140516_Addendum_02.pdf

PDF 16 KB Posted

Attached to
Load Crew Training and Weapons Release Shops Federal contract opportunity
Solicitation number
W912LM-17-B-0001
Issued by
Department of the Army Minnesota Army National Guard

About this file

Addendum 02 - W912LM-17-B-0001-0003-Load Crew

View the file

Other files for this federal contract opportunity

Other files attached to Load Crew Training and Weapons Release Shops, newest first.
File Type Posted
Addendum_02_Specs.pdf PDF
W912LM-17-B-0001-0003_-_Load_Crew_Training_&_Weapons_Release_Shops.pdf PDF
RELOADED_-_Addendum_01_drawings.pdf PDF
Addendum_01_-Specifications.pdf PDF
Addendum_01_-Drawings.pdf PDF
W912LM-17-B-0001-P00002_-_Load_Crew_&_Weapons_Training.pdf PDF
Questions.pdf PDF
W912LM-17-B-0001-0001_-_Conformed_Copy_for_Bidding_Purposes.doc DOC document
W912LM-17-B-0001-01-LoadCrewTraining-Amend_01.doc DOC document
WageRates-LoadCrewTrng&WeaponsReleaseShops.docx DOCX document
A_03_-_JandA-Other_Than_Full_And_Open_-_Brand_Name-Redacted.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Load Crew Training & Weapons Release Shops 5/26/2017

FMKM 089018, W912LM-17-B-0001

ADDENDUM 02 Page 1 of 1

ANSWERS TO CONTRACTOR QUESTIONS/COMMENTS:

1. Section 01 6116 VOC content restriction – review paint products used for metal ductwork and exposed ceiling members (bar joist & metal decking). These items have been problematic in the past with low VOC coatings. 2) Please consider making all exposed ductwork “paint grip” finish. This will aid in paint adhesion greatly.

Response: 1) Paint product(s) for exposed ceiling areas can be changed to product(s) that do not meet the low-VOC requirement. However, a LEED VOC Paint Budget approach will need to be used to document all paints and coatings VOCs used on the project for the LEED IEQ4.2 credit. The actual total overall VOC content for the project will need to be calculated by volume of products used.

That total which must be equal to or lower than the VOC budget total for the project if all products (by volume) reached the maximum VOC limits. Paint product substitutions must clearly identify what the new product will be replacing and where it will be used, and VOCs must be clear in the product data.

2) Refer to Spec 23 3100, 2.02C Paint Grip finish is already specified.

2. Please verify the fire rating on the plastic lockers required for this project.

Response: The HDPE lockers have a Class C fire rating, which is acceptable for this project.

CHANGES TO SPECIFICATIONS:

2-1 Section 07 2100 – Thermal Insulation, paragraph 2.02.B – Replace “Type I, aluminum foil both faces; Class 1, non-reinforced foam core.” With the following: “Type II, Class 1, cellulose felt or glass fiber mat both faces; Grade 1.”

2-2 Section 08 8000 – Glazing: at paragraph 2.03.A.4.a – change Tint from Gray to Clear.

2-3 Replace Section 08 4313 – ALUMINUM FRAMED STOREFRONTS in its entirety with attached (08 4313)

2-4 Replace Section 08 5113 – ALUMINUM WINDOWS in its entirety with attached (08 5113)

CHANGES TO DRAWINGS: None

ATTACHMENTS: 08 4313, 08 5113

End of Addendum 02