W912JB-19-B-5007_Solicitation_Amendment_0002.pdf

PDF 206 KB Posted

Attached to
Hangar 36 Multiple Projects Federal contract opportunity
Solicitation number
W912JB-19-B-5007
Issued by
Department of the Army Michigan Army National Guard

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Hangar 36 Multiple Projects, newest first.
File Type Posted
Bid_Opening_Sign_In_Sheet.pdf PDF
Bid_Opening_Abstract_H36_MP_Updated.pdf PDF
RFI_DOCUMENT_1.pdf PDF
RFI_DOCUMENT_2.pdf PDF
Site_Visit_Minutes_1st.pdf PDF
Sign_In_Sheet.pdf PDF
W912JB-19-B-5007_AMENDMENT_0004.pdf PDF
Site_Visit_Minutes_2nd.pdf PDF
Sign_In_Sheet_2nd.pdf PDF
W912JB-19-B-5007_AMENDMENT_0003.pdf PDF
W912JB19B5007_Amendment_0002a.pdf PDF
W912JB-19-B-5007_AMENDMENT_0001.pdf PDF
Manufacturer_Details_Drawing.pdf PDF
S1.pdf PDF
H36_Design_Drawings_00.pdf PDF
W912JB-19-B-5007_SOLICITATION.pdf PDF
Vetting_Access_Request_List_Blank.pdf PDF
SOW_Hangar_36_Multi_Project_-_Rev_01b.pdf PDF
Hangar_36_-_AF_Form_66_Rev_00.pdf PDF
Presolicitation_Announcement_H36_Multiple_Projects.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F8Y36P9123AW03

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Solicitation Amendment is to add in the updated DOL Wage Determination for the area and classifications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB19B5007

X 9B. DATED (SEE ITEM 11)

24-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2019

CODE

127 MSC - FA6221

43200 MAPLE ST

BLDG 105, RM 16

SELFRIDGE ANGB MI 48045-5213

W912JB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912JB19B5007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO BIDDERS

SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. Description of the Project: The contractor shall schedule, mobilize and perform a complete construction project on Hangar 36 with several areas of work. The work will be general construction work as described by the contract drawings and this Statement of Work. The work will be multidiscipline and will utilize many diffident trades to be accomplished. The work will be in multiple areas of the building.

2. Instructions to Bidders:

2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W912JB-19-B-5007

HANGAR 36 MULTIPLE PROJECTS, Project Number VGLZ 192038, at Selfridge ANGB, MI.

2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

2.3. This solicitation is set-aside 100% for small business concerns contractors under NAICS 236220 which has a size standard of $36.5M.

2.4. Facsimile transmission of a bid is not authorized. Electronic submission of bids will not be accepted.

Bids must be hand carried to the bid opening or mailed.

2.5. A formatted disk (CD) shall be submitted with your bid that includes all those things required in the bid submission. The Formatted disk shall be labeled

-Solicitation # (W912JB-19-B-5007) -Name / Company Name and Address of Bidder

3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:

3.1. A pre-bid conference will be conducted on Friday 23 August 2019 at 8:00am EST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 43200 Maple Street, Bldg 105, Room 20, Selfridge ANGB, MI 48045 (Contracting- Conference Room). Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.

3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to David Brown and Steven Stocking at the following addresses:

david.a.brown202.civ@mail.mil and steven.a.stocking3.mil@mail.mil. You may call us at (586) 239-5867/4881 with questions/concerns.

Firm/Company Name and Telephone Number Visitor’s Full Name and Last 4 of Social Security #.

Driver’s License # / State Issued

Date of Birth Gender Race Citizenship

3.3. This information must be provided in advance, 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

3.4. Visitors must pick up their passes at the Installation’s Main Entry Gate (M-59 / Rosso Hwy Road Gate) prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration,

(2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable.(5) for those who have not received a pass in the past year, may be required to show either a social security card, tax ID number, or certificate of naturalization at the time of issue. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. All amendments will be posted to FBO.gov, and it should be noted that local ‘plan rooms’ do NOT typically distribute amendments in a timely manner. Please always refer to FBO.gov.

3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at FBO.gov.

The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. SOLICITATION W912JB-19-B-5007 Email: Contracting Officer Steven A. Stocking – steven.a.stocking3.mil@mail.mil and Contract Specialist David Brown – david.a.brown202.civ@mail.mil

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________

From: ______________________________ Company Name: ________________________________

Address:_____________________________________________________________________________

Phone Number: _____________________________ Fax Number:______________________________

Email address: ________________________________________________________________________

Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

4.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.

4.2. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS

EARLY IN THIS PROCESS.

4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.

However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov

4.4. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.

4.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. Plans and specifications are locked on FBO and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on FBO. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.

4.5.1. Amendments, if/when issued will be posted to FBO.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.

5. BID REPOSITORY AND BID OPENING:

5.1. A bid repository is provided for hand carried bids and is located at 43200 Maple Street, Bldg 105, Contracting Front Office (Directly across from Room 20), Selfridge ANGB, MI 48045. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions to obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.

5.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 10 September 2019 at 2:00pm ET. All interested offerors and their major subcontractors are encouraged to attend the bid opening.

www.time.gov will be referenced for Eastern Time at the bid repository location.

6. WAGE DETERMINATION:

6.1. Construction Wage Rates are applicable to this project are MI20180091 08/16/2019 Mod 4 as shown in

Section 00800.

7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

8. CLAUSES:

8.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

9. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.

10. OFFERORS QUALIFICATIONS:

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

11. BRAND NAME JUSTIFICATION: N/A

Summary:

The contractor shall schedule, mobilize and perform a complete construction Project VGLZ 192038 on Hangar 36 with several areas of work. The work will be general construction work as described by the contract drawings and this Statement of Work. The work will be multidiscipline and sometimes complex in nature and will utilize different trades to be accomplished. All trades will be headed up journeymen level workers. The work will be performed in multiple areas of the building with full coordination with the occupants.

Note: All bidders will submit a cost breakdown of the (5) work element projects with the bid.

The contractor will provide all manpower and material to make all necessary repairs and upgrades Hangar 36 per the attached set of drawings and Statement of Work. There will be aircraft in the hangar during construction and the contractor will use extreme care measures while working near any aircraft. No contractor will be within 10 feet of any aircraft for any reason.

The drawings and design drawings provided by the government for this work are considered as reference only for bidding purposes. The contractor and any subcontractors will perform a site visit, site review and site assessments prior to bidding.

The awarded contractor will provide installation shop drawings for approval showing full installations of the work in Hangar 36. This will include all work that will be done by this contractor that would require a shop or installation drawing as follows: The power supply installation drawings, the electrical shop rewiring drawings, the shower drawings, the window sill installation drawings.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: MI20190091 08/16/2019

Superseded General Decision Number: MI20180091

State: Michigan

Construction Type: Building

County: Macomb County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/18/2019 2 02/15/2019 3 07/05/2019 4 08/09/2019 5 08/16/2019

ASBE0025-002 06/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.58 32.32

BOIL0169-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 38.65 26.22

BRMI0001-001 06/01/2018

Rates Fringes

BRICKLAYER.......................$ 34.18 21.22

TILE FINISHER....................$ 27.94 19.12

TILE SETTER......................$ 34.66 19.12

CARP0687-003 06/01/2019

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 32.70 28.94

CARP1045-001 06/01/2018

Rates Fringes

CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 28.60 23.88

* CARP1102-002 06/01/2019

Rates Fringes

MILLWRIGHT.......................$ 34.50 32.65

ELEC0058-001 07/01/2018

ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 24.25 12.38 Technician..................$ 35.01 14.08

ELECTRICIAN......................$ 38.73 23.85

ELEV0036-002 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 51.96 33.705

ENGI0324-017 06/01/2019

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 41.89 24.45

GROUP 2....................$ 40.39 24.45

GROUP 3....................$ 38.89 24.45

GROUP 4....................$ 38.59 24.45

GROUP 5....................$ 37.77 24.45

GROUP 6....................$ 36.91 24.45

GROUP 7....................$ 35.94 24.45

GROUP 8....................$ 34.23 24.45

GROUP 9....................$ 25.89 24.45

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer

GROUP 2: Crane with boom and jib or leads 300' or longer

GROUP 3: Crane with boom and jib or leads 220' or longer

GROUP 4: Crane with boom and jib or leads 140' or longer

GROUP 5: Crane with boom and jib or leads 120' or longer

GROUP 6: Regular crane operator, and concrete pump with boom operator

GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher

GROUP 8: Forklift & extend-a-boom forklift

GROUP 9: Oiler

IRON0025-019 06/01/2018

Rates Fringes

IRONWORKER

REINFORCING.................$ 28.48 27.74

STRUCTURAL..................$ 35.52 28.65

IRON0025-022 06/01/2018

Rates Fringes

IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 35.52 28.65

LABO0259-002 08/01/2017

Rates Fringes

LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 27.86 12.87

LABO0334-005 06/01/2018

LABORER: Landscape & Irrigation

GROUP 1.....................$ 20.52 6.90

GROUP 2.....................$ 18.52 6.90

CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1191-002 06/01/2018

Rates Fringes

LABORER

Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;

Pipelayer; Sandblaster......$ 28.20 16.80

PAIN0022-003 06/01/2015

Rates Fringes

PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66

PAIN0357-002 06/01/2017

Rates Fringes

GLAZIER..........................$ 31.72 18.71

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0067-001 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07

PLAS0067-004 04/01/2014

Rates Fringes

PLASTERER........................$ 30.63 14.07

PLUM0098-001 06/05/2018

Rates Fringes

PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 39.77 27.13

PLUM0636-003 06/05/2017

Rates Fringes

PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 40.41 29.35

ROOF0149-001 06/01/2018

Rates Fringes

ROOFER...........................$ 32.40 21.88

SFMI0704-001 01/01/2019

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 43.65 27.27

SHEE0080-004 07/01/2018

SHEET METAL WORKER (Including HVAC Duct Installation;

Excluding HVAC System Installation)....................$ 41.05 26.66

TEAM0247-002 06/01/2018

Rates Fringes

TRUCK DRIVER

GROUP 1

Dump; Flatbed; Pickup......$ 26.71 0.70+a

GROUP 2

Semi.......................$ 26.86 0.70+a

GROUP 3

Lowboy.....................$ 26.96 0.70+a

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $456.70 per week, plus $67.10 per day.

SUMI2011-016 02/01/2011

Rates Fringes

INSTALLER - OVERHEAD DOOR........$ 27.98 0.00

IRONWORKER, ORNAMENTAL...........$ 18.48 7.93

TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 1.18

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

File details come from the government source that posted it.