Drawings_-_MBMV162092_Alter_Building_6913.pdf

PDF 8 MB Posted

Attached to
Alter Bldg. 6913 Federal contract opportunity
Solicitation number
W912JB-18-B-8002
Issued by
Department of the Army Michigan Army National Guard

About this file

Drawing Package

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Know what's below.

before you dig.Call

R

CS-001 COVER SHEET

SHEET INDEX

ARCHITECTURAL

A-100 FLOOR PLAN - DEMOLITION

GENERAL

NO.

06-01-2018

DATE

LAKE

MICHIGAN

LAKE

SUPERIOR

LAKE

ERIE

LAKE

HURON

A-210

PROJECT LOCATION

FLOOR PLAN

A-101 REFLECTED CEILING PLAN - DEMOLITION

A-610 REFLECTED CEILING PLAN

Sheet Number:

Project Number:

Sheet Title:

Drawn:

Checked:

Approved:

Seal:

45650 Grand River Avenue

Novi, Michigan 48374

Ph: (248)349-4500 • Fax: (248)349-1429

Issued For Date

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND

CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE

PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018

Project:

Client:

Corporate Headquarters

Lansing • Gaylord • Sault Ste. Marie

Key Plan:

Novi • Wyandotte • Muskegon www.sidockgroup.com

Sidock Group www.sidockarchitects.com

No Scale

ARCHITECTSENGINEERS CONSULTANTS

147 W. Main Street, Suite 303

Gaylord, Michigan 44735

Ph: (989)705-8400 • Fax: (989)705-8403

Gaylord Office

BATTLE CREEK

ANG

ALTER BUILDING

PROJECT: MBMV 162092

516595

06-01-18 B3 SUBMITTAL

A-901 ROOM, DOOR, WINDOW SCHED. - WINDOW, DOOR, FRAME ELEV'S

PLUMBING

M-110 HVAC DEMOLITION PLAN

MECHANICAL

E-101 ELECTRICAL DEMOLITION PLAN

ELECTRICAL

E-201 ELECTRICAL POWER PLAN

E-202 ELECTRICAL LIGHTING PLAN

M-210 HVAC FLOOR PLAN

M-211 SCHEDULES AND DETAILS

P-201 SANITARY / PIPING ISOMETRIC

A-910 FLOOR FINISH PLAN

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

06-01-2018

A-801 DETAILS / WALL SECTION 06-01-2018

P-210 PIPING PLAN 06-01-2018

CS-001

HL

BB

BB

COVER SHEET

A-211 ENLARGED FLOOR PLAN 06-01-2018

A-501 INTERIOR ELEVATIONS 06-01-2018

BATTLE CREEK, MI. AREA MAP

NOT TO SCALE

CS-002 GENERAL NOTES - ABBREVIATION LEGEND 06-01-2018

AutoCAD SHX Text

B-3 SUBMITTAL

AutoCAD SHX Text

BATTLE CREEK AIR NATIONAL GUARD

AutoCAD SHX Text

BATTLE CREEK, MICHIGAN

AutoCAD SHX Text O

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text

IAE

AutoCAD SHX Text

SCI

AutoCAD SHX Text

PHI

AutoCAD SHX Text

AE

AutoCAD SHX Text

ENT

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text

GEO

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

GRA

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text

US

AutoCAD SHX Text

PE

AutoCAD SHX Text

NF

AutoCAD SHX Text

IN

AutoCAD SHX Text

IA

AutoCAD SHX Text

NE

AutoCAD SHX Text

TR

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

QUE

AutoCAD SHX Text I

AutoCAD SHX Text

CO

AutoCAD SHX Text

AM

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text

ALTER BUILDING 6913

AutoCAD SHX Text

PROJECT NO. MBMV 162092

AutoCAD SHX Text

SCHOOLCRAFT

AutoCAD SHX Text

MANISTEE

AutoCAD SHX Text

OCEANA

AutoCAD SHX Text

MUSKEGON

AutoCAD SHX Text

MASON

AutoCAD SHX Text

BERRIEN

AutoCAD SHX Text

GOGEBIC

AutoCAD SHX Text

DICKINSON

AutoCAD SHX Text

MENOMINEE

AutoCAD SHX Text

DELTA

AutoCAD SHX Text

ONTONAGON

AutoCAD SHX Text

IRON

AutoCAD SHX Text

BARAGA

AutoCAD SHX Text

HOUGHTON

AutoCAD SHX Text

KEWEENAW

AutoCAD SHX Text

MARQUETTE

AutoCAD SHX Text

ALGER

AutoCAD SHX Text

ST. CLAIR

AutoCAD SHX Text

HILLSDALE

AutoCAD SHX Text

CASS

AutoCAD SHX Text

ST. JOSEPH

AutoCAD SHX Text

BRANCH

AutoCAD SHX Text

LENAWEE

AutoCAD SHX Text

MONROE

AutoCAD SHX Text

GLADWIN

AutoCAD SHX Text

MIDLAND

AutoCAD SHX Text

JACKSON

AutoCAD SHX Text

BARRY

AutoCAD SHX Text

VAN BUREN

AutoCAD SHX Text

ALLEGAN

AutoCAD SHX Text

KALAMAZOO

AutoCAD SHX Text

OTTAWA

AutoCAD SHX Text

KENT

AutoCAD SHX Text

EATON

AutoCAD SHX Text

CALHOUN

AutoCAD SHX Text

IONIA

AutoCAD SHX Text

CLINTON

AutoCAD SHX Text

MECOSTA

AutoCAD SHX Text

OSCEOLA

AutoCAD SHX Text

NEWAYGO

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

ISABELLA

AutoCAD SHX Text

MONTCALM

AutoCAD SHX Text

GRATIOT

AutoCAD SHX Text

CLARE

AutoCAD SHX Text

INGHAM

AutoCAD SHX Text

WASHTENAW

AutoCAD SHX Text

LIVINGSTON

AutoCAD SHX Text

SHIAWASSEE

AutoCAD SHX Text

GENESEE

AutoCAD SHX Text

OAKLAND

AutoCAD SHX Text

WAYNE

AutoCAD SHX Text

LAPEER

AutoCAD SHX Text

MACOMB

AutoCAD SHX Text

TUSCOLA

AutoCAD SHX Text

SAGINAW

AutoCAD SHX Text

ARENAC

AutoCAD SHX Text

BAY

AutoCAD SHX Text

SANILAC

AutoCAD SHX Text

HURON

AutoCAD SHX Text

ANTRIM

AutoCAD SHX Text

GRAND TRAVERSE

AutoCAD SHX Text

WEXFORD

AutoCAD SHX Text

LELANAU

AutoCAD SHX Text

BENZIE

AutoCAD SHX Text

MISSAUKEE

AutoCAD SHX Text

ROSCOMMON

AutoCAD SHX Text

KALKASKA

AutoCAD SHX Text

CRAWFORD

AutoCAD SHX Text

OTSEGO

AutoCAD SHX Text

CHALEVOIX

AutoCAD SHX Text

EMMET

AutoCAD SHX Text

CHEBOYGAN

AutoCAD SHX Text

MACKINAC

AutoCAD SHX Text

OGEMAW

AutoCAD SHX Text

IOSCO

AutoCAD SHX Text

OSCODA

AutoCAD SHX Text

MONTMORENCY

AutoCAD SHX Text

ALCONA

AutoCAD SHX Text

ALPENA

AutoCAD SHX Text

PRESQUE ISLE

AutoCAD SHX Text

LUCE

AutoCAD SHX Text

CHIPPEWA

AutoCAD SHX Text C

AutoCAD SHX Text

NORTH

DETAIL REFERENCE SECTION REFERENCE

NORTH ARROW

BUILDING SECTION REFERENCEINTERIOR ELEVATION

ROOM NUMBER DOOR NUMBER PARTITION TYPE

SYMBOL LEGEND

A

ABBREVIATION DEFINITION

F

DEFINITION

ABBREVIATION LEGEND

M

DEFINITION

@ AT FD FLOOR DRAIN MAX MAXIMUM

ACC ACOUSTIC CEILING TILE FIN FINISH / FINISHED

MTL METALALUM ALUMINUM FL FLUSH

MEZZ MEZZANINEANOD ANODIZED FLR FLOOR

MIN MINIMUMFOUND FOUNDATION

MO MASONRY OPENING

FT FOOT / FEET

FTG FOOTING

N

B

NO NUMBER

BF BARRIER FREE

G

BOD BOTTOM OF DECK

GALV GALVANIZE(D)BOT BOTTOM

O

BRG BEARING

OC ON CENTER

H

OD OUTSIDE DIAMETERH HIGH

OHD OVERHEAD DOORHC HOLLOW CORE

HM HOLLOW METAL

C

HORIZ HORIZONTAL

P

COMP COMPACTED

HT HEIGHT

PEMB PRE-ENGINEERED METAL BUILDING

CONC CONCRETE

PERIM PERIMETER

CONT CONTINUOUS

PL PLATE

CPT CARPET

I

PLAM PLASTIC LAMINATE

CT CERAMIC TILE

ID INSIDE DIAMETER

PSF POUNDS PER SQUARE FOOTIN INCH / INCHES

PSI POUNDS PER SQUARE INCHINSUL INSULATED

PT PAINT

D

DIA DIAMETER

J

Q

DF DRINKING FOUNTAIN

DL DEAD LOAD

DN DOWN

DO DOOR OPENING

K

R

R RADIUS

E

RD ROOF DRAIN / ROLLING DOOR

ELEV ELEVATION

REINF REINFORCING

EQ EQUAL

RO ROUGH OPENING

EWC ELECTRIC WATER COOLER

L

EXP EXPANSION

LAV LAVATORY

LL LIVE LOAD

S

LLH LONG LEG HORIZONTAL SC SOLID CORE

LLV LONG LEG VERTICAL SCHED SCHEDULE

CMU CONCRETE MASONRY UNIT

CLR CLEAR

CLG CEILING

CL CENTER LINE

COL COLUMN

EC EXPOSED CONCRETE

SHT

DEFINITION

SHEET

SQ FT SQUARE FEET / FOOT

ST STAIN

STL STEEL

T

TEMP TEMPORARY

THRESH THRESHOLD

U

UNO

UNLESS NOTED OTHERWISE

V

VCT VINYL COMPOSITION TILE

VERT VERTICAL

W

W/ WITH

WB WALL BASE

WD WOOD

WWF WELDED WIRE FABRIC

X

Y

Z

ABBREVIATION ABBREVIATION ABBREVIATION

BK BLOCK

FRP FIBERGLAS REINFORCED PANEL(S)

GYP BD GYPSUM BOARD

HDW HARDWARE

IOHD INSULATED OVERHEAD DOOR

IRD INSULATED ROLLING DOOR

MT MARBLE THRESHOLD

PRE-FIN PRE-FINISHED

WG WIRED GLASS

TOS TOP OF STEEL

TYP TYPICAL

SC SOLID CORE

DOOR

XX

XX

SHEET#

ROOM NAME

DET.

SHEET

TITLE

SCALE: X/X" = 1'-0"

A

A-210

A

A-210

CEILING

HT

DEMO

DEMO

FIXTURE

NO.

A101

SIM

EXIST.

COLUMN

NEW

COLUMN

NO.

SHEET

SIM

PLAN DETAILDRAWING REFERENCE

TITLE

SCALE: X/X" = 1'-0"

WIN

CENTER LINE MATCHLINE WINDOW ELEVATION

SEE SHEET: A - 101

TRUE

NORTH

SHEET

NORTH

CO CLEAN OUT

MCS METAL CARPET STRIP

NTS NOT TO SCALE

WH WATER HEATER

Know what's below.

before you dig.Call

R

Sheet Number:

Project Number:

Sheet Title:

Drawn:

Checked:

Approved:

Seal:

45650 Grand River Avenue

Novi, Michigan 48374

Ph: (248)349-4500 • Fax: (248)349-1429

Issued For Date

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND

CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE

PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018

Project:

Client:

Corporate Headquarters

Lansing • Gaylord • Sault Ste. Marie

Key Plan:

Novi • Wyandotte • Muskegon www.sidockgroup.com

Sidock Group www.sidockarchitects.com

No Scale

ARCHITECTSENGINEERS CONSULTANTS

147 W. Main Street, Suite 303

Gaylord, Michigan 44735

Ph: (989)705-8400 • Fax: (989)705-8403

Gaylord Office

BATTLE CREEK

ANG

ALTER BUILDING

PROJECT: MBMV 162092

516595

06-01-18 B3 SUBMITTAL

CS-002

HL

BB

BB

GENERAL NOTES -

ABBRIVEIATION

LEGEND

AutoCAD SHX Text Insulation Provide sound attenuation batt insulation in wall surrounding toilet rooms, copy, machines, printers, mechanical, etc. All concealed batt insulation shall have kraft paper backing. Insulation shall be installed in such a manner as to allow free air flow from the soffit to the roof space. Ventilation of concealed roof space shall be maintained.

AutoCAD SHX Text Gypsum Board All gypsum board edges to be on solid blocking.

AutoCAD SHX Text Doors All interior doors shall be 1-3/4" thick, commercial grade, solid core, wood construction, stained and varnished. Face veneer shall be of standard commercial thickness not less than 1/28" before sanding. All exterior doors, except main entrance, shall be hollow metal construction provided with heavy duty commercial grade hardware. All hinges shall be provided with stainless steel pins, oil impregnated bronze bushings, or concealed ball bearing units. Swing out doors shall have non-removable pins. Interior doors shall receive a 12" high kickplate which protects within 1" of both sides and the bottom of the door. All exterior doors shall be equipped with closers. Exterior doors, except main entrance and employee entrance and receiving doors, shall be equipped with audible alarm devices. Provide closers on all toilet room doors. All doors shall be 6'-8" high unless otherwise noted.

AutoCAD SHX Text Before beginning any work at the site, inspect the existing building and determine the extent of existing finishes, specialties, casework, equipment, and other items that must be removed and reinstalled to perform the work defined in this contract. The architectural drawings show principal areas where work must be accomplished under the contract. Incidental work may also be necessary in areas not shown on the architectural plans due to changes affecting existing mechanical, electrical, plumbing, or other systems. Such incidental work is also part of the contract. Inspect those areas and ascertain work needed, and perform that work according with the contract requirements, at no additional cost. Dimensions to existing surfaces are to the finished face. Dimensions to new masonry are to rough face of the units. Masonry dimensions are nominal. Dimensions to new stud partitions are to the face of studs. Existing masonry block coursing is based on one course equals 8". New block coursing shall match existing. Existing brick coursing is based on three course equals 8". New brick coursing shall match existing. Do not drill or cut existing floor joist, beams, columns, or other structural elements, unless specifically indicated. Drill slabs where approved. Core drill circular openings through slabs. Line drill for rectangular openings through slabs. Make openings of proper size for conduits, ducts, pipes, and other items passing through openings. Protect existing work to remain from damage. Repair, patch, and finish, as applicable, to match adjacent existing finishes those existing surfaces damaged or newly exposed during the performance of the work under this contract. Where permanent removal of existing millwork, casework, cabinetwork, accessories, equipment, or furnishings are required, previously concealed surfaces are to match adjacent exposed surfaces. Where such surfaces are to remain exposed, patch previously concealed surfaces to match adjacent exposed surfaces. Where such surfaces are scheduled to receive the new finishes, prepare the surfaces to receive the new finishes. Where cutting of existing surfaces or removal of existing finishes is required to perform the work under this contract, and a new finish is not indicated, fill resulting openings and patch the surface after performing the work, and finish to match adjacent existing surfaces. Provide new lintels or headers over every new opening in both new and existing walls and partitions. Where match existing is indicated, new construction or finishes, as appropriate to the note, shall match the existing in every aspect. Junctures between existing masonry and patches or extensions shall be made to clean cut lines or neatly toothed in. Work shown is new unless specifically noted or otherwise indicated as existing.

AutoCAD SHX Text General Notes Before beginning work at the site, and throughout the source of the work, inspect and verify the location and condition of every item affected by the work under the contract. Report any discrepancies to the Architect before performing any work related to the inspection. Trade, product, or manufacturer's names, or catalog numbers shown on the plans for new products are to establish quality required. In each case add, by inference, after trade, product, or manufacturer's name, the phrase, "or approved equal". Determine location of partitions not dimensioned, by their relation to column face center, window jamb, or other similar fixed item. Do not scale drawings (USE DIMENSIONS). All building plans shall be submitted to the Building Official for plan review. Notify Architect of any plan review comments prior to construction. All trades shall conform with all applicable Federal, State, Local, and OSHA codes, rules and regulations. In case of conflict, the most stringent requirement shall apply.

C

Sheet Number:

Project Number:

Sheet Title:

Drawn:

Checked:

Approved:

Seal:

45650 Grand River Avenue

Novi, Michigan 48374

Ph: (248)349-4500 • Fax: (248)349-1429

Issued For Date

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND

CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE

PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018

Project:

Client:

Corporate Headquarters

Lansing • Gaylord • Sault Ste. Marie

Key Plan:

Novi • Wyandotte • Muskegon www.sidockgroup.com

Sidock Group www.sidockarchitects.com

No Scale

ARCHITECTSENGINEERS CONSULTANTS

147 W. Main Street, Suite 303

Gaylord, Michigan 44735

Ph: (989)705-8400 • Fax: (989)705-8403

Gaylord Office

BATTLE CREEK

ANG

ALTER BUILDING

PROJECT: MBMV 162092

516595

FLOOR PLAN - DEMOLITION

SCALE:

" = 1'-0"

REMOVE EXISTING WALL

CONSTRUCTION, DOORS,

AND DOOR FRAMES

REMOVE EXISTING WALL

CONSTRUCTION, DOORS,

AND DOOR FRAMES

REMOVE EXISTING

MILLWORK AND WALL

CONSTRUCTION

REMOVE EXISTING

DOORS AND FRAMES

REMOVE EXISTING

MILLWORK AND WALL

CONSTRUCTION

REMOVE EXISTING DOORS

AND FRAMES

REMOVE EXISTING WALL

CONSTRUCTION, DOORS,

AND DOOR FRAMES

REMOVE EXISTING DOOR,

SIDELITE, AND DOOR

FRAME

REMOVE EXISTING WALL

CONSTRUCTION AS

REQUIRED FOR NEW

OPENING

REMOVE EXISTING WALL

CONSTRUCTION AS

REQUIRED FOR NEW

OPENING

REMOVE EXISTING

WALL CONSTRUCTION

AS REQUIRED FOR

NEW OPENING

REMOVE EXISTING

WALL CONSTRUCTION,

DOORS, AND DOOR

FRAMES

REMOVE EXISTING WALL

CONSTRUCTION AS

REQUIRED FOR NEW

OPENING

REMOVE EXISTING DOOR

AND DOOR FRAME

REMOVE EXISTING

DOORS AND FRAMES

INCLUDING JAM FRAMING

REMOVE EXISTING

MIRROR WALL FINISH

REMOVE EXISTING

CONCRETE SIDEWALK

AND CURB AS REQUIRED

FOR NEW RAMP

REMOVE EXISTING

LOCKERS AND

BENCH

REMOVE EXISTING

SHOWER & CAP

EXIST. WATER LINES

V

I

F

14'-1

10'-3"+/-

EXISTING

CARPETING

TO REMAIN

(TYP. U.N.O.)

EXISTING

FLOORING

TO REMAIN

REMOVE EXISTING DOOR

AND DOOR FRAME AND

HARDWARE (TYP.)

REMOVE EXISTING

WINDOW

CONSTRUCTION

EXISTING FLOORING

TO BE REMOVED IN

ALL HATCHED AREAS

CONFIRMATION REQUIRED FOR

RECENTLY CONSTRUCTED OFFICE

REAR PROJECTION ROOM

STORAGE

MOBILITY

STOR.

VEST.

PILOTS BREIFING ROOM

MALE PILOTS LOCKER ROOM

STOR.

BREAK ROOM

MECHANICAL

RAFT REPAIR

POST FLIGHT AREA

PERSONAL EQUIP. OFFICE

CONF. ROOM

AIR COMMANDER

SECRETARY

AIR FORCE ADVISOR

VEST.

DCO OFFICE

FLIGHT PLANNING

AIR OPER> OFFICER

VEST.

INTEL OFFICE

VAULT

WORKROOM

STORAGE

TELE.

STOR.

VEST.

TESTING

MEDICAL

VEST.

CL.

VEST.

SOF COUNTER

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

OPS ADMINISTRATION

CORRIDOR

SCEDULING

COMAND POST

ADMIN.

TRAINING

STORAGE

OPERATIONS

STAFF

WOMEN'S

TOILET

BREIFING

ROOM

A-100

HL

BB

BB

FLOOR PLAN -

DEMOLITION

06-01-18 B3 SUBMITTAL

REMOVE EXIST.

WALL, DOORS, &

DOOR FRAMES

EXISTING SIDEWALK

TO REMAIN

V

I

F

REMOVE EXISTING

PAVING

REMOVE /

RESHAPE EXIST.

GRADE FOR

NEW PAVING

AREA OF SLAB

DEMOLITION

REMOVE WALL

CONSTRUCTION

REMOVE DOOR

& FRAME

ASSEMBLY

PILOT EQUIP STORAGE

LAUNDRY

BREIFING

ROOM

BREIFING

ROOM

INTELLIGENCE

PLANS

OPERATIONS/

MAP MAKING

BREIFING

ROOM

SKYLIGHT

AREA

COCKPIT

TRAINING

EJECTION

TRAINING

NON-PILOT

LOCKER RM.

SHOWER/

DRYING

MEN'S

TOILET

VEST.

WEAPONS

& TACTICS

COMMAND

POST

CONT. SUPPORT

STAFF

SQUADRON

COMMANDER

FIRST

SARGENT

ORDERLY

ROOM

FLIGHT

COMMANDER

STAND.

EVALUATION

INSPECTION

OFFICE

REMOVE EXISTING

WINDOW AND FRAME

4'-2

" 5'-10

20'-4

WORK ZONE KEY PLAN

NO SCALE

BASE BID

ABI 1

ABI 2

AutoCAD SHX Text C

AutoCAD SHX Text

1. REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND/OR CONSTRUCTION PROCESS AND AND/OR CONSTRUCTION PROCESS AND CONSTRUCTION PROCESS AND CONSTRUCTION PROCESS AND PROCESS AND PROCESS AND AND AND DISPOSE OFF SITE IN A SAFE AND LEGAL MANNER. 2. PROVIDE TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROVIDE TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. FOR INTERIOR DURING CONSTRUCTION PROCESS. FOR INTERIOR DURING CONSTRUCTION PROCESS. INTERIOR DURING CONSTRUCTION PROCESS. INTERIOR DURING CONSTRUCTION PROCESS. DURING CONSTRUCTION PROCESS. DURING CONSTRUCTION PROCESS. CONSTRUCTION PROCESS. CONSTRUCTION PROCESS. PROCESS. PROCESS. TEMPORARY CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING PREVENT ANY DAMAGE OR VANDALISM TO EXISTING PREVENT ANY DAMAGE OR VANDALISM TO EXISTING ANY DAMAGE OR VANDALISM TO EXISTING ANY DAMAGE OR VANDALISM TO EXISTING DAMAGE OR VANDALISM TO EXISTING DAMAGE OR VANDALISM TO EXISTING OR VANDALISM TO EXISTING OR VANDALISM TO EXISTING VANDALISM TO EXISTING VANDALISM TO EXISTING TO EXISTING TO EXISTING EXISTING EXISTING INTERIOR SPACE. 3. PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO AT LOCATIONS INDICATED AND/OR AS REQUIRED TO AT LOCATIONS INDICATED AND/OR AS REQUIRED TO LOCATIONS INDICATED AND/OR AS REQUIRED TO LOCATIONS INDICATED AND/OR AS REQUIRED TO INDICATED AND/OR AS REQUIRED TO INDICATED AND/OR AS REQUIRED TO AND/OR AS REQUIRED TO AND/OR AS REQUIRED TO AS REQUIRED TO AS REQUIRED TO REQUIRED TO REQUIRED TO TO TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL HAZARDS, NOISE AND DUST. COORDINATE ALL HAZARDS, NOISE AND DUST. COORDINATE ALL NOISE AND DUST. COORDINATE ALL NOISE AND DUST. COORDINATE ALL AND DUST. COORDINATE ALL AND DUST. COORDINATE ALL DUST. COORDINATE ALL DUST. COORDINATE ALL COORDINATE ALL COORDINATE ALL ALL ALL LOCATIONS WITH ARCHITECT. 4. PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AND EXIT LOCATIONS. COORDINATE ALL AND EXIT LOCATIONS. COORDINATE ALL EXIT LOCATIONS. COORDINATE ALL EXIT LOCATIONS. COORDINATE ALL LOCATIONS. COORDINATE ALL LOCATIONS. COORDINATE ALL COORDINATE ALL COORDINATE ALL COORDINATE ALL ALL ALL LOCATION WITH ARCHITECT. 5. CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS FIRE PROTECTION COMPONENTS FOR ALL PORTIONS FIRE PROTECTION COMPONENTS FOR ALL PORTIONS PROTECTION COMPONENTS FOR ALL PORTIONS PROTECTION COMPONENTS FOR ALL PORTIONS COMPONENTS FOR ALL PORTIONS COMPONENTS FOR ALL PORTIONS FOR ALL PORTIONS FOR ALL PORTIONS ALL PORTIONS ALL PORTIONS PORTIONS PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION. 6. ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS AS CALLED FOR ON THE DRAWINGS AND/OR AS AS CALLED FOR ON THE DRAWINGS AND/OR AS CALLED FOR ON THE DRAWINGS AND/OR AS CALLED FOR ON THE DRAWINGS AND/OR AS FOR ON THE DRAWINGS AND/OR AS FOR ON THE DRAWINGS AND/OR AS ON THE DRAWINGS AND/OR AS ON THE DRAWINGS AND/OR AS THE DRAWINGS AND/OR AS THE DRAWINGS AND/OR AS DRAWINGS AND/OR AS DRAWINGS AND/OR AS AND/OR AS AND/OR AS AS AS REQUIRED TO ACCOMMODATE THE RENOVATION WORK. 7. CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, FLOORS AND CEILINGS WHERE ARCHITECTURAL, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND CEILINGS WHERE ARCHITECTURAL, AND CEILINGS WHERE ARCHITECTURAL, CEILINGS WHERE ARCHITECTURAL, CEILINGS WHERE ARCHITECTURAL, WHERE ARCHITECTURAL, WHERE ARCHITECTURAL, ARCHITECTURAL, ARCHITECTURAL, STRUCTURAL, MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ARE REMOVED AS A RESULT OF THE DEMOLITION ARE REMOVED AS A RESULT OF THE DEMOLITION REMOVED AS A RESULT OF THE DEMOLITION REMOVED AS A RESULT OF THE DEMOLITION AS A RESULT OF THE DEMOLITION AS A RESULT OF THE DEMOLITION A RESULT OF THE DEMOLITION A RESULT OF THE DEMOLITION RESULT OF THE DEMOLITION RESULT OF THE DEMOLITION OF THE DEMOLITION OF THE DEMOLITION THE DEMOLITION THE DEMOLITION DEMOLITION DEMOLITION OPERATIONS. 8. CARRY OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CARRY OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR AND COOPERATION WITH STRUCTURAL TRADES FOR AND COOPERATION WITH STRUCTURAL TRADES FOR COOPERATION WITH STRUCTURAL TRADES FOR COOPERATION WITH STRUCTURAL TRADES FOR WITH STRUCTURAL TRADES FOR WITH STRUCTURAL TRADES FOR STRUCTURAL TRADES FOR STRUCTURAL TRADES FOR TRADES FOR TRADES FOR FOR FOR PROPER SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SAFETY AND STRUCTURAL INTEGRITY OF THE SAFETY AND STRUCTURAL INTEGRITY OF THE AND STRUCTURAL INTEGRITY OF THE AND STRUCTURAL INTEGRITY OF THE STRUCTURAL INTEGRITY OF THE STRUCTURAL INTEGRITY OF THE INTEGRITY OF THE INTEGRITY OF THE OF THE OF THE THE THE BUILDING AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE COLUMNS, JACKS, BEAMS, ETC., WHERE COLUMNS, JACKS, BEAMS, ETC., WHERE JACKS, BEAMS, ETC., WHERE JACKS, BEAMS, ETC., WHERE BEAMS, ETC., WHERE BEAMS, ETC., WHERE ETC., WHERE ETC., WHERE WHERE WHERE REQUIRED FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, TO REMAIN IN SAFE, COMPETENT MANNER, TO REMAIN IN SAFE, COMPETENT MANNER, REMAIN IN SAFE, COMPETENT MANNER, REMAIN IN SAFE, COMPETENT MANNER, IN SAFE, COMPETENT MANNER, IN SAFE, COMPETENT MANNER, SAFE, COMPETENT MANNER, SAFE, COMPETENT MANNER, COMPETENT MANNER, COMPETENT MANNER, MANNER, MANNER, IN CONFORMANCE WITH ALL LAWS, CODES ORDINANCES, RULES AND REGULATIONS BEARING ON THE WORK. 9. DEMOLITION OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING DEMOLITION OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING REMOVED SHALL BE DONE WITH UTMOST CARE, USING REMOVED SHALL BE DONE WITH UTMOST CARE, USING SHALL BE DONE WITH UTMOST CARE, USING SHALL BE DONE WITH UTMOST CARE, USING BE DONE WITH UTMOST CARE, USING BE DONE WITH UTMOST CARE, USING DONE WITH UTMOST CARE, USING DONE WITH UTMOST CARE, USING WITH UTMOST CARE, USING WITH UTMOST CARE, USING UTMOST CARE, USING UTMOST CARE, USING CARE, USING CARE, USING USING USING TOOLS AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID POSSIBLE CARE SHALL BE TAKEN TO AVOID POSSIBLE CARE SHALL BE TAKEN TO AVOID CARE SHALL BE TAKEN TO AVOID CARE SHALL BE TAKEN TO AVOID SHALL BE TAKEN TO AVOID SHALL BE TAKEN TO AVOID BE TAKEN TO AVOID BE TAKEN TO AVOID TAKEN TO AVOID TAKEN TO AVOID TO AVOID TO AVOID AVOID AVOID DAMAGING, SHOCK OR VIBRATION TO PORTIONS OF EXISTING STRUCTURE TO REMAIN. 10. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. ELEVATION OF EXISTING SEWERS, DRAINS, ETC. ELEVATION OF EXISTING SEWERS, DRAINS, ETC. OF EXISTING SEWERS, DRAINS, ETC. OF EXISTING SEWERS, DRAINS, ETC. EXISTING SEWERS, DRAINS, ETC. EXISTING SEWERS, DRAINS, ETC. SEWERS, DRAINS, ETC. SEWERS, DRAINS, ETC. DRAINS, ETC. DRAINS, ETC. ETC. ETC. IN DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND DISCREPANCIES SHALL BE DOCUMENTED AND DISCREPANCIES SHALL BE DOCUMENTED AND SHALL BE DOCUMENTED AND SHALL BE DOCUMENTED AND BE DOCUMENTED AND BE DOCUMENTED AND DOCUMENTED AND DOCUMENTED AND AND AND REPORTED TO THE ARCHITECT. 11. SAW CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SAW CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY OF NEW INSTALLATIONS OF PLUMBING, NECESSARY OF NEW INSTALLATIONS OF PLUMBING, NECESSARY NEW INSTALLATIONS OF PLUMBING, NECESSARY NEW INSTALLATIONS OF PLUMBING, NECESSARY INSTALLATIONS OF PLUMBING, NECESSARY INSTALLATIONS OF PLUMBING, NECESSARY OF PLUMBING, NECESSARY OF PLUMBING, NECESSARY PLUMBING, NECESSARY PLUMBING, NECESSARY NECESSARY NECESSARY CAPPING OF EXISTING, AND FOUNDATION WORK. 12. PREPARE ALL DEMOLITION AREAS FOR NEW FINISHES. PREPARE ALL DEMOLITION AREAS FOR NEW FINISHES. 13. REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, INCLUDING PIPING, FIXTURES, EQUIPMENT, INCLUDING PIPING, FIXTURES, EQUIPMENT, PIPING, FIXTURES, EQUIPMENT, PIPING, FIXTURES, EQUIPMENT, FIXTURES, EQUIPMENT, FIXTURES, EQUIPMENT, EQUIPMENT, EQUIPMENT, DUCTWORK, WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REFER TO MECHANICAL AND ELECTRICAL REFER TO MECHANICAL AND ELECTRICAL TO MECHANICAL AND ELECTRICAL TO MECHANICAL AND ELECTRICAL MECHANICAL AND ELECTRICAL MECHANICAL AND ELECTRICAL AND ELECTRICAL AND ELECTRICAL ELECTRICAL ELECTRICAL DRAWINGS FOR MECHANICAL AND ELECTRICAL DEMOLITION. 14. REFER TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START REFER TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START FOR FURTHER INFORMATION PRIOR TO THE START FOR FURTHER INFORMATION PRIOR TO THE START FURTHER INFORMATION PRIOR TO THE START FURTHER INFORMATION PRIOR TO THE START INFORMATION PRIOR TO THE START INFORMATION PRIOR TO THE START PRIOR TO THE START PRIOR TO THE START TO THE START TO THE START THE START THE START START START OF DEMOLITION. 15. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL DEMOLITION INFORMATION. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL DEMOLITION INFORMATION. 16. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL DEMOLITION INFORMATION. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL DEMOLITION INFORMATION. 17. REMOVE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE REMOVE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE CEILING TREATMENTS, ETC., AS INDICATED ON THE CEILING TREATMENTS, ETC., AS INDICATED ON THE TREATMENTS, ETC., AS INDICATED ON THE TREATMENTS, ETC., AS INDICATED ON THE ETC., AS INDICATED ON THE ETC., AS INDICATED ON THE AS INDICATED ON THE AS INDICATED ON THE INDICATED ON THE INDICATED ON THE ON THE ON THE THE THE DRAWINGS. 18. REMOVE EXISTING SUSPENDED CEILING (TILE AND GRID) AS INDICATED ON THE DRAWINGS. REMOVE EXISTING SUSPENDED CEILING (TILE AND GRID) AS INDICATED ON THE DRAWINGS. 19. REMOVE EXISTING CABINETS, CASEWORK AND BUILT-IN EQUIPMENT AS INDICATED ON THE DRAWINGS. REMOVE EXISTING CABINETS, CASEWORK AND BUILT-IN EQUIPMENT AS INDICATED ON THE DRAWINGS.

DEMOLITION PLAN NOTES:

H S

S H

S

H HS

H

S

H

SH

S

H

S

H

S

H

SHHSH

H

S

H

S S

HS

S

H

S

H

H S H

H

MD

S

MD

H

H

H

H

H

HVAC

H

H

H

CAMERA

H

S

H

H

S

H

H

H

S

S

H

H

H

H

H

H

S

H

S

H

S

H

H

S

H

H

S

H

S H

H

H

S H

H

H

H

S

H

H

S

H

S

S

S

H

S

H

S

H H

H

H

H

H

S

H

H

S

H

S

H

H

S

H

S

MD

Sheet Number:

Project Number:

Sheet Title:

Drawn:

Checked:

Approved:

Seal:

45650 Grand River Avenue

Novi, Michigan 48374

Ph: (248)349-4500 • Fax: (248)349-1429

Issued For Date

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND

CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE

PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018

Project:

Client:

Corporate Headquarters

Lansing • Gaylord • Sault Ste. Marie

Key Plan:

Novi • Wyandotte • Muskegon www.sidockgroup.com

Sidock Group www.sidockarchitects.com

No Scale

ARCHITECTSENGINEERS CONSULTANTS

147 W. Main Street, Suite 303

Gaylord, Michigan 44735

Ph: (989)705-8400 • Fax: (989)705-8403

Gaylord Office

BATTLE CREEK

ANG

ALTER BUILDING

PROJECT: MBMV 162092

516595

REFLECTED CEILING PLAN -

DEMOLITION

SCALE:

" = 1'-0"

REMOVE EXISTING

CEILING TILE AND

GRID

REMOVE EXISTING

CEILING TILE AND

GRID

EXISTING CEILING

TILE AND GRID TO

REMAIN

EXISTING CEILING

TILE AND GRID TO

REMAIN

EXISTING LIGHTS

TO REMAIN

REMOVE EXISTING

CEILING TILE AND

GRID

REMOVE EXISTING

LIGHT FIXTURES

REMOVE AND REUSE

EXISTING

COMPONENTS

(TYPICAL)

REMOVE EXISTING

CEILING TILE AND

GRID

REMOVE EXISTING

LIGHT FIXTURES

CONFIRMATION REQUIRED FOR

RECENTLY CONSTRUCTED OFFICE

FAMILY SERVICES

OFFICE

101A

STORAGE

STOR.

VEST.

STORAGE

105A

AUDITORIUM

MEN'S LOCKER

STOR.

BREAK ROOM

ROM

HRO REMOTE

MECHANIC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.