CES- Rock & Pave- W912L2-19-Q-5092

QUESTIONS AND ANSWERS

Q1:Will Solicitation contain revised and clarified engineering plans?
A1:Yes, engineering plans will be part of the solicitation, and additional detailed information will beprovided as clarification.
Q2:Do concrete pad and maintenance hole cover elevations need to be adjusted down, or shouldasphalt paving slope up to existing elevations?
A2:Yes, they will be adjusted as indicated on the plans
Q3:Any new bollards?
A3:No new bollards.
Q4:Install traffic rated vaults for any utility areas that don’t currently have bollards?
A4:Yes. If not indicated on plans. Please install w/traffic rated vaults.
Q5:Need any striping on asphalt?
A5:No striping plan needed, no traffic striping needed.
Q6:Where can equipment be staged/stored when not in use?
A6:TBD. Either Wash Rack, or East Parking lot.
Q7:Are there specifications for asphalt mix required?
A7:Yes, engineering plans provide specifications.
Q8:What are the signaling requirements for any equipment on the ramp (strobes / flags)?
A8:Comply w/all FAA regulations. Strobe lights, flags, and NOTAMS (ANG will help coordinate through Airfield Ops)
Q9:What about area directly in front of OPS building?
A9:No, not included in this project.
Q10:Should interested parties submit their information prior to the time and date of the Site Visit?
A10:If you plan to attend the Site Visit, please email SSgt Salinas with your company and employee name and number.
Q11:Are bonds required for bid, performance, or payment?
A11:Bid- NO. Payment- YES. Performance- YES.
Q12:Do you only need the RFQ package completed with the CLIN data, along with a detailed breakdown of costs and information requested from the SOW?
A12:Yes. Please provide and submit the requested items, and any other pertinent information that may be relevant to the requirement. Interested parties are welcome to include their SAM credentials, but we will also verify this through the system, on our end.
Q13:Is the Site Visit mandatory for the project.
A13:Interested parties are not require to attend the Site Visit in order to submit quotes.
Q14:The SOW refers to designs and drawings that are attached, but were not included.
A14:The Design and Specifications document was not originally attached to SOW. It is now uploaded to FBO as a separate attachment.

NOTE:

CES incorrectly stated that the rock will remain on-site. The rock will be disposed of by contractor as indicated on the plans. Rock to be taken off-site. Can we ask for credit for gravel being taken off-site?