Hangar_36_-_AF_Form_66_Rev_00.pdf
PDF 47 KB Posted
- Attached to
- Hangar 36 Multiple Projects Federal contract opportunity
- Solicitation number
- W912JB-19-B-5007
About this file
Submittal Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Sign_In_Sheet.pdf | ||
| Bid_Opening_Abstract_H36_MP_Updated.pdf | ||
| RFI_DOCUMENT_2.pdf | ||
| RFI_DOCUMENT_1.pdf | ||
| Sign_In_Sheet.pdf | ||
| Site_Visit_Minutes_1st.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0004.pdf | ||
| Site_Visit_Minutes_2nd.pdf | ||
| Sign_In_Sheet_2nd.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0003.pdf | ||
| W912JB19B5007_Amendment_0002a.pdf | ||
| W912JB-19-B-5007_Solicitation_Amendment_0002.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0001.pdf | ||
| S1.pdf | ||
| H36_Design_Drawings_00.pdf | ||
| Manufacturer_Details_Drawing.pdf | ||
| W912JB-19-B-5007_SOLICITATION.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| SOW_Hangar_36_Multi_Project_-_Rev_01b.pdf | ||
| Presolicitation_Announcement_H36_Multiple_Projects.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 192 038
APPROVED DISAPPROVED
1 Requirements of Selfridge Air National Guard Base
2 Contractor Base Pass Request
3 Schedule of Materials Submittal - AF Form 66 Modified
Material approval submittal - AF Form 3000
5 Request for Information (RFI) Format
Contract Progress Schedule - AF Form 3064
7 Contract Progress Report - AF Form 3065 8 Real Property Installed Cost Worksheet
9 Contractor Hazardous Material Identification - SANGB Form 23
10 Solid Waste Disposal and Diversion Tracking Form
Affirmative Procurement Reporting Form
General Requirements
Summary of Work
Substitution Procedures
Contract Considerations
Applications for Payment
Coordination and Project Meetings
18 Construction Progress Schedules Look Ahead Schedules
Construction Photographs
Submittals
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
Safety Policies and Procedures
22 Quality Requirements Quality Plan
Project Coordination
Reference Standards
Steel Verification Services
Field Office Plans
Environmental Protection
Material and Equipment
Workmanship Warranties
Starting of Systems
Project Closeout
32 Operation and Maintenance Data
33 Project Record Documents
34 Demonstration and Training
35 Weather
36 Selective Demolition
37 Steel Fabrications 38 Product Data and shop drawings 39 Fabrication 40 Finishes 41 Warranty 42 Paint and Primer 43 Product Data
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
44 Sample Colors
45 Electrical 46 Installation Shop Drawings 47 Wire Materials 48 Disconnects
Common Work Results For Electrical
50 Product Data
51 Shop Drawings
52 O & M Data
53 Warranty
54 Low-Voltage Electrical Power Conductors & Cables
55 Product Data for Each Type of Cable
56 Grounding & Bonding for Electrical Systems
57 O & M Data
58 Hangers & Supports for Electrical Systems 59 Product Data 60 Shop Drawing 61 O & M Data 62 Warranty
63 Raceway & Boxes for Electrical Systems 64 Product Data on the following Material:
65 Metal Conduit & Tubing 66 Metal Wire ways 67 Surface Raceways 68 Boxes, Enclosures, Cabinets
Identification for Electrical Systems
70 Product Data 71 Color and Legend Requirements 72 Labels
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
73 Sleeves and Sleeve Seal for Electrical Raceways and Cabling
74 Product Data on the following Material:
75 Sleeves 76 Sleeve-Seal Systems 77 Sleeve-Seal Fittings 78 Grout 79 Silicone Sealants
80 Wiring Devices 81 Product Data 82 Shop Drawings 83 O & M Data 84 Warranty 85 Fuses 86 Product Data 87 Shop Drawings 88 O & M Data 89 Warranty 90 Enclosed Switches 91 Product Data 92 Shop Drawings 93 O & M Data 94 Air Craft Cables 95 Product Data 96 Installation Shop Drawings 97 Connection Types
98 Inspection Reports on Overhead Power Supply Installation
99 Paint Temporary Curtain 100 Product Data 101 O & M Data 102 Building Connection Types 103 Paint Masking Material 104 Product Data 105 O & M Data 106 Shower Stall 107 Product Data 108 Shop Drawings of Installation.
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
109 O & M Data 110 Warranty 111 Tile And Grouting 112 Product Data and Samples 113 O & M Data 114 Warranty 115 Plumbing Materials 116 Product Data and Samples 117 O & M Data 118 Warranty 119 Plumbing Fixtures / Valves 120 Product Data and Samples 121 O & M Data 122 Warranty 123 Window Sills 124 Product Data and Samples 125 O & M Data 126 Warranty 127 Shop Drawings of Installation.
128 Fastening Material 129 Caulking Material
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Hangar 36 - Multi Project
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it.