Request for Information Worksheet

View the file

Other files

File Type Posted
Request_for_Information_11-23-2016.pdf PDF
Photos.pdf PDF
Request_for_Information_11-17-2016.pdf PDF
A_07_Soliciation_Amendment.pdf PDF
Drawings.pdf PDF
A_01_PANG_Alert_Hgr_Type_B3_Final_Spec_Book_20140321.pdf PDF
A_07_Solicitation.pdf PDF
A_01_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Request for Information Worksheet Page of RFIW, v1.0 Requirement Information Requirement Description Solicitation Number Contracting Officer Questions and Answers Number Question Answer Increase Rows Decrease Rows

Notes General Notes and Information 2.1 817-852-3254 02 June 2015

136 MSG/MSC

Micah Kruse Contract Execution Checklist 03 June 2015 BLDG 210 is a two (2) bay hanger that is connected to a crew living quarters. 210 has a wall in-between the two (2) bays. BLDG 212 was an additional hanger consisting of one (1) bay. Two (2) hangers; three (3) bays. Requested are two (2) Megadoors (one for each the North and South side of BLDG 212) and Installation of Gas Fired IR Heat in all three Hangar Bays (BLDGS 210 and 212).

The drawings offered in the solicitation are for your use to purchase and install the required Megadoors. Drawings A001, A101, A201, A301, A311, A501, A601, E-000, E001, E101, E102, E103, E401, E501, E504, E601 & E603 give you all aspects of construction for structural, electrical, etc. Sheet A-201 Note 4.208 state “4.208 FUTURE VERTICAL LIFT FABRIC DOOR; NOT IN CONTRACT.” “Not in contract” refers to the former solicitation to have the building built. We are requesting to have the doors installed now.

These specs are reference for the drawings. We expect that the specifications provided will encompass any work that falls within a certain trade (i.e. Electrical – Please see Div 26. IR heat shall be sized and installed per industry standard. No specification exists for this. We expect that a professional company will provide an industry standard product to meet our intent.

The plans and specifications for the Megadoors are included in the Solicitation notice on FBO.gov. These are the documents prepared by Mead and Hunt. The IR heat is a Design/Build by the Contractor with the requirements outlined in SOW Section SW-15 15.3.3.

All documents are included in the solicitation on FBO.gov.

CurrentPage:
PageCount:
PRNumber: Install Mega Door and IR Heat
PRNumber: W912JV-17-B-4001
PRNumber: SMSGT DENISE PHILLIPS
Cell1: 1
Cell1: The SOW refers to 2 ea. Megadoors on Alert Hanger 212 and IR Heat installed in 3 Alert Bays (210 and 212). In looking at the current drawings attached to the Solicitation, each hanger is considered a “bay”. That said, 210 would be a bay and 212 would be another bay. Where is the third?
Cell1: 2
Cell1: The drawings offered with the solicitation appear to be for a new building “Type B” and do not show any door or IR heat work at all. Are these the right drawings?
Cell1: 3
Cell1:

Specifications offered are for a new building complete with site, concrete and electrical. They do not refer to doors or IR heat. Are these the wrong specs?

Cell1: 4
Cell1: I cannot find anywhere where the specifications for doors or IR heat are listed for inclusion. Please clarify.
Cell1: 5
Cell1: The drawings offered are 10 Electrical and 7 Architectural. They are all duplicated except for E603 and are for a new building “Type B”. Please clarify.
:
IncreaseRowA:
DecreaseRowA: