Drawings_-_MBMV162092_Alter_Building_6913.pdf
PDF 8 MB Posted
- Attached to
- Alter Bldg. 6913 Federal contract opportunity
- Solicitation number
- W912JB-18-B-8002
About this file
Drawing File Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Sign_In_Sheet.pdf | ||
| Bid_Opening_Abstract_Alter_Bldg_6913.pdf | ||
| RFI'S_ALTER_BLDG_6913_2.pdf | ||
| W912JB18B8002_MBMV_162092_Amendment_03.pdf | ||
| W912JB18B8002_MBMV_162092_Amendment_02.pdf | ||
| RFI'S_ALTER_BLDG_6913.pdf | ||
| 093000.pdf | ||
| 102113.pdf | ||
| Site_Visit_Minutes_18B8002.pdf | ||
| Sign_In_Sheet.pdf | ||
| Drawings_-_MBMV162092_Alter_Building_6913.pdf | ||
| W912JB18B8002_MBMV_162092_Amendment_01.pdf | ||
| W912JB-18-B-8002_SOLICITATION.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| SOW_-_MBMV162092_Alter_Building_6913_AT_Opsec.pdf | ||
| W912JB18B8002_MBMV_162092_Amendment_01.pdf | ||
| SOW_-_MBMV162092_Alter_Building_6913_AT_Opsec.pdf | ||
| Vetting_Access_Request_List_Blank.pdf | ||
| Bid_Schedule_-_162092_Alter_6913.pdf | ||
| W912JB-18-B-8002_SOLICITATION.pdf | ||
| Synopsis_BC_Alter_Bldg_6913.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Know what's below.
before you dig.Call
R
CS-001 COVER SHEET
SHEET INDEX
ARCHITECTURAL
A-100 FLOOR PLAN - DEMOLITION
GENERAL
NO.
06-01-2018
DATE
LAKE
MICHIGAN
LAKE
SUPERIOR
LAKE
ERIE
LAKE
HURON
A-210
PROJECT LOCATION
FLOOR PLAN
A-101 REFLECTED CEILING PLAN - DEMOLITION
A-610 REFLECTED CEILING PLAN
Sheet Number:
Project Number:
Sheet Title:
Drawn:
Checked:
Approved:
Seal:
45650 Grand River Avenue
Novi, Michigan 48374
Ph: (248)349-4500 • Fax: (248)349-1429
Issued For Date
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND
CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE
PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018
Project:
Client:
Corporate Headquarters
Lansing • Gaylord • Sault Ste. Marie
Key Plan:
Novi • Wyandotte • Muskegon www.sidockgroup.com
Sidock Group www.sidockarchitects.com
No Scale
ARCHITECTSENGINEERS CONSULTANTS
147 W. Main Street, Suite 303
Gaylord, Michigan 44735
Ph: (989)705-8400 • Fax: (989)705-8403
Gaylord Office
BATTLE CREEK
ANG
ALTER BUILDING
PROJECT: MBMV 162092
516595
06-01-18 B3 SUBMITTAL
A-901 ROOM, DOOR, WINDOW SCHED. - WINDOW, DOOR, FRAME ELEV'S
PLUMBING
M-110 HVAC DEMOLITION PLAN
MECHANICAL
E-101 ELECTRICAL DEMOLITION PLAN
ELECTRICAL
E-201 ELECTRICAL POWER PLAN
E-202 ELECTRICAL LIGHTING PLAN
M-210 HVAC FLOOR PLAN
M-211 SCHEDULES AND DETAILS
P-201 SANITARY / PIPING ISOMETRIC
A-910 FLOOR FINISH PLAN
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
06-01-2018
A-801 DETAILS / WALL SECTION 06-01-2018
P-210 PIPING PLAN 06-01-2018
CS-001
HL
BB
BB
COVER SHEET
A-211 ENLARGED FLOOR PLAN 06-01-2018
A-501 INTERIOR ELEVATIONS 06-01-2018
BATTLE CREEK, MI. AREA MAP
NOT TO SCALE
CS-002 GENERAL NOTES - ABBREVIATION LEGEND 06-01-2018
AutoCAD SHX Text
B-3 SUBMITTAL
AutoCAD SHX Text
BATTLE CREEK AIR NATIONAL GUARD
AutoCAD SHX Text
BATTLE CREEK, MICHIGAN
AutoCAD SHX Text O
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text
IAE
AutoCAD SHX Text
SCI
AutoCAD SHX Text
PHI
AutoCAD SHX Text
AE
AutoCAD SHX Text
ENT
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text
GEO
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text
GRA
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text
US
AutoCAD SHX Text
PE
AutoCAD SHX Text
NF
AutoCAD SHX Text
IN
AutoCAD SHX Text
IA
AutoCAD SHX Text
NE
AutoCAD SHX Text
TR
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
QUE
AutoCAD SHX Text I
AutoCAD SHX Text
CO
AutoCAD SHX Text
AM
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text
ALTER BUILDING 6913
AutoCAD SHX Text
PROJECT NO. MBMV 162092
AutoCAD SHX Text
SCHOOLCRAFT
AutoCAD SHX Text
MANISTEE
AutoCAD SHX Text
OCEANA
AutoCAD SHX Text
MUSKEGON
AutoCAD SHX Text
MASON
AutoCAD SHX Text
BERRIEN
AutoCAD SHX Text
GOGEBIC
AutoCAD SHX Text
DICKINSON
AutoCAD SHX Text
MENOMINEE
AutoCAD SHX Text
DELTA
AutoCAD SHX Text
ONTONAGON
AutoCAD SHX Text
IRON
AutoCAD SHX Text
BARAGA
AutoCAD SHX Text
HOUGHTON
AutoCAD SHX Text
KEWEENAW
AutoCAD SHX Text
MARQUETTE
AutoCAD SHX Text
ALGER
AutoCAD SHX Text
ST. CLAIR
AutoCAD SHX Text
HILLSDALE
AutoCAD SHX Text
CASS
AutoCAD SHX Text
ST. JOSEPH
AutoCAD SHX Text
BRANCH
AutoCAD SHX Text
LENAWEE
AutoCAD SHX Text
MONROE
AutoCAD SHX Text
GLADWIN
AutoCAD SHX Text
MIDLAND
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
BARRY
AutoCAD SHX Text
VAN BUREN
AutoCAD SHX Text
ALLEGAN
AutoCAD SHX Text
KALAMAZOO
AutoCAD SHX Text
OTTAWA
AutoCAD SHX Text
KENT
AutoCAD SHX Text
EATON
AutoCAD SHX Text
CALHOUN
AutoCAD SHX Text
IONIA
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
MECOSTA
AutoCAD SHX Text
OSCEOLA
AutoCAD SHX Text
NEWAYGO
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
ISABELLA
AutoCAD SHX Text
MONTCALM
AutoCAD SHX Text
GRATIOT
AutoCAD SHX Text
CLARE
AutoCAD SHX Text
INGHAM
AutoCAD SHX Text
WASHTENAW
AutoCAD SHX Text
LIVINGSTON
AutoCAD SHX Text
SHIAWASSEE
AutoCAD SHX Text
GENESEE
AutoCAD SHX Text
OAKLAND
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
LAPEER
AutoCAD SHX Text
MACOMB
AutoCAD SHX Text
TUSCOLA
AutoCAD SHX Text
SAGINAW
AutoCAD SHX Text
ARENAC
AutoCAD SHX Text
BAY
AutoCAD SHX Text
SANILAC
AutoCAD SHX Text
HURON
AutoCAD SHX Text
ANTRIM
AutoCAD SHX Text
GRAND TRAVERSE
AutoCAD SHX Text
WEXFORD
AutoCAD SHX Text
LELANAU
AutoCAD SHX Text
BENZIE
AutoCAD SHX Text
MISSAUKEE
AutoCAD SHX Text
ROSCOMMON
AutoCAD SHX Text
KALKASKA
AutoCAD SHX Text
CRAWFORD
AutoCAD SHX Text
OTSEGO
AutoCAD SHX Text
CHALEVOIX
AutoCAD SHX Text
EMMET
AutoCAD SHX Text
CHEBOYGAN
AutoCAD SHX Text
MACKINAC
AutoCAD SHX Text
OGEMAW
AutoCAD SHX Text
IOSCO
AutoCAD SHX Text
OSCODA
AutoCAD SHX Text
MONTMORENCY
AutoCAD SHX Text
ALCONA
AutoCAD SHX Text
ALPENA
AutoCAD SHX Text
PRESQUE ISLE
AutoCAD SHX Text
LUCE
AutoCAD SHX Text
CHIPPEWA
AutoCAD SHX Text C
AutoCAD SHX Text
NORTH
DETAIL REFERENCE SECTION REFERENCE
NORTH ARROW
BUILDING SECTION REFERENCEINTERIOR ELEVATION
ROOM NUMBER DOOR NUMBER PARTITION TYPE
SYMBOL LEGEND
A
ABBREVIATION DEFINITION
F
DEFINITION
ABBREVIATION LEGEND
M
DEFINITION
@ AT FD FLOOR DRAIN MAX MAXIMUM
ACC ACOUSTIC CEILING TILE FIN FINISH / FINISHED
MTL METALALUM ALUMINUM FL FLUSH
MEZZ MEZZANINEANOD ANODIZED FLR FLOOR
MIN MINIMUMFOUND FOUNDATION
MO MASONRY OPENING
FT FOOT / FEET
FTG FOOTING
N
B
NO NUMBER
BF BARRIER FREE
G
BOD BOTTOM OF DECK
GALV GALVANIZE(D)BOT BOTTOM
O
BRG BEARING
OC ON CENTER
H
OD OUTSIDE DIAMETERH HIGH
OHD OVERHEAD DOORHC HOLLOW CORE
HM HOLLOW METAL
C
HORIZ HORIZONTAL
P
COMP COMPACTED
HT HEIGHT
PEMB PRE-ENGINEERED METAL BUILDING
CONC CONCRETE
PERIM PERIMETER
CONT CONTINUOUS
PL PLATE
CPT CARPET
I
PLAM PLASTIC LAMINATE
CT CERAMIC TILE
ID INSIDE DIAMETER
PSF POUNDS PER SQUARE FOOTIN INCH / INCHES
PSI POUNDS PER SQUARE INCHINSUL INSULATED
PT PAINT
D
DIA DIAMETER
J
Q
DF DRINKING FOUNTAIN
DL DEAD LOAD
DN DOWN
DO DOOR OPENING
K
R
R RADIUS
E
RD ROOF DRAIN / ROLLING DOOR
ELEV ELEVATION
REINF REINFORCING
EQ EQUAL
RO ROUGH OPENING
EWC ELECTRIC WATER COOLER
L
EXP EXPANSION
LAV LAVATORY
LL LIVE LOAD
S
LLH LONG LEG HORIZONTAL SC SOLID CORE
LLV LONG LEG VERTICAL SCHED SCHEDULE
CMU CONCRETE MASONRY UNIT
CLR CLEAR
CLG CEILING
CL CENTER LINE
COL COLUMN
EC EXPOSED CONCRETE
SHT
DEFINITION
SHEET
SQ FT SQUARE FEET / FOOT
ST STAIN
STL STEEL
T
TEMP TEMPORARY
THRESH THRESHOLD
U
UNO
UNLESS NOTED OTHERWISE
V
VCT VINYL COMPOSITION TILE
VERT VERTICAL
W
W/ WITH
WB WALL BASE
WD WOOD
WWF WELDED WIRE FABRIC
X
Y
Z
ABBREVIATION ABBREVIATION ABBREVIATION
BK BLOCK
FRP FIBERGLAS REINFORCED PANEL(S)
GYP BD GYPSUM BOARD
HDW HARDWARE
IOHD INSULATED OVERHEAD DOOR
IRD INSULATED ROLLING DOOR
MT MARBLE THRESHOLD
PRE-FIN PRE-FINISHED
WG WIRED GLASS
TOS TOP OF STEEL
TYP TYPICAL
SC SOLID CORE
DOOR
XX
XX
SHEET#
ROOM NAME
DET.
SHEET
TITLE
SCALE: X/X" = 1'-0"
A
A-210
A
A-210
CEILING
HT
DEMO
DEMO
FIXTURE
NO.
A101
SIM
EXIST.
COLUMN
NEW
COLUMN
NO.
SHEET
SIM
PLAN DETAILDRAWING REFERENCE
TITLE
SCALE: X/X" = 1'-0"
WIN
CENTER LINE MATCHLINE WINDOW ELEVATION
SEE SHEET: A - 101
TRUE
NORTH
SHEET
NORTH
CO CLEAN OUT
MCS METAL CARPET STRIP
NTS NOT TO SCALE
WH WATER HEATER
Know what's below.
before you dig.Call
R
Sheet Number:
Project Number:
Sheet Title:
Drawn:
Checked:
Approved:
Seal:
45650 Grand River Avenue
Novi, Michigan 48374
Ph: (248)349-4500 • Fax: (248)349-1429
Issued For Date
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND
CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE
PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018
Project:
Client:
Corporate Headquarters
Lansing • Gaylord • Sault Ste. Marie
Key Plan:
Novi • Wyandotte • Muskegon www.sidockgroup.com
Sidock Group www.sidockarchitects.com
No Scale
ARCHITECTSENGINEERS CONSULTANTS
147 W. Main Street, Suite 303
Gaylord, Michigan 44735
Ph: (989)705-8400 • Fax: (989)705-8403
Gaylord Office
BATTLE CREEK
ANG
ALTER BUILDING
PROJECT: MBMV 162092
516595
06-01-18 B3 SUBMITTAL
CS-002
HL
BB
BB
GENERAL NOTES -
ABBRIVEIATION
LEGEND
AutoCAD SHX Text Insulation Provide sound attenuation batt insulation in wall surrounding toilet rooms, copy, machines, printers, mechanical, etc. All concealed batt insulation shall have kraft paper backing. Insulation shall be installed in such a manner as to allow free air flow from the soffit to the roof space. Ventilation of concealed roof space shall be maintained.
AutoCAD SHX Text Gypsum Board All gypsum board edges to be on solid blocking.
AutoCAD SHX Text Doors All interior doors shall be 1-3/4" thick, commercial grade, solid core, wood construction, stained and varnished. Face veneer shall be of standard commercial thickness not less than 1/28" before sanding. All exterior doors, except main entrance, shall be hollow metal construction provided with heavy duty commercial grade hardware. All hinges shall be provided with stainless steel pins, oil impregnated bronze bushings, or concealed ball bearing units. Swing out doors shall have non-removable pins. Interior doors shall receive a 12" high kickplate which protects within 1" of both sides and the bottom of the door. All exterior doors shall be equipped with closers. Exterior doors, except main entrance and employee entrance and receiving doors, shall be equipped with audible alarm devices. Provide closers on all toilet room doors. All doors shall be 6'-8" high unless otherwise noted.
AutoCAD SHX Text Before beginning any work at the site, inspect the existing building and determine the extent of existing finishes, specialties, casework, equipment, and other items that must be removed and reinstalled to perform the work defined in this contract. The architectural drawings show principal areas where work must be accomplished under the contract. Incidental work may also be necessary in areas not shown on the architectural plans due to changes affecting existing mechanical, electrical, plumbing, or other systems. Such incidental work is also part of the contract. Inspect those areas and ascertain work needed, and perform that work according with the contract requirements, at no additional cost. Dimensions to existing surfaces are to the finished face. Dimensions to new masonry are to rough face of the units. Masonry dimensions are nominal. Dimensions to new stud partitions are to the face of studs. Existing masonry block coursing is based on one course equals 8". New block coursing shall match existing. Existing brick coursing is based on three course equals 8". New brick coursing shall match existing. Do not drill or cut existing floor joist, beams, columns, or other structural elements, unless specifically indicated. Drill slabs where approved. Core drill circular openings through slabs. Line drill for rectangular openings through slabs. Make openings of proper size for conduits, ducts, pipes, and other items passing through openings. Protect existing work to remain from damage. Repair, patch, and finish, as applicable, to match adjacent existing finishes those existing surfaces damaged or newly exposed during the performance of the work under this contract. Where permanent removal of existing millwork, casework, cabinetwork, accessories, equipment, or furnishings are required, previously concealed surfaces are to match adjacent exposed surfaces. Where such surfaces are to remain exposed, patch previously concealed surfaces to match adjacent exposed surfaces. Where such surfaces are scheduled to receive the new finishes, prepare the surfaces to receive the new finishes. Where cutting of existing surfaces or removal of existing finishes is required to perform the work under this contract, and a new finish is not indicated, fill resulting openings and patch the surface after performing the work, and finish to match adjacent existing surfaces. Provide new lintels or headers over every new opening in both new and existing walls and partitions. Where match existing is indicated, new construction or finishes, as appropriate to the note, shall match the existing in every aspect. Junctures between existing masonry and patches or extensions shall be made to clean cut lines or neatly toothed in. Work shown is new unless specifically noted or otherwise indicated as existing.
AutoCAD SHX Text General Notes Before beginning work at the site, and throughout the source of the work, inspect and verify the location and condition of every item affected by the work under the contract. Report any discrepancies to the Architect before performing any work related to the inspection. Trade, product, or manufacturer's names, or catalog numbers shown on the plans for new products are to establish quality required. In each case add, by inference, after trade, product, or manufacturer's name, the phrase, "or approved equal". Determine location of partitions not dimensioned, by their relation to column face center, window jamb, or other similar fixed item. Do not scale drawings (USE DIMENSIONS). All building plans shall be submitted to the Building Official for plan review. Notify Architect of any plan review comments prior to construction. All trades shall conform with all applicable Federal, State, Local, and OSHA codes, rules and regulations. In case of conflict, the most stringent requirement shall apply.
C
Sheet Number:
Project Number:
Sheet Title:
Drawn:
Checked:
Approved:
Seal:
45650 Grand River Avenue
Novi, Michigan 48374
Ph: (248)349-4500 • Fax: (248)349-1429
Issued For Date
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND
CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE
PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018
Project:
Client:
Corporate Headquarters
Lansing • Gaylord • Sault Ste. Marie
Key Plan:
Novi • Wyandotte • Muskegon www.sidockgroup.com
Sidock Group www.sidockarchitects.com
No Scale
ARCHITECTSENGINEERS CONSULTANTS
147 W. Main Street, Suite 303
Gaylord, Michigan 44735
Ph: (989)705-8400 • Fax: (989)705-8403
Gaylord Office
BATTLE CREEK
ANG
ALTER BUILDING
PROJECT: MBMV 162092
516595
FLOOR PLAN - DEMOLITION
SCALE:
" = 1'-0"
REMOVE EXISTING WALL
CONSTRUCTION, DOORS,
AND DOOR FRAMES
REMOVE EXISTING WALL
CONSTRUCTION, DOORS,
AND DOOR FRAMES
REMOVE EXISTING
MILLWORK AND WALL
CONSTRUCTION
REMOVE EXISTING
DOORS AND FRAMES
REMOVE EXISTING
MILLWORK AND WALL
CONSTRUCTION
REMOVE EXISTING DOORS
AND FRAMES
REMOVE EXISTING WALL
CONSTRUCTION, DOORS,
AND DOOR FRAMES
REMOVE EXISTING DOOR,
SIDELITE, AND DOOR
FRAME
REMOVE EXISTING WALL
CONSTRUCTION AS
REQUIRED FOR NEW
OPENING
REMOVE EXISTING WALL
CONSTRUCTION AS
REQUIRED FOR NEW
OPENING
REMOVE EXISTING
WALL CONSTRUCTION
AS REQUIRED FOR
NEW OPENING
REMOVE EXISTING
WALL CONSTRUCTION,
DOORS, AND DOOR
FRAMES
REMOVE EXISTING WALL
CONSTRUCTION AS
REQUIRED FOR NEW
OPENING
REMOVE EXISTING DOOR
AND DOOR FRAME
REMOVE EXISTING
DOORS AND FRAMES
INCLUDING JAM FRAMING
REMOVE EXISTING
MIRROR WALL FINISH
REMOVE EXISTING
CONCRETE SIDEWALK
AND CURB AS REQUIRED
FOR NEW RAMP
REMOVE EXISTING
LOCKERS AND
BENCH
REMOVE EXISTING
SHOWER & CAP
EXIST. WATER LINES
V
I
F
14'-1
10'-3"+/-
EXISTING
CARPETING
TO REMAIN
(TYP. U.N.O.)
EXISTING
FLOORING
TO REMAIN
REMOVE EXISTING DOOR
AND DOOR FRAME AND
HARDWARE (TYP.)
REMOVE EXISTING
WINDOW
CONSTRUCTION
EXISTING FLOORING
TO BE REMOVED IN
ALL HATCHED AREAS
CONFIRMATION REQUIRED FOR
RECENTLY CONSTRUCTED OFFICE
REAR PROJECTION ROOM
STORAGE
MOBILITY
STOR.
VEST.
PILOTS BREIFING ROOM
MALE PILOTS LOCKER ROOM
STOR.
BREAK ROOM
MECHANICAL
RAFT REPAIR
POST FLIGHT AREA
PERSONAL EQUIP. OFFICE
CONF. ROOM
AIR COMMANDER
SECRETARY
AIR FORCE ADVISOR
VEST.
DCO OFFICE
FLIGHT PLANNING
AIR OPER> OFFICER
VEST.
INTEL OFFICE
VAULT
WORKROOM
STORAGE
TELE.
STOR.
VEST.
TESTING
MEDICAL
VEST.
CL.
VEST.
SOF COUNTER
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
OPS ADMINISTRATION
CORRIDOR
SCEDULING
COMAND POST
ADMIN.
TRAINING
STORAGE
OPERATIONS
STAFF
WOMEN'S
TOILET
BREIFING
ROOM
A-100
HL
BB
BB
FLOOR PLAN -
DEMOLITION
06-01-18 B3 SUBMITTAL
REMOVE EXIST.
WALL, DOORS, &
DOOR FRAMES
EXISTING SIDEWALK
TO REMAIN
V
I
F
REMOVE EXISTING
PAVING
REMOVE /
RESHAPE EXIST.
GRADE FOR
NEW PAVING
AREA OF SLAB
DEMOLITION
REMOVE WALL
CONSTRUCTION
REMOVE DOOR
& FRAME
ASSEMBLY
PILOT EQUIP STORAGE
LAUNDRY
BREIFING
ROOM
BREIFING
ROOM
INTELLIGENCE
PLANS
OPERATIONS/
MAP MAKING
BREIFING
ROOM
SKYLIGHT
AREA
COCKPIT
TRAINING
EJECTION
TRAINING
NON-PILOT
LOCKER RM.
SHOWER/
DRYING
MEN'S
TOILET
VEST.
WEAPONS
& TACTICS
COMMAND
POST
CONT. SUPPORT
STAFF
SQUADRON
COMMANDER
FIRST
SARGENT
ORDERLY
ROOM
FLIGHT
COMMANDER
STAND.
EVALUATION
INSPECTION
OFFICE
REMOVE EXISTING
WINDOW AND FRAME
4'-2
" 5'-10
20'-4
WORK ZONE KEY PLAN
NO SCALE
BASE BID
ABI 1
ABI 2
AutoCAD SHX Text C
AutoCAD SHX Text
1. REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEMOLITION AND/OR CONSTRUCTION PROCESS AND DEMOLITION AND/OR CONSTRUCTION PROCESS AND AND/OR CONSTRUCTION PROCESS AND AND/OR CONSTRUCTION PROCESS AND CONSTRUCTION PROCESS AND CONSTRUCTION PROCESS AND PROCESS AND PROCESS AND AND AND DISPOSE OFF SITE IN A SAFE AND LEGAL MANNER. 2. PROVIDE TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROVIDE TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. TEMPORARY PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. PROTECTION AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. AND WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. WEATHER SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. SEAL FOR INTERIOR DURING CONSTRUCTION PROCESS. FOR INTERIOR DURING CONSTRUCTION PROCESS. FOR INTERIOR DURING CONSTRUCTION PROCESS. INTERIOR DURING CONSTRUCTION PROCESS. INTERIOR DURING CONSTRUCTION PROCESS. DURING CONSTRUCTION PROCESS. DURING CONSTRUCTION PROCESS. CONSTRUCTION PROCESS. CONSTRUCTION PROCESS. PROCESS. PROCESS. TEMPORARY CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING CONSTRUCTION MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING MUST BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING BE WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING WATER TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TIGHT TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING TO PREVENT ANY DAMAGE OR VANDALISM TO EXISTING PREVENT ANY DAMAGE OR VANDALISM TO EXISTING PREVENT ANY DAMAGE OR VANDALISM TO EXISTING ANY DAMAGE OR VANDALISM TO EXISTING ANY DAMAGE OR VANDALISM TO EXISTING DAMAGE OR VANDALISM TO EXISTING DAMAGE OR VANDALISM TO EXISTING OR VANDALISM TO EXISTING OR VANDALISM TO EXISTING VANDALISM TO EXISTING VANDALISM TO EXISTING TO EXISTING TO EXISTING EXISTING EXISTING INTERIOR SPACE. 3. PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO AT LOCATIONS INDICATED AND/OR AS REQUIRED TO AT LOCATIONS INDICATED AND/OR AS REQUIRED TO LOCATIONS INDICATED AND/OR AS REQUIRED TO LOCATIONS INDICATED AND/OR AS REQUIRED TO INDICATED AND/OR AS REQUIRED TO INDICATED AND/OR AS REQUIRED TO AND/OR AS REQUIRED TO AND/OR AS REQUIRED TO AS REQUIRED TO AS REQUIRED TO REQUIRED TO REQUIRED TO TO TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL AREAS FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL FROM CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL CONSTRUCTION HAZARDS, NOISE AND DUST. COORDINATE ALL HAZARDS, NOISE AND DUST. COORDINATE ALL HAZARDS, NOISE AND DUST. COORDINATE ALL NOISE AND DUST. COORDINATE ALL NOISE AND DUST. COORDINATE ALL AND DUST. COORDINATE ALL AND DUST. COORDINATE ALL DUST. COORDINATE ALL DUST. COORDINATE ALL COORDINATE ALL COORDINATE ALL ALL ALL LOCATIONS WITH ARCHITECT. 4. PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL DUST MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL MATS AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AT ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL CONSTRUCTION AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AREA ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL ENTRANCE AND EXIT LOCATIONS. COORDINATE ALL AND EXIT LOCATIONS. COORDINATE ALL AND EXIT LOCATIONS. COORDINATE ALL EXIT LOCATIONS. COORDINATE ALL EXIT LOCATIONS. COORDINATE ALL LOCATIONS. COORDINATE ALL LOCATIONS. COORDINATE ALL COORDINATE ALL COORDINATE ALL COORDINATE ALL ALL ALL LOCATION WITH ARCHITECT. 5. CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS MEANS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS OF EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS EGRESS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS AND ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS ALL FIRE PROTECTION COMPONENTS FOR ALL PORTIONS FIRE PROTECTION COMPONENTS FOR ALL PORTIONS FIRE PROTECTION COMPONENTS FOR ALL PORTIONS PROTECTION COMPONENTS FOR ALL PORTIONS PROTECTION COMPONENTS FOR ALL PORTIONS COMPONENTS FOR ALL PORTIONS COMPONENTS FOR ALL PORTIONS FOR ALL PORTIONS FOR ALL PORTIONS ALL PORTIONS ALL PORTIONS PORTIONS PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION. 6. ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS AS CALLED FOR ON THE DRAWINGS AND/OR AS AS CALLED FOR ON THE DRAWINGS AND/OR AS CALLED FOR ON THE DRAWINGS AND/OR AS CALLED FOR ON THE DRAWINGS AND/OR AS FOR ON THE DRAWINGS AND/OR AS FOR ON THE DRAWINGS AND/OR AS ON THE DRAWINGS AND/OR AS ON THE DRAWINGS AND/OR AS THE DRAWINGS AND/OR AS THE DRAWINGS AND/OR AS DRAWINGS AND/OR AS DRAWINGS AND/OR AS AND/OR AS AND/OR AS AS AS REQUIRED TO ACCOMMODATE THE RENOVATION WORK. 7. CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, FLOORS AND CEILINGS WHERE ARCHITECTURAL, FLOORS AND CEILINGS WHERE ARCHITECTURAL, AND CEILINGS WHERE ARCHITECTURAL, AND CEILINGS WHERE ARCHITECTURAL, CEILINGS WHERE ARCHITECTURAL, CEILINGS WHERE ARCHITECTURAL, WHERE ARCHITECTURAL, WHERE ARCHITECTURAL, ARCHITECTURAL, ARCHITECTURAL, STRUCTURAL, MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION AND/OR ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ELECTRICAL ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ITEMS ARE REMOVED AS A RESULT OF THE DEMOLITION ARE REMOVED AS A RESULT OF THE DEMOLITION ARE REMOVED AS A RESULT OF THE DEMOLITION REMOVED AS A RESULT OF THE DEMOLITION REMOVED AS A RESULT OF THE DEMOLITION AS A RESULT OF THE DEMOLITION AS A RESULT OF THE DEMOLITION A RESULT OF THE DEMOLITION A RESULT OF THE DEMOLITION RESULT OF THE DEMOLITION RESULT OF THE DEMOLITION OF THE DEMOLITION OF THE DEMOLITION THE DEMOLITION THE DEMOLITION DEMOLITION DEMOLITION OPERATIONS. 8. CARRY OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CARRY OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR AND COOPERATION WITH STRUCTURAL TRADES FOR AND COOPERATION WITH STRUCTURAL TRADES FOR COOPERATION WITH STRUCTURAL TRADES FOR COOPERATION WITH STRUCTURAL TRADES FOR WITH STRUCTURAL TRADES FOR WITH STRUCTURAL TRADES FOR STRUCTURAL TRADES FOR STRUCTURAL TRADES FOR TRADES FOR TRADES FOR FOR FOR PROPER SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE SAFETY AND STRUCTURAL INTEGRITY OF THE SAFETY AND STRUCTURAL INTEGRITY OF THE AND STRUCTURAL INTEGRITY OF THE AND STRUCTURAL INTEGRITY OF THE STRUCTURAL INTEGRITY OF THE STRUCTURAL INTEGRITY OF THE INTEGRITY OF THE INTEGRITY OF THE OF THE OF THE THE THE BUILDING AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE COLUMNS, JACKS, BEAMS, ETC., WHERE COLUMNS, JACKS, BEAMS, ETC., WHERE JACKS, BEAMS, ETC., WHERE JACKS, BEAMS, ETC., WHERE BEAMS, ETC., WHERE BEAMS, ETC., WHERE ETC., WHERE ETC., WHERE WHERE WHERE REQUIRED FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, TO REMAIN IN SAFE, COMPETENT MANNER, TO REMAIN IN SAFE, COMPETENT MANNER, REMAIN IN SAFE, COMPETENT MANNER, REMAIN IN SAFE, COMPETENT MANNER, IN SAFE, COMPETENT MANNER, IN SAFE, COMPETENT MANNER, SAFE, COMPETENT MANNER, SAFE, COMPETENT MANNER, COMPETENT MANNER, COMPETENT MANNER, MANNER, MANNER, IN CONFORMANCE WITH ALL LAWS, CODES ORDINANCES, RULES AND REGULATIONS BEARING ON THE WORK. 9. DEMOLITION OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING DEMOLITION OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING REMOVED SHALL BE DONE WITH UTMOST CARE, USING REMOVED SHALL BE DONE WITH UTMOST CARE, USING SHALL BE DONE WITH UTMOST CARE, USING SHALL BE DONE WITH UTMOST CARE, USING BE DONE WITH UTMOST CARE, USING BE DONE WITH UTMOST CARE, USING DONE WITH UTMOST CARE, USING DONE WITH UTMOST CARE, USING WITH UTMOST CARE, USING WITH UTMOST CARE, USING UTMOST CARE, USING UTMOST CARE, USING CARE, USING CARE, USING USING USING TOOLS AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID POSSIBLE CARE SHALL BE TAKEN TO AVOID POSSIBLE CARE SHALL BE TAKEN TO AVOID CARE SHALL BE TAKEN TO AVOID CARE SHALL BE TAKEN TO AVOID SHALL BE TAKEN TO AVOID SHALL BE TAKEN TO AVOID BE TAKEN TO AVOID BE TAKEN TO AVOID TAKEN TO AVOID TAKEN TO AVOID TO AVOID TO AVOID AVOID AVOID DAMAGING, SHOCK OR VIBRATION TO PORTIONS OF EXISTING STRUCTURE TO REMAIN. 10. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. ELEVATION OF EXISTING SEWERS, DRAINS, ETC. ELEVATION OF EXISTING SEWERS, DRAINS, ETC. OF EXISTING SEWERS, DRAINS, ETC. OF EXISTING SEWERS, DRAINS, ETC. EXISTING SEWERS, DRAINS, ETC. EXISTING SEWERS, DRAINS, ETC. SEWERS, DRAINS, ETC. SEWERS, DRAINS, ETC. DRAINS, ETC. DRAINS, ETC. ETC. ETC. IN DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND AREAS BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND BEFORE PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND PROCEEDING WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WITH THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND THE WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND WORK, ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND ALL DISCREPANCIES SHALL BE DOCUMENTED AND DISCREPANCIES SHALL BE DOCUMENTED AND DISCREPANCIES SHALL BE DOCUMENTED AND SHALL BE DOCUMENTED AND SHALL BE DOCUMENTED AND BE DOCUMENTED AND BE DOCUMENTED AND DOCUMENTED AND DOCUMENTED AND AND AND REPORTED TO THE ARCHITECT. 11. SAW CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SAW CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CUT & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY & REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY REMOVE CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY CONCRETE SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY SLAB FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY FOR PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY PLACEMENT OF NEW INSTALLATIONS OF PLUMBING, NECESSARY OF NEW INSTALLATIONS OF PLUMBING, NECESSARY OF NEW INSTALLATIONS OF PLUMBING, NECESSARY NEW INSTALLATIONS OF PLUMBING, NECESSARY NEW INSTALLATIONS OF PLUMBING, NECESSARY INSTALLATIONS OF PLUMBING, NECESSARY INSTALLATIONS OF PLUMBING, NECESSARY OF PLUMBING, NECESSARY OF PLUMBING, NECESSARY PLUMBING, NECESSARY PLUMBING, NECESSARY NECESSARY NECESSARY CAPPING OF EXISTING, AND FOUNDATION WORK. 12. PREPARE ALL DEMOLITION AREAS FOR NEW FINISHES. PREPARE ALL DEMOLITION AREAS FOR NEW FINISHES. 13. REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, INCLUDING PIPING, FIXTURES, EQUIPMENT, INCLUDING PIPING, FIXTURES, EQUIPMENT, PIPING, FIXTURES, EQUIPMENT, PIPING, FIXTURES, EQUIPMENT, FIXTURES, EQUIPMENT, FIXTURES, EQUIPMENT, EQUIPMENT, EQUIPMENT, DUCTWORK, WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL PANELS AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AND ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL ACCESSORIES AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL AS REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REQUIRED. REFER TO MECHANICAL AND ELECTRICAL REFER TO MECHANICAL AND ELECTRICAL REFER TO MECHANICAL AND ELECTRICAL TO MECHANICAL AND ELECTRICAL TO MECHANICAL AND ELECTRICAL MECHANICAL AND ELECTRICAL MECHANICAL AND ELECTRICAL AND ELECTRICAL AND ELECTRICAL ELECTRICAL ELECTRICAL DRAWINGS FOR MECHANICAL AND ELECTRICAL DEMOLITION. 14. REFER TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START REFER TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START TO SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SECTION 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START 2A - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START - DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START DEMOLITION, IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START IN THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START THE SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START SPECIFICATION FOR FURTHER INFORMATION PRIOR TO THE START FOR FURTHER INFORMATION PRIOR TO THE START FOR FURTHER INFORMATION PRIOR TO THE START FURTHER INFORMATION PRIOR TO THE START FURTHER INFORMATION PRIOR TO THE START INFORMATION PRIOR TO THE START INFORMATION PRIOR TO THE START PRIOR TO THE START PRIOR TO THE START TO THE START TO THE START THE START THE START START START OF DEMOLITION. 15. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL DEMOLITION INFORMATION. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL DEMOLITION INFORMATION. 16. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL DEMOLITION INFORMATION. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL DEMOLITION INFORMATION. 17. REMOVE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE REMOVE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE ALL DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE DOORS, FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FRAMES, WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE WALLS, FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE FLOOR COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE COVERING, CEILING TREATMENTS, ETC., AS INDICATED ON THE CEILING TREATMENTS, ETC., AS INDICATED ON THE CEILING TREATMENTS, ETC., AS INDICATED ON THE TREATMENTS, ETC., AS INDICATED ON THE TREATMENTS, ETC., AS INDICATED ON THE ETC., AS INDICATED ON THE ETC., AS INDICATED ON THE AS INDICATED ON THE AS INDICATED ON THE INDICATED ON THE INDICATED ON THE ON THE ON THE THE THE DRAWINGS. 18. REMOVE EXISTING SUSPENDED CEILING (TILE AND GRID) AS INDICATED ON THE DRAWINGS. REMOVE EXISTING SUSPENDED CEILING (TILE AND GRID) AS INDICATED ON THE DRAWINGS. 19. REMOVE EXISTING CABINETS, CASEWORK AND BUILT-IN EQUIPMENT AS INDICATED ON THE DRAWINGS. REMOVE EXISTING CABINETS, CASEWORK AND BUILT-IN EQUIPMENT AS INDICATED ON THE DRAWINGS.
DEMOLITION PLAN NOTES:
H S
S H
S
H HS
H
S
H
SH
S
H
S
H
S
H
SHHSH
H
S
H
S S
HS
S
H
S
H
H S H
H
MD
S
MD
H
H
H
H
H
HVAC
H
H
H
CAMERA
H
S
H
H
S
H
H
H
S
S
H
H
H
H
H
H
S
H
S
H
S
H
H
S
H
H
S
H
S H
H
H
S H
H
H
H
S
H
H
S
H
S
S
S
H
S
H
S
H H
H
H
H
H
S
H
H
S
H
S
H
H
S
H
S
MD
Sheet Number:
Project Number:
Sheet Title:
Drawn:
Checked:
Approved:
Seal:
45650 Grand River Avenue
Novi, Michigan 48374
Ph: (248)349-4500 • Fax: (248)349-1429
Issued For Date
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SIDOCK GROUP, INC. AND
CANNOT BE REPRODUCED, COPIED, OR USED IN ANY MANNER WITHOUT THE
PRIOR WRITTEN CONSENT OF SIDOCK GROUP, INC. 2018
Project:
Client:
Corporate Headquarters
Lansing • Gaylord • Sault Ste. Marie
Key Plan:
Novi • Wyandotte • Muskegon www.sidockgroup.com
Sidock Group www.sidockarchitects.com
No Scale
ARCHITECTSENGINEERS CONSULTANTS
147 W. Main Street, Suite 303
Gaylord, Michigan 44735
Ph: (989)705-8400 • Fax: (989)705-8403
Gaylord Office
BATTLE CREEK
ANG
ALTER BUILDING
PROJECT: MBMV 162092
516595
REFLECTED CEILING PLAN -
DEMOLITION
SCALE:
" = 1'-0"
REMOVE EXISTING
CEILING TILE AND
GRID
REMOVE EXISTING
CEILING TILE AND
GRID
EXISTING CEILING
TILE AND GRID TO
REMAIN
EXISTING CEILING
TILE AND GRID TO
REMAIN
EXISTING LIGHTS
TO REMAIN
REMOVE EXISTING
CEILING TILE AND
GRID
REMOVE EXISTING
LIGHT FIXTURES
REMOVE AND REUSE
EXISTING
COMPONENTS
(TYPICAL)
REMOVE EXISTING
CEILING TILE AND
GRID
REMOVE EXISTING
LIGHT FIXTURES
CONFIRMATION REQUIRED FOR
RECENTLY CONSTRUCTED OFFICE
FAMILY SERVICES
OFFICE
101A
STORAGE
STOR.
VEST.
STORAGE
105A
AUDITORIUM
MEN'S LOCKER
STOR.
BREAK ROOM
ROM
HRO REMOTE
MECHANIC…