Site_Visit_Minutes_2nd.pdf

PDF 232 KB Posted

Attached to
Hangar 36 Multiple Projects Federal contract opportunity
Solicitation number
W912JB-19-B-5007
Issued by
Department of the Army Michigan Army National Guard

About this file

Meeting Minutes

View the file

Other files for this federal contract opportunity

Other files attached to Hangar 36 Multiple Projects, newest first.
File Type Posted
Bid_Opening_Sign_In_Sheet.pdf PDF
Bid_Opening_Abstract_H36_MP_Updated.pdf PDF
RFI_DOCUMENT_1.pdf PDF
RFI_DOCUMENT_2.pdf PDF
Site_Visit_Minutes_1st.pdf PDF
Sign_In_Sheet.pdf PDF
W912JB-19-B-5007_AMENDMENT_0004.pdf PDF
Sign_In_Sheet_2nd.pdf PDF
W912JB-19-B-5007_AMENDMENT_0003.pdf PDF
W912JB19B5007_Amendment_0002a.pdf PDF
W912JB-19-B-5007_Solicitation_Amendment_0002.pdf PDF
W912JB-19-B-5007_AMENDMENT_0001.pdf PDF
S1.pdf PDF
H36_Design_Drawings_00.pdf PDF
Manufacturer_Details_Drawing.pdf PDF
W912JB-19-B-5007_SOLICITATION.pdf PDF
Vetting_Access_Request_List_Blank.pdf PDF
SOW_Hangar_36_Multi_Project_-_Rev_01b.pdf PDF
Hangar_36_-_AF_Form_66_Rev_00.pdf PDF
Presolicitation_Announcement_H36_Multiple_Projects.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHIGAN AIR NATIONAL GUARD

127th MISSION SUPPORT GROUP

SELFRIDGE ANG BASE MICHIGAN

28 August 2019

MEMORANDUM FOR RECORD

FROM: 127 MSC

Contracting Division

43200 Maple St, Bldg. 105

Selfridge ANGB, MI 48045-5213

SUBJECT: Pre-Proposal Conference for Solicitation W912JB-19-B-5008, Project No. VGLZ 192038:

HANGAR 36 MULTIPLE PROJECTS.

1. Site visit held this date at the Contracting Division conference room commencing at: 9:00AM in conjunction with subject Request for Proposal. For list of attendees see sign in sheet.

2. Contract Specialist David Brown introduced himself and Tom Resh from the government’s team for the project. Steven Stocking was introduced as the Contracting Officer.

A. PROJECT DESCRIPTION:

The contractor shall schedule, mobilize and perform a complete construction project on Hangar 36 with several areas of work. The work will be general construction work as described by the contract drawings and this Statement of Work. The work will be multidiscipline and will utilize many diffident trades to be accomplished. The work will be in multiple areas of the building.

3. Bids are due NLT Tuesday 10 September 2019 at 2:00PM local time. Offerors are to hand carry bids to 127 MSC Lobby/Conference Room and deposit bids in a bid depository. Offerors are advised that this project is not currently funded and that offers must be good for 112 days.

a. Project Magnitude is between $250,000.00 and $500,000.00

b. After the notice to proceed is issued the project has a performance time of 200 calendar days for project completion.

c. A Site Visit will be held immediately after this pre-proposal conference at the construction site.

d. When amendments are issued they will be posted to the FBO website.

e. Bid, Payment, and Performance Bonds will be required for this project based on

Independent Government Estimate.

f. Liquidated damages are not applicable to this project.

g. Warranty of Construction clause is incorporated and applies to this project.

h. The most current wage determination is incorporated into the solicitation and will be made part of the resultant contract but it is the contractor's responsibility to keep track of the most current wage rate. Currently DBA MI20190091 Mod 5 dated 16 August

2019.

i. Safety measures are always a part of Government contracts and the Army Corp of

Engineers manual is incorporated in the contract.

j. RFI procedures were reviewed as follows:

i. Email technical questions in RFI format to the Contracting for resolution.

ii. All RFI questions and answers will be emailed out as soon as possible.

k. Please recall that only the Contracting Officer can approve changes such as price, schedule, specifications, and clauses with formal written notice typically in the form of a solicitation amendment or task order modification. Work undertaken regarding changes not formally approved by the Contracting Officer (save for COR approved no cost field changes) is at the Contractor’s risk.

l. This requirement is currently not funded.

4. The project description was stated in the FBO announcement package repair transformers project announcement notice sent out with the Notice of Solicitation Form on 8 August 2019.

5. Any project specific questions were referred to the RFI submittal process. Bidders were instructed on the need for supplying base access requests, and that bids would only be accepted via hand carried or regular mail. No emailed bids. Also, it was instructed that there may be a change in the bid due day and time, and that WILL occur, as bids will now be due on Monday 9 September 2019 at 11:00am EST. A solicitation Amendment will be published with the new date.

6. The site visit concluded at 10:00am on Wednesday 28 August 2019.