- Install Megadoors and IR Heat
- Solicitation number
- W912JV-17-B-4001
About this file
Request for information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request_for_Information_11-23-2016.pdf | ||
| Photos.pdf | ||
| A_07_Soliciation_Amendment.pdf | ||
| Request_for_Information_Worksheet_-_v1_0.pdf | ||
| Drawings.pdf | ||
| A_01_PANG_Alert_Hgr_Type_B3_Final_Spec_Book_20140321.pdf | ||
| A_07_Solicitation.pdf | ||
| A_01_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Request for Information Worksheet Page of RFIW, v1.0 Requirement Information Requirement Description Solicitation Number Contracting Officer Questions and Answers Number Question Answer Increase Rows Decrease Rows
Notes General Notes and Information 2.1 817-852-3254 02 June 2015
136 MSG/MSC
Micah Kruse Contract Execution Checklist 03 June 2015 Bids will be mailed or hand delivered to 142 MSG/MSC Bldg 170 6801 Cornfoot Rd, Portland, OR 97218 The Contracting Officer will issue an Amendment to Allow for the listed activities. The Total Contact Performance period will be 180 days with 60 days of On-Site work.
Yes, please see Drawing E-102 int he FBO Solicitation file titled "Drawings.pdf". Control Cabinet is located on the west wall.
The existing HEF System in the Hangars will NOT be modified.
This project will only: Add Megadoors to Building 212 Hangar; and IR Heat installed in the two Hangar Bays in 210 and Hangar Bay 212. The drawings provided in the Solicitation were originally used for the Construction of the Building 212 Hangar but the Megadoors were not included in that Contract. This Contract is to complete this aspect of the project.
| CurrentPage: |
| PageCount: |
| PRNumber: TQKD162012 Install Megadoors and IR Heat-Bid Inquiry |
| PRNumber: W912JV-17-B-4001 |
| PRNumber: SMS Denise Phillips |
| Cell1: 1 |
| Cell1: At the pre-bid conference, it was mentioned that hard copies |
of the bid packages must be sent. The solicitation states that bid packages can be emailed. Please clarify if emailed bid packages will be accepted.
Also, if emailed bid packages are acceptable, please specify if you still need to receive a hard copy of our Bid Bond prior to the bid closing date/time. If a hard copy of the Bid Bond IS required, would the government be willing to extend the closing date until Tuesday, 29 November to accommodate the mail over the long holiday weekend? Monday morning after a 4 day weekend might present challenges for ensuring the mail is received by the government.
| Cell1: 2 |
| Cell1: The 90 day (from NTP) period of performance does not allow |
adequate time for the delivery of the Megadoors. The manufacturer has indicated a delivery time of 12-14 weeks (minimum). This time frame does NOT include any time for shop drawing/submittal preparation or government review/approval, (or installation). We request the government extend the total period of performance to 180 days (from NTP). The 60 day "On-Site" period of performance is still valid and requires no additional time.
| Cell1: 3 |
| Cell1: Is there a design drawing showing location of the control panel and the remote control panel for the doors? |
| Cell1: 4 |
| Cell1: Is the HEF foam system is being expanded in this project? |
| Cell1: 5 |
| Cell1: |
| Cell1: 6 |
| Cell1: |
| : |
| IncreaseRowA: |
| DecreaseRowA: |