RFI__4.pdf

PDF 8 KB Posted

Attached to
Modular Trailer Install/Lease
Solicitation number
W912K6-17-R-5002
Issued by

About this file

RFI #4

View the file

Other files

File Type Posted
RFI__5.pdf PDF
W912K6-17-R-50002-0002.pdf PDF
PJMS_172090_SOW_Intstall_Temp_Maint_Admin_Space_8_Aug_17.pdf PDF
RFI__3.pdf PDF
RFI__2.pdf PDF
A-10_Temporary_Modular_1_Water.pdf PDF
RFI__1.docx DOCX document
Signin_Sheet_Trailers.pdf PDF
Preproposal_slides_Modular_Facilities.pptx PPTX presentation
Sign_In_Sheet.pdf PDF
EXHIBIT_F.docx DOCX document
Preproposal_slides_Modular_Facilities.pptx PPTX presentation
EXHIBIT_A.doc DOC document
EXHIBIT_C.doc DOC document
EXHIBIT_B.doc DOC document
Brand_Name_Justification_Advantor_Modular_Building.pdf PDF
175th_WING_INSTALLATION_ACCESS_APPLICATION.pdf PDF
PJMS_172090_SOW_Intstall_Temp_Maint_Admin_Space.pdf PDF
Brand_Name_Justification_Comm_modular_building_(1).pdf PDF
W912K6-17-R-5002.pdf PDF
W912K6-17-R-5002-0001.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #4

1) 2.1 - Pre-Construction. Contractor to provide engineering drawings (Plus, 4.4.1, 4.4.2 , and 6.3.2 - All

Drawings.). Do any of these drawings require a Maryland PE Stamp? No

2) Section 3.1 - The existing 800amp panel located in building 1110 appears to be loaded up with breakers/circuits.

It appears that the existing 800amp service will NOT handle the additional load of the new modular building. Please provide the existing load calculations on the existing 800amp panel located in building 1110. Based on the electrical panel calculation the draw of the power is 443.2 amps per phase. Using the 80% safety factor, there is 354.5 amps per phase. Remaining power is 445.5 amps of the 800 amp panel.

3) 3.1.1 - States estimated load for new modular building 200amp panel. Note that the new modular load will require a 400amp 3 phase panel. Based on our preliminary calculations the total estimated load is 302 amps.

Spread that across three phases you get roughly 100.66 amps per phase. 80% safety factor allows for 160 amp per phase. We are within the safety range. Contractor should verify this data and provide reason for the requirement of a 400 amp panel.

4) 3.1.2 - States to replace the existing 60amp breaker with a 150amp breaker. A 150amp breaker will not handle the load of the new modular building. It is standard for electric panel build outs to have different size bus that your breakers attach to. It appears that the buss size in the existing 800amp panel is rated for 100amp breakers. Even if a

150amp service was sufficient for the new modular the 150amp breaker will not fit in place of the 60amp breaker.

The panel cover would have to be removed to check the buss out and see if the buss can be modified to accept a larger frame 150amp breaker. The 60 amp panel on site shall be removed. Submit your bid for the existing solution.