Upgrade_Add_No_1_(Proprietary).pdf
PDF 4 MB Posted
- Attached to
- Repair Multiple Bldg's HVAC Federal contract opportunity
- Solicitation number
- W912JB-19-B-5003
About this file
Revised Drawings and Addendum (Proprietary)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract_Multiple_HVAC.pdf | ||
| Bid_Sign_In_Sheet.pdf | ||
| RFI_DOCUMENT_1_(002).pdf | ||
| W912JB-19-B-5003_AMENDMENT_0002.pdf | ||
| W912JB-19-B-5003_AMENDMENT_0001.pdf | ||
| W912JB19B5003_Amendment_0001a.pdf | ||
| Sign_In_Sheet.pdf | ||
| Site_Visit_Minutes_HVAC.pdf | ||
| Drawings_3.pdf | ||
| W912JB-19-B-5003_Solicitation.pdf | ||
| AF_Form_66.pdf | ||
| SOW_Upgrade_HVAC_Multiple_Facilities_-_Rev_00_2.pdf | ||
| Multiple_Bldg_HVAC_DDC___Brand_Name_Justification.pdf | ||
| Drawings_1.pdf | ||
| Drawings_2.pdf | ||
| Drawings_4.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| Specifications.pdf | ||
| Presolicitation_Notice_Repair_Multiple_HVAC.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AECOM
27777 Franklin Road, Ste. 2000
Southfield, MI 48034 T: 248.204.5900
F: 248.204.5901 www.aecom.com
Addendum No. 1
Client: Selfridge Air National Guard Base Project Name: Upgrade HVAC Multiple Facilities
Location: Selfridge ANG Base, Michigan
Project No.: 60505971
Issue Date: August 15, 2019
This addendum refers to: includes drawings revised and reissued herein numbered M105, M105A, and E105.
AD1-1 NOTICE
A. This Addendum No. 1 to the contract documents for the above captioned project supersedes all contrary and/or conflicting information on said contract documents, where are hereby amended in certain particulars, as follows:
AD1-2 MECHANICAL DRAWING REVISIONS
A. Refer to drawing M105 “Building 129 – Mechanical Demo & New Work
Plans” (issued)
1. Revised “New Work Keyed Notes” M5 and M6.
2. Added “New Work Keyed Notes” M10 and M11.
3. At “First Floor – HVAC New Work Plan”, revised supply air ductwork to pop up into attic per keyed note M10. See Plan.
4. At “First Floor – HVAC New Work Plan”, added ducted return.
Route per keyed note M11. See Plan.
5. At “First Floor – HVAC New Work Plan”, added sidewall grilles, RG-2, in place of various lay-in return grilles. See plan.
6. At “First Floor – HVAC New Work Plan”, added grille size and cfm to all return grilles. See plan.
B. Refer to drawing M105A “Building 129 – Mechanical Schedules Details”
(issued)
1. Revised “Server Room AC-Unit Piping Diagram” to reflect ductwork route modifications.
Addendum No. 1 AECOM
Upgrade HVAC Multiple Facilities
60505971
2. Revised “Upflow Vertical Furnace Detail” to reflect ductwork route modifications.
3. At “Diffuser, Register, & Griller Schedule”, revised model number and overall size of RG-1.
4. At “Diffuser, Register, & Griller Schedule”, added RG-2.
5. At “Diffuser, Register, & Griller Schedule”, added Note 6 to all scheduled diffusers and grilles.
AD1-3 ELECTRICAL DRAWING REVISIONS
A. Refer Drawing E105 “Building 129 – Electrical Plans” (issued)
1. Revised “Architectural Keyed Notes” as shown on the drawing.
2. At “First Floor New Work Plan”, added note to install ceiling grid @
8’-0” at 2 rooms, as shown on the drawing.
BOILERS
EX. LP-B
225A, MCB
208/120V, 3ɸ, 4W
EX. LP-A
200A, MCB
208/120V, 3ɸ, 4W, 42 CKT
EX. P-1
EX. P-2
EX. P-3
EX. CU-1
EX. ACCU UNIT
(TO REMAIN)
EX. AC UNIT
(TO REMAIN)
EX. DWH
(TO REMAIN)
TOILET ROOM
TOILET ROOM
VESTIBULE
MECH. RM.
EX. PAD
MOUNTED
TRANSFORMER
(TO REMAIN)
EX. BP-129-1
CONTROLLER
EX. BP-129-2
CONTROLLER
OPEN
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
SD
F
F
SD
FSDF
SD
F SD
F
F
HD
F
SD
F
EX. LP-B
225A, MCB
208/120V, 3ɸ, 4W
EX. LP-A
200A, MCB
208/120V, 3ɸ, 4W, 42 CKT
NEW
EUH-129-1
NEW
ACCU-129-1
EX. ACCU UNIT
(TO REMAIN)
EX. AC UNIT
(TO REMAIN)
EX. DWH
(TO REMAIN)
NEW
AHU-129-1
NEW
EUH-129-2
NEW
EUH-129-3
NEW
EUH-129-4
60A-3P
WP
TOILET ROOM
TOILET ROOM
VESTIBULE
MECH. RM.
EX. PAD
MOUNTED
TRANSFORMER
(TO REMAIN)
OPEN
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
F
SD
F
SD
F
SD
F
30A-2P
SDFSDF
F
HD
F
SD
F
TOILET ROOM
TOILET ROOM
VESTIBULE
MECH. RM.
OPEN
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
SD
F
F
SD
FSDF
SD
F SD
F
F
HD
F
SD
F
TOILET ROOM
TOILET ROOM
VESTIBULE
MECH. RM.
OPEN
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
F
SD
F
SD
F
SD
F
SDFSDF
F
HD
F
SD
F http://www.AECOM.com
27777 Franklin Road, Suite 2000
Southfield, MI 48034
United States
P: 248 204 5900 F: 248 204 5901
UPGRADE
HVAC
MULTIPLE
FACILITIES
BUILDING 129
ELECTRICAL
PLANS
E105
NORTH
FIRST FLOOR
DEMOLITION PLAN
NORTH
FIRST FLOOR
NEW WORK PLAN
ELECTRICAL KEYED NOTES:
DISCONNECT AND REMOVE ALL ASSOCIATED CONDUIT AND WIRE FROM BOILERS AND ASSOCIATED PUMPS/EQUIPMENT, CU-1, AND UNIT HEATER (CROSS HATCHED) BACK TO SOURCE. LABEL BREAKERS
SPARE, UPDATE PANEL DIRECTORY.
REUSE EXISTING 40A, 2P SPARE CIRCUIT BREAKER IN LP-B, CIRCUITS 35 & 37 FOR NEW ACCU-129-1.
REMOVE EXISTING 40A, 2P SPARE CIRCUIT BREAKER IN LP-B, CIRCUITS 31 & 33 AND INSTALL (1) NEW
20A, 2P CIRCUIT BREAKER FOR EUH-129-1.
REFER TO THE ELECTRICAL CONNECTION EQUIPMENT SCHEDULE ON THIS DRAWING FOR AL;L
CIRCUITING INFORMATION.
REUSE EXISTING CIRCUIT, VERIFY IN FIELD.
USE SPARE 20A, 1P CIRCUIT BREAKER IN PANEL INDICATED, REFER TO PROJECT NOTES FOR
EXTERIOR GFCI RECEPTACLE INFORMATION.
EXISTING 2X4, FLUORESCENT LIGHT FIXTURES WITH (4) LAMPS SHALL BE DISCONNECTED AND
REMOVED CLEANED AND RE-LAMPED FOR RE-INSTALLATION. REUSE THE EXISTING LIGHTING
CIRCUIT EXTEND AS REQUIRED.
SUPPORT EXISTING CONDUITS ABOVE THE LAY-IN CEILING AND BELOW 12"X12" CEILING FROM THE
BUILDING STRUCTURE, THIS APPLIES FOR THE ENTIRE BUILDING.
SUPPORT EXISTING COMMUNICATION CABLES ABOVE THE LAY-IN CEILING AND BELOW 12"X12"
CEILING FROM THE BUILDING STRUCTURE UTILIZING 'J' HOOKS, THIS APPLIES FOR THE ENTIRE
BUILDING..
REMOVE ALL ABANDONED COMMUNICATION CABLES (CUT CABLES) BACK TO COMMUNICATION ROOM.
THIS APPLIES FOR THE ENTIRE BUILDING.
RELOCATE CEILING MOUNTED FIRE ALARM DEVICES TO NEW CEILING . COORDINATE WITH THE
CONTRACTING OFFICER. THIS APPLIES FOR THE ENTIRE BUILDING.
DISCONNECT AND REMOVE RECESSED DOWN LIGHTS AND ASSOCIATED SWITCHES INCLUDING ALL
CONDUIT AND WIRE BACK TO SOURCE.
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
GENERAL NOTES:
1. REFER TO DRAWING E-001 FOR SYMBOL LIST PROJECT NOTES.
ELECTRICAL CONNECTION SCHEDULE
EQUIPMENT
LOCATION
NEW
EQUIPMENT
ID
VOLTAGE/
PHASE LOAD VA PANEL
BRANCH O.C.P
TYPE CONNECTION WIRE/CONDUIT REMARKSCIRCUIT
NUMBER O.C.P SIZE
MECH. RM. AHU-129-1 120V-1ɸ 1644.0 LP-A 19 EX. 20A-1P HARDWIRED 2#12, 1#12GRD, 3/4"C. USE EXISTING CIRCUIT BREAKER
EXTERIOR BLD. ACCU-129-1 208V-1ɸ 4,930.0 LP-B 35, 37 EX.40A-2P HARDWIRED 2#8, 1#10GRD, 3/4"C. PROVIDE NEW CIRCUIT BREAKER
MECH. RM. EUH-129-1 208V-1ɸ 2000.0 LP-B 31, 33 NEW
20A-2P
HARDWIRED 2#12, 1#12GRD, 3/4"C. PROVIDE NEW CIRCUIT BREAKER
VESTIBULE EUH-129-2 120V-1ɸ 1500.0 LP-A 9 EX. 20A-1P HARDWIRED 2#12, 1#12GRD, 3/4"C. USE EXISTING CIRCUIT BREAKER
TOILET RM. 1 EUH-129-3 120V-1ɸ 1500.0 LP-A 11 EX. 20A-1P HARDWIRED 2#12, 1#12GRD, 3/4"C. USE EXISTING CIRCUIT BREAKER
TOILET RM. 2 EUH-129-4 120V-1ɸ 1500.0 LP-A 13 EX. 20A-1P HARDWIRED 2#12, 1#12GRD, 3/4"C. USE EXISTING CIRCUIT BREAKER
(TYP.)
EX.
60A-2P
WP
LOAD SUMMARY
LOAD REMOVED 16,550.4VA
LOAD ADDED 13,074.0VA
NET LOAD REDUCED 3,476.4VA
LP-A-6 WP
NORTH
FIRST FLOOR LIGHTING
DEMOLITION PLAN
NORTH
FIRST FLOOR LIGHTING
NEW WORK PLAN
ARCHITECTURAL KEYED NOTES:
REMOVE EXISTING LAY-IN ACOUSTIC PANELS, GRID AND SUSPENSION SYSTEM.
NOTE: SUSPENSION SYSTEM MAY BE ATTACHED TO CEILING ABOVE (WHICH HAS BEEN IDENTIFIED AS
HAVING ASBESTOS CONTAINING MATERIALS - ACM ). SEE ASBESTOS NOTES ON THIS SHEET.
REMOVE EXISTING SURFACE MOUNTED, ACOUSTIC TILES (AND GLUE PADS) FROM EXISTING PLASTER
CEILING. PATCH ANY AREAS OF EXISTING PLASTER DAMAGED DURING TILE /GLUE REMOVAL -
PROVIDE A SMOOTH LEVEL SURFACE. NOTE: THIS CEILING HAS BEEN IDENTIFIED AS HAVING
ASBESTOS CONTAINING MATERIALS - ACM ). SEE ASBESTOS NOTES ON THIS SHEET
PROVIDE NEW LAY-IN ACOUSTICAL CEILING PANELS -
BASIS OF DESIGN MANUFACTURER - ARMSTRONG
PRODUCT NUMBER - 534
PATTERN - CIRRUS
COLOR - WHITE
PROVIDE NEW METAL GRID SUSPENSION SYSTEM -
BASIS OF DESIGN MANUFACTURER - ARMSTRONG
PRODUCT NUMBER - PRELUDE XL
PATTERN - CIRRUS
COLOR - WHITE
NOTE: INSTALL NEW GRID SYSTEM AT THE SAME ELEVATION AS EXISTING GRID BEING REMOVED (EXCEPT
AT THE (2) ROOMS INDICATED ON THE LIGHTING PLAN - INSTALL @ 8'-0" A.F.F.
A1
A2
A3
A4
1. CONTRACTOR SHALL INCLUDE (IN THEIR BID) THE ABATEMENT OF ASBESTOS CONTAINING BUILDING MATERIALS (ACBM) REMOVED OR DISTURBED WHILE PERFORMING THEIR WORK AND/0R WHERE INDICATED
ON THE DRAWINGS .
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED, CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE. ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH WING ENVIRONMENTAL MANAGEMENT
OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING HAZARDOUS
MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING MATERIALS ON EXTERIOR
DUCTWORK AT BUILDING 168
5. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING INSULATION ON PLUMBING AND MECHANICAL PIPING NOTED FOR DEMOLITION AND/OR ALTERATION. REFER TO MECHANICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
ASBESTOS ABATEMENT NOTES
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT (LBP) EXPOSURE IN
ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS AND/OR LEAD
IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. COPIES OF ASBESTOS INSPECTION REPORT FOR BUILDINGS AND AREAS IDENTIFIED AS HAVING ASBESTOS
CONTAINING MATERIALS ARE AVAILABLE UPON REQUEST
ASBESTOS/LEAD DISCOVERY NOTES
INSTALL CLG. GRID
@ 8'-0" A.F.F. (@ THESE
ROOMS ONLY)
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text Engineer/Consultants
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text Project Number:
AutoCAD SHX Text File:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Designed By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Mark
AutoCAD SHX Text Date
AutoCAD SHX Text Description
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text Scale:
AutoCAD SHX Text Date:
AutoCAD SHX Text 60505971
AutoCAD SHX Text
02/26/2019 - 100% SUBMITTAL
AutoCAD SHX Text
PTC
AutoCAD SHX Text
PTC
AutoCAD SHX Text
DB
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 4'
AutoCAD SHX Text 12'
AutoCAD SHX Text
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 4'
AutoCAD SHX Text 12'
AutoCAD SHX Text
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 4'
AutoCAD SHX Text 12'
AutoCAD SHX Text
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 4'
AutoCAD SHX Text 12'
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
ETR
AutoCAD SHX Text
8/15/19 ADDENDUM #1
| Addendum 1 Write-up - 2019_08_15 |
| M105-AD1 |
| M105-A-AD1 |
| E105-AD1 |
File details come from the government source that posted it.