RFI_DOCUMENT_1_(002).pdf

PDF 323 KB Posted

Attached to
Repair Multiple Bldg's HVAC Federal contract opportunity
Solicitation number
W912JB-19-B-5003
Issued by
Department of the Army Michigan Army National Guard

About this file

RFI's

View the file

Other files for this federal contract opportunity

Other files attached to Repair Multiple Bldg's HVAC, newest first.
File Type Posted
Bid_Opening_Abstract_Multiple_HVAC.pdf PDF
Bid_Sign_In_Sheet.pdf PDF
W912JB-19-B-5003_AMENDMENT_0002.pdf PDF
Upgrade_Add_No_1_(Proprietary).pdf PDF
W912JB-19-B-5003_AMENDMENT_0001.pdf PDF
W912JB19B5003_Amendment_0001a.pdf PDF
Sign_In_Sheet.pdf PDF
Site_Visit_Minutes_HVAC.pdf PDF
Drawings_3.pdf PDF
W912JB-19-B-5003_Solicitation.pdf PDF
Multiple_Bldg_HVAC_DDC___Brand_Name_Justification.pdf PDF
Drawings_1.pdf PDF
Drawings_2.pdf PDF
Drawings_4.pdf PDF
Vetting_Access_Request_List_Blank.pdf PDF
AF_Form_66.pdf PDF
SOW_Upgrade_HVAC_Multiple_Facilities_-_Rev_00_2.pdf PDF
Specifications.pdf PDF
Presolicitation_Notice_Repair_Multiple_HVAC.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB-19-B-5003

SELFRIDGE BASE REPAIR MULTIPLE HVAC

RFI’S

1. Is the above project SALES TAX EXEMPT on equipment and material being used?

Please refer to the solicitation FAR Clause 52.229-3. All applicable taxes shall be included in the pricing for this contract. The Government itself is exempt from payment of taxes under this Clause, but contractors are not exempt from payment of taxes for supplies or services under a government contract. Under 26 U.S.C. 5000C, a foreign individual/entity who has a contract with the federal government has an additional tax of 2%. How this tax on a foreign company or owner is collected would have to be asked of the Agency responsible for tax law.

2. Does the project includes TEMP HVAC?

YES: Only temporary heat would be required to keep the building warm if the contractor takes down the systems in cold weather. This is a normal part of every contract to include temporary heat if required by the contractor. They will be in possession of the building and responsible to maintain heat.

There is no need or provision to provide temporary AC or ventilation.

3. Does the project requires COORDINATION DRAWINGS for the HVAC Installations?

YES: The contractor will provide coordination meetings for phasing in the various buildings and some of these coordination meeting may require the contractor to generate drawings and sketches to show coordination items , such as crane locations in relationships to the building and egress etc. Or demo and install locations with timing to coordinate with the building occupants.