Q A 3-1-2011.docx

DOCX document 12 KB Posted

Attached to
OK MATOC IDIQ Federal contract opportunity
Solicitation number
W912L611R0004
Issued by
Department of the Army Oklahoma Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to OK MATOC IDIQ, newest first.
File Type Posted
Contractor list.xlsx XLSX spreadsheet
Q A Final Revsion.pdf PDF
Q A Final.pdf PDF
Q A 3-11-2011.docx DOCX document
Q A 3-10-2011.docx DOCX document
Q A 3-9-2011.docx DOCX document
Q A 3-8-2011 1400.docx DOCX document
Q A 3-8-2011 1200.docx DOCX document
Q A 3-8-2011.docx DOCX document
Q A 3-7-2011.docx DOCX document
Pre-Proposal Attendance List.pdf PDF
Q A 3-6-2011.docx DOCX document
Q A 3-4-2011.docx DOCX document
Q A 3-4-2011.docx DOCX document
MATOC EXHIBIT E Jan 2011.doc DOC document
RFI Sample Bldg 1033.docx DOCX document
Q A 2-25-2011.docx DOCX document
MATOC EXHIBITS A-D F and G Jan 11.doc DOC document
Sub-Contractor times.docx DOCX document
set-aside Exhibit E-1.doc DOC document
MATOC EXHIBIT E Jan 2011.doc DOC document
MATOC EXHIBIT E Jan 2011.doc DOC document
11-R-0004.pdf PDF
MATOC EXHIBITS A-D F and G Jan 11.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

What are the procedures to turn-in the RFP to get on base?

By Thursday, March 18th with employee, Driver License number, and company name.

137arw.msc@ang.af.mil What is the Period of Performance for the Bldg 1033 Project?

210 days Fed Biz ops change on 24-FEB references a change in due date. Is it the bid date that is changing?

No, the questionnaire form had the wrong date The finish schedule, sheet A-611, calls out for room 115 to have an epoxy coated floor. I cant seem to find anything in the specs on this material, also what is to be done with the existing floor?? Is there a material that needs to be removed?

The epoxy flooring is referenced in spec section 09 90 00 paragraph 3.13.2.A. The existing concrete flooring is to be prepared according to the epoxy manufacturer's installation instructions.

Sheet A-101, note 2. Calls out for a 1hr fire rated wall from the CMU to the deck. Where is the detail for this showing how many sheets of GWB will be needed on each side and the width of the wall?

The note indicates that the one hour fire barrier is for the height of the existing CMU portion of the wall. Reference General Note #2 and note on plan A-101 that states "One hour fire barrier shall be maintained to the top of the existing CMU". This note does not indicate a one hour fire rated wall from the CMU to the deck. Date of signed/sealed drawings is January 12, 2011.

Would the government allow roof mounted HVAC equipment, the new UPS project at this building has some equipment on the roof?

The HVAC units are to be relocated to the roof, see A-103 and M-201.

Is there natural gas available in this area and would gas fired equipment be acceptable?

Gas heat is required and gas is available.

Does each of the office areas require individual t-stat control ? The current system appears to have a VAV box for each office area?

Each office area does not require individual t-stat control.

Will exposed duct be allowed in the server room?

All ceiling except for the Mechanical Room have drop ceilings. No room is call out as the server room, however there is a comm closet (with a drop ceiling).