RFI_DOCUMENT_2.pdf
PDF 182 KB Posted
- Attached to
- Hangar 36 Multiple Projects Federal contract opportunity
- Solicitation number
- W912JB-19-B-5007
About this file
RFI's.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Sign_In_Sheet.pdf | ||
| Bid_Opening_Abstract_H36_MP_Updated.pdf | ||
| RFI_DOCUMENT_1.pdf | ||
| Site_Visit_Minutes_1st.pdf | ||
| Sign_In_Sheet.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0004.pdf | ||
| Sign_In_Sheet_2nd.pdf | ||
| Site_Visit_Minutes_2nd.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0003.pdf | ||
| W912JB19B5007_Amendment_0002a.pdf | ||
| W912JB-19-B-5007_Solicitation_Amendment_0002.pdf | ||
| W912JB-19-B-5007_AMENDMENT_0001.pdf | ||
| W912JB-19-B-5007_SOLICITATION.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| SOW_Hangar_36_Multi_Project_-_Rev_01b.pdf | ||
| Hangar_36_-_AF_Form_66_Rev_00.pdf | ||
| S1.pdf | ||
| H36_Design_Drawings_00.pdf | ||
| Manufacturer_Details_Drawing.pdf | ||
| Presolicitation_Announcement_H36_Multiple_Projects.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912JB-19-B-5007
HANGAR 36 MULTIPLE PROJECTS
RFI’S 2ND SUBMISSION
1. In reference to: PG 9 of 12 of the SOW, Note 2. Prepare site location for installation of new window sills including structural, architectural and water proofing.
-No structural damage could be seen during the site visit and the structural condition beneath the sills is unknown.
-Please describe / quantify the structural scope intended for the window sills.
Reply: The contractor will provide any structural support for the windowsills if it is required.
This might include some other detail to install the window sill and have it fit correctly for architectural, structural.
2. During the site visit, it was noted that there are electrical and comm raceways connected to the windowsills. Please confirm that these raceways are not a part of this scope and if they are please describe / quantify.
Reply: Window sills will be demoed with care and new sills installed with the same connection to the raceways as existing.