AF_Form_66.pdf
PDF 88 KB Posted
- Attached to
- Repair Multiple Bldg's HVAC Federal contract opportunity
- Solicitation number
- W912JB-19-B-5003
About this file
Submittal Document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract_Multiple_HVAC.pdf | ||
| Bid_Sign_In_Sheet.pdf | ||
| W912JB-19-B-5003_AMENDMENT_0002.pdf | ||
| RFI_DOCUMENT_1_(002).pdf | ||
| Upgrade_Add_No_1_(Proprietary).pdf | ||
| W912JB-19-B-5003_AMENDMENT_0001.pdf | ||
| W912JB19B5003_Amendment_0001a.pdf | ||
| Sign_In_Sheet.pdf | ||
| Site_Visit_Minutes_HVAC.pdf | ||
| SOW_Upgrade_HVAC_Multiple_Facilities_-_Rev_00_2.pdf | ||
| Multiple_Bldg_HVAC_DDC___Brand_Name_Justification.pdf | ||
| Drawings_1.pdf | ||
| Drawings_2.pdf | ||
| Drawings_4.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| Drawings_3.pdf | ||
| W912JB-19-B-5003_Solicitation.pdf | ||
| Specifications.pdf | ||
| Presolicitation_Notice_Repair_Multiple_HVAC.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 152068
APPROVED DISAPPROVED
01.00.00 Submittal Schedule - AF Form 66
01.00.00
Transfer and Acceptance of DOD Real
Property - DD Form 1354
01.00.00
Contractor Hazardous Material Identification -
SANGB Form 23
01.00.00
Solid Waste Recycling and Disposal
Reporting Form
01.00.10 Affirmative Procurement Reporting Form
01.00.00 DD Form 1354
01.32.00 Construction Schedule
01.32.33
Construction Photos
Construction Installation Shop Drawings
01.35.23 Safety Documentation as stated
01.40.00 Schedule of Test and Inspections
01.40.00 Permits, Licenses and Certificates
01.40.00 Quality Control Plan
01.74.00 Warranties
01.75.00
Starting System -Testing, Adjusting &
Balancing Reports
01.78.23 O & M Data
01.78.39 Project Record Documents
01.79.00 Instructional Training Program is applicable
23.01.30.52
Existing HVAC Air Distribution System
Cleaning
Product Data
23.05.13
Common Motor Requirements for HVAC
Equipment
Product Data
23.05.17 Sleeves and Sleeve Seal for HVAC Piping
19 Product Data for General Duty Valves
20 23.05.18 Escutcheons for HVAC Piping
21 Product Data
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
A N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E R
'S
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
22 23.05.19 Meters and Gages for HVAC Piping
Product Data for Meters and Gages
Shop Drawing
O & M Data
Warranty
23 23.05.23 General-Duty Valves for HVAC Piping
Product Data for General Duty Valves
22.05.29
Hangers & Supports for HVAC Piping &
Equipment
Product Data
Shop Drawing
O & M Data
Warranty
23.05.53
Identifcation for HVAC Piping and
Equipment
Product Data
Sample for ID
Equipment Label Schedule / Scheme
Valve Schedule
23.05.93 Testing, Adjusting, & Balancing for HVAC
Qualification Data
Contract Document Examination Report
Certified TAB Reports
26 23.07.13 Duct Insulation
Product Data on Duct Insulation
Samples of Insulation
27 23.07.19 HVAC Piping Insulation
Product Data on Insulation
Samples of Insulation
28 23.09.00 Instrumentation & Control for HVAC
Product Data on DDC System & Controls
Shop Drawing
Data Comm. Protocol Certificates
29 23.09.23.11 Control Valves
Product Data
Shop Drawing
O & M Data
Warranty
30 23.09.23.12 Control Dampers
Product Data
Shop Drawing
O & M Data
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
Warranty
31 23.09.93.11 Sequence of Operation for HVAC DDC
Control Sequences
32 23.11.23 Facility Natural Gas Piping
Product Data
Shop Drawing
Piping Schedule and Specialties
Service Meters
33 23.21.13 Hydronic Piping
Product Data on the following Material:
Air Control Devices
Hydronic Specialties
O & M Data
34 23.21.16 Hydronic Piping Specialities
Product Data
Shop Drawing
Warranty
O & M Data
35 23.21.23 Hydronic Pumps
Product Data
Shop Drawing
Warranty
O & M Data
36 23.23.00 Refrigerant Piping
Product Data
Piping Schedule
Piping Specialties
O & M Data
23.25.13
Water Treatment for Closed-Loop
Hydronic Systems
Product Data
Shop Drawing
Warranty
O & M Data
38 23.31.13 Metal Ducts
Product Data on the following material:
Sealants and Gaskets
Seismic Restraint Devices
Shop Drawings
39 23.33.00 Air Duct Accessories
Product Data
Shop Drawings for Duct Accessories
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
40 23.34.16 Centrifugal HVAC Fans
Product Data
Shop Drawing
Warranty
O & M Data
41 23.34.23 HVAC Power Ventilators
Product Data on items indicated
O & M Data
23.36.00 Air terminal Units
Product Data
Shop Drawing
Warranty
O & M Data
42 23.37.13 Diffusers, Registers, & Grilles
Product Data on the following material:
CD: Ceiling Diffusers
CG: Exhaust/Return Grille
43 23.52.16 Condensing Boilers
Product Data
Shop Drawing
Warranty
O & M Data
44 23.54.16.13 Gas-Fired Furnaces
Product Data
Shop Drawing
Warranty
O & M Data
45 23.55.23 Gas-Fired Radiant Heaters
Product Data
Shop Drawing
Warranty
O & M Data
23.62.00
Packaged Compressor and Condensing
Units
Product Data
Shop Drawing
Warranty
O & M Data
23.73.13
Modular Indoor Central-Station Air-
Handling Units
Product Data
Shop Drawing
Warranty
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O & M Data
23.73.33.16
Indoor, Indirect-Fired Heating and
Ventilating Units
Product Data
Shop Drawing
Warranty
O & M Data
23.74.16.11
Packaged, Small-Capacity, Rooftop Air-
Conditioning Units
Product Data
Shop Drawing
Warranty
O & M Data
23.81.13.13
Packaged Terminal Air-Conditioners, Outdoor, Wall-Mounted Units
Product Data
Shop Drawing
Warranty
O & M Data
23.81.23.13
Computer-Room Air-Conditioners, Ceiling-
Mounted Units
Product Data
Shop Drawing
Warranty
O & M Data
52 23.82.39.16 Propeller Unit Heaters
Product Data
Shop Drawings
O & M Data
Warranty
53 23.82.39.19 Wall and Ceiling Unit Heaters
Product Data
Shop Drawings
O & M Data
Warranty
26.05.19
Low-Voltage Electrical Power Conductors
& Cables
Product Data for Each Type of Cable
26.05.26
Grounding & Bonding for Electrical
Systems
O & M Data
26.05.33 Raceway & Boxes for Electrical Systems
Product Data on the following Material:
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
Metal Conduit & Tubing
Metal Wireways
Surface Raceways
Boxes, Enclosures, Cabinets
56 26.24.16 Panelboards
Product Data
Shop Drawings
O & M Data
Warranty
57 26.28.16 Enclosed Switches
Product Data
Shop Drawings
O & M Data
58 26.29.13 Enclosed Controllers
Product Data
Shop Drawings
APPROVED DISAPPROVED
Spec Section
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N
D C
L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Upgrade HVAC Multiple Facilities W1912JB-13-D4005-0012
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O T
H E
R
M
A T
E R
IA
L o r
D A
T A
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
File details come from the government source that posted it.