MATOC EXHIBIT E Jan 2011.doc
DOC document 32 KB Posted
- Attached to
- OK MATOC IDIQ Federal contract opportunity
- Solicitation number
- W912L611R0004
About this file
Exhibits E
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor list.xlsx | XLSX spreadsheet | |
| Q A Final Revsion.pdf | ||
| Q A Final.pdf | ||
| Q A 3-11-2011.docx | DOCX document | |
| Q A 3-10-2011.docx | DOCX document | |
| Q A 3-9-2011.docx | DOCX document | |
| Q A 3-8-2011 1400.docx | DOCX document | |
| Q A 3-8-2011 1200.docx | DOCX document | |
| Q A 3-8-2011.docx | DOCX document | |
| Q A 3-7-2011.docx | DOCX document | |
| Pre-Proposal Attendance List.pdf | ||
| Q A 3-6-2011.docx | DOCX document | |
| Q A 3-4-2011.docx | DOCX document | |
| MATOC EXHIBIT E Jan 2011.doc | DOC document | |
| Q A 3-4-2011.docx | DOCX document | |
| Q A 3-1-2011.docx | DOCX document | |
| RFI Sample Bldg 1033.docx | DOCX document | |
| Q A 2-25-2011.docx | DOCX document | |
| MATOC EXHIBITS A-D F and G Jan 11.doc | DOC document | |
| Sub-Contractor times.docx | DOCX document | |
| set-aside Exhibit E-1.doc | DOC document | |
| MATOC EXHIBIT E Jan 2011.doc | DOC document | |
| 11-R-0004.pdf | ||
| MATOC EXHIBITS A-D F and G Jan 11.doc | DOC document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MATOC
RFP W912L6-11-R-0004
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, PROPOSAL FORM
Date: February 7, 2011
PROJECT TITLE AND NO.: Project YZEU032022 Renovate Bldg 1033 PROJECT DESCRIPTION: Renovate Bldg 1033 MAGNITUDE OF PROJECT: Between $1,000,000 and $5,000,000.
PERFORMANCE PERIOD: 365 Days, after receipt of Notice to Proceed
SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
LIQUIDATED DAMAGES: (X) YES or ( ) NO- reference Contract Clause 52.211-12. If yes, the following amounts will be applicable to this TASK ORDER. ($396.86 per day and $153.00 per Modification).
CONSTRUCTION: (X) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.
WAGE DETERMINATION: Currently, General Decision Number OK100034 Modification No. OK34 dated 11/05/2010 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
Item
Number
Description
Lump Sum Amount
Bldg 1009 Remodel
SIGNATURE:
COMPANY NAME
Name and title of person authorized to sign
Offer Date
File details come from the government source that posted it. Updated .