Hangar_36_-_AF_Form_66_Rev_00.pdf

PDF 47 KB Posted

Attached to
Hangar 36 Multiple Projects Federal contract opportunity
Solicitation number
W912JB-19-B-5007
Issued by
Department of the Army Michigan Army National Guard

About this file

Submittal Form

View the file

Other files for this federal contract opportunity

Other files attached to Hangar 36 Multiple Projects, newest first.
File Type Posted
Bid_Opening_Sign_In_Sheet.pdf PDF
Bid_Opening_Abstract_H36_MP_Updated.pdf PDF
RFI_DOCUMENT_2.pdf PDF
RFI_DOCUMENT_1.pdf PDF
Sign_In_Sheet.pdf PDF
Site_Visit_Minutes_1st.pdf PDF
W912JB-19-B-5007_AMENDMENT_0004.pdf PDF
Site_Visit_Minutes_2nd.pdf PDF
Sign_In_Sheet_2nd.pdf PDF
W912JB-19-B-5007_AMENDMENT_0003.pdf PDF
W912JB19B5007_Amendment_0002a.pdf PDF
W912JB-19-B-5007_Solicitation_Amendment_0002.pdf PDF
W912JB-19-B-5007_AMENDMENT_0001.pdf PDF
S1.pdf PDF
H36_Design_Drawings_00.pdf PDF
Manufacturer_Details_Drawing.pdf PDF
W912JB-19-B-5007_SOLICITATION.pdf PDF
Vetting_Access_Request_List_Blank.pdf PDF
SOW_Hangar_36_Multi_Project_-_Rev_01b.pdf PDF
Presolicitation_Announcement_H36_Multiple_Projects.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

VGLZ 192 038

APPROVED DISAPPROVED

1 Requirements of Selfridge Air National Guard Base

2 Contractor Base Pass Request

3 Schedule of Materials Submittal - AF Form 66 Modified

Material approval submittal - AF Form 3000

5 Request for Information (RFI) Format

Contract Progress Schedule - AF Form 3064

7 Contract Progress Report - AF Form 3065 8 Real Property Installed Cost Worksheet

9 Contractor Hazardous Material Identification - SANGB Form 23

10 Solid Waste Disposal and Diversion Tracking Form

Affirmative Procurement Reporting Form

General Requirements

Summary of Work

Substitution Procedures

Contract Considerations

Applications for Payment

Coordination and Project Meetings

18 Construction Progress Schedules Look Ahead Schedules

Construction Photographs

Submittals

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

APPROVED DISAPPROVED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

Safety Policies and Procedures

22 Quality Requirements Quality Plan

Project Coordination

Reference Standards

Steel Verification Services

Field Office Plans

Environmental Protection

Material and Equipment

Workmanship Warranties

Starting of Systems

Project Closeout

32 Operation and Maintenance Data

33 Project Record Documents

34 Demonstration and Training

35 Weather

36 Selective Demolition

37 Steel Fabrications 38 Product Data and shop drawings 39 Fabrication 40 Finishes 41 Warranty 42 Paint and Primer 43 Product Data

APPROVED DISAPPROVED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

44 Sample Colors

45 Electrical 46 Installation Shop Drawings 47 Wire Materials 48 Disconnects

Common Work Results For Electrical

50 Product Data

51 Shop Drawings

52 O & M Data

53 Warranty

54 Low-Voltage Electrical Power Conductors & Cables

55 Product Data for Each Type of Cable

56 Grounding & Bonding for Electrical Systems

57 O & M Data

58 Hangers & Supports for Electrical Systems 59 Product Data 60 Shop Drawing 61 O & M Data 62 Warranty

63 Raceway & Boxes for Electrical Systems 64 Product Data on the following Material:

65 Metal Conduit & Tubing 66 Metal Wire ways 67 Surface Raceways 68 Boxes, Enclosures, Cabinets

Identification for Electrical Systems

70 Product Data 71 Color and Legend Requirements 72 Labels

APPROVED DISAPPROVED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

73 Sleeves and Sleeve Seal for Electrical Raceways and Cabling

74 Product Data on the following Material:

75 Sleeves 76 Sleeve-Seal Systems 77 Sleeve-Seal Fittings 78 Grout 79 Silicone Sealants

80 Wiring Devices 81 Product Data 82 Shop Drawings 83 O & M Data 84 Warranty 85 Fuses 86 Product Data 87 Shop Drawings 88 O & M Data 89 Warranty 90 Enclosed Switches 91 Product Data 92 Shop Drawings 93 O & M Data 94 Air Craft Cables 95 Product Data 96 Installation Shop Drawings 97 Connection Types

98 Inspection Reports on Overhead Power Supply Installation

99 Paint Temporary Curtain 100 Product Data 101 O & M Data 102 Building Connection Types 103 Paint Masking Material 104 Product Data 105 O & M Data 106 Shower Stall 107 Product Data 108 Shop Drawings of Installation.

APPROVED DISAPPROVED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

109 O & M Data 110 Warranty 111 Tile And Grouting 112 Product Data and Samples 113 O & M Data 114 Warranty 115 Plumbing Materials 116 Product Data and Samples 117 O & M Data 118 Warranty 119 Plumbing Fixtures / Valves 120 Product Data and Samples 121 O & M Data 122 Warranty 123 Window Sills 124 Product Data and Samples 125 O & M Data 126 Warranty 127 Shop Drawings of Installation.

128 Fastening Material 129 Caulking Material

APPROVED DISAPPROVED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Hangar 36 - Multi Project

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

File details come from the government source that posted it.