MATOC EXHIBIT E Jan 2011.doc
DOC document 33 KB Posted
- Attached to
- OK MATOC IDIQ Federal contract opportunity
- Solicitation number
- W912L611R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor list.xlsx | XLSX spreadsheet | |
| Q A Final Revsion.pdf | ||
| Q A Final.pdf | ||
| Q A 3-11-2011.docx | DOCX document | |
| Q A 3-10-2011.docx | DOCX document | |
| Q A 3-9-2011.docx | DOCX document | |
| Q A 3-8-2011 1400.docx | DOCX document | |
| Q A 3-8-2011 1200.docx | DOCX document | |
| Q A 3-8-2011.docx | DOCX document | |
| Q A 3-7-2011.docx | DOCX document | |
| Pre-Proposal Attendance List.pdf | ||
| Q A 3-6-2011.docx | DOCX document | |
| Q A 3-4-2011.docx | DOCX document | |
| Q A 3-4-2011.docx | DOCX document | |
| Q A 3-1-2011.docx | DOCX document | |
| RFI Sample Bldg 1033.docx | DOCX document | |
| Q A 2-25-2011.docx | DOCX document | |
| MATOC EXHIBITS A-D F and G Jan 11.doc | DOC document | |
| Sub-Contractor times.docx | DOCX document | |
| set-aside Exhibit E-1.doc | DOC document | |
| MATOC EXHIBIT E Jan 2011.doc | DOC document | |
| MATOC EXHIBIT E Jan 2011.doc | DOC document | |
| 11-R-0004.pdf | ||
| MATOC EXHIBITS A-D F and G Jan 11.doc | DOC document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MATOC
RFP W912L6-11-R-0004
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, PROPOSAL FORM
Date: February 7, 2011
PROJECT TITLE AND NO.: Project YZEU032022 Renovate Bldg 1033 PROJECT DESCRIPTION: Renovate Bldg 1033 MAGNITUDE OF PROJECT: Between $1,000,000 and $5,000,000.
PERFORMANCE PERIOD: 365 Days, after receipt of Notice to Proceed
SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
LIQUIDATED DAMAGES: (X) YES or ( ) NO- reference Contract Clause 52.211-12. If yes, the following amounts will be applicable to this TASK ORDER. ($396.86 per day and $153.00 per Modification).
CONSTRUCTION: (X) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.
WAGE DETERMINATION: Currently, General Decision Number OK100034 Modification No. OK34 dated 11/05/2010 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
Item
Number
Description
Lump Sum Amount
Bldg 1033 Remodel
SIGNATURE:
COMPANY NAME
Name and title of person authorized to sign
Offer Date
ACKNOWLEDGEMENT OF AMENDMENTS
The Offeror acknowledges receipt of amendments to this Task Order
Revision No.
Date
Revision No.
Date
SIGNATURE:
COMPANY NAME
Name and title of person authorized to sign
Offer Date