| EXHIBIT B Cor Ctl Ld (Attachment).docx | DOCX document | |
| EXHIBIT D Letter of Commitment Ld Cor Ctl (Attachment).docx | DOCX document | |
| EXHIBIT C Reference_Questionnaire_Package Cor Ctl (Attachment).docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF PROPOSED TASK ORDER
REQUEST FOR PROPOSAL
Amendment 02
DATE: 09 May 2023
| PROJECT TITLE & NUMBER: | Corrosion Control |
| PN: QJKL149550 |
1. This amendment is being issued to answer questions.
Q1: Sheet A101A shows a washer and dryer near the cabinet blasters. They are not shown to be GFCI, but there is no equipment spec identifying what we are to provide. Please advise.
Response:: I’ll forward this to the AE.
Q2: Spec Section 10 28 00 details sanitary napkin disposal and mop and broom holders; however, these items are not identified on the plans except to show mounting heights.
Response: These will be provided and installed by base.
Q3: Drawing Sheet A130, shows toilet paper holders; however, toilet paper holders are not indication in spec section 10 28 00. Please advise if toilet paper holders are part of this contract.
Response: These will be provided and installed by base.
Response: Yes, an alternate product can be used as long as it complies with the System Properties and Chemical Resistance properties specified in the same paragraph quoted.
Please update TPO membrane minimum thickness to 72 mil (1.8 mm)
2. With this amendment the closing date will not be extended:
3. This amendment must be acknowledged when submitting your proposal.