SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
06 July 2011
From the office of:
ZGA Architects and Planners, Chartered
565 West Myrtle Street - Suite 225
Boise, Idaho 83702
Re:
Operational Readiness Training Complex Phase 1
Orchard Training Area Boise, Idaho
Project No. PN 160093
Solicitation No. W912J7-11-B-0002
ZGA Project No. 0801.05
NOTICE OF CHANGES:
This Addendum No. Two is hereby made a part of the project requirements and contract documents for the referenced project. Be sure to acknowledge this addendum in your Bid/Proposal Form.
It is the obligation of the General Contractors receiving sub-bids to notify their subcontractors and suppliers of items relating to their bid prior to the bid opening.
GENERAL
1. Orchard Road and MATES Area Traffic Control
Utilities necessary for the ORTC project will primarily be extended from points of connection in or near the nearby MATES facility. Extensions of water and sanitary sewer lines will occur within existing drive or road areas in the MATES and Orchard Road.
Complete drive or road closures will not be allowed. Traffic restrictions will be allowed as long as at least one lane of traffic is kept open and traffic delays of at most five minutes occur for non-construction traffic occurring in the area. Depending upon traffic conditions, open trenches at any time in excess of 750 feet will not be allowed. Trenches must be backfilled and resurfaced to a condition to allow traffic use of the road surface while installation is advancing.
Adequate signage, appropriate for conditions, according to the latest edition of the Manual on Uniform Traffic Control Devices shall be provided and maintained by the Contractor.
Coordinate required pipeline testing events with the Contracting Officer for pipelines within existing traffic areas at least one week prior to beginning installation to be sure testing may be successfully performed for the pipelines. Coordinate work within MATES and Orchard Road with the Contracting Officer at least one week prior to beginning said work to allow proper notice of impending traffic disruption to users.
The Contractor shall conduct construction activities to assure safety in the area.
2. Bid Date Extension The bid date has been extended to 26 July at 2:00 PM/MST. The bid opening will occur at the date and time indicated at 3489 West Harvard Street, Building 564, Main Conference Room, Gowen Field, Boise Air Terminal - Boise, Idaho. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions in Solicitation W912J7-11-B-0002 for obtaining access to the base in the Site Visit instructions. Follow the same instructions for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
3. Guidance on Drawing Downloads
Attached to this Addendum No. 2 are graphic and written instructions on the means and methods to assist Bidders in downloading and printing full size 22’ x 34”, scalable drawings of this project from the Fed Biz Ops web site (www.fbo.gov). .
4. Availability of Civil AutoCAD Drawings
Civil AutoCAD drawings will be made available to the successful Bidder following the award of contract.
SPECIFICATIONS:
1. Section 00010 – Solicitation Contract Form and Specification Section 012300 – ABI’s
In Specification Section 012300 – ABI’s, Part 3 – Execution; Paragraphs 3.1.B and 3.1.C shall be revised to read as follows to be consistent with the pricing schedule in Section 00010 – Solicitation Contract Form:
ABI No.002:
Addition of Photovoltaic Panels to Barracks Roof.
Add eleven (11) groups of six (6) photovoltaic panels to the roof of the Barracks as indicated on sheet E-241-BE
ABI No. 003: Addition of Photovoltaic Panels to Dining Facility Roof.
Add twenty one (21) groups of six (6) photovoltaic panels to the roof of the Dining Facility as indicated on sheet E-122-DE
2. Section 012100 - Allowances
In Amendment No. 0001 issued on 13 June 2011, the $80,000 indicated for both bulk and trench rock excavation and disposal in Allowance No. 4 is intended to represent the Government’s estimated cost for the Quantity Allowance identified in Allowance No. 1 in Section 012100-Allowances. Allowance No. 1 is intended to identify the quantities of rock removal needed to develop the requested Unit Prices for both Trench Rock and Mass Rock removal as indicated in the pricing schedule in Section 00010-Solicitation Contract Form, Items No 0007 and 0008 respectively. No dollar amount is needed to be carried under the Base Bid for Allowance No. 1. The Government intends that Bidders only use Allowance No. 4 in the Pricing Schedule Base Bid. If the amount of trench rock or mass rock varies substantially from the quantities anticipated in Allowance No. 1, the fixed price contract amount will be increased or decreased by multiplying the actual verified measured quantities of cubic yards of rock removed by the respective unit price.
3. Section 012100 - Allowances
In Specification Section 012100-Allowances, Part 3- Execution, Paragraphs 3.2.B and 3.2.C, the Lump-Sum Allowances for the extension of electrical underground power and natural gas to the project site are to be included in the Bidder’s Base Bid Proposal, Item No. 0001 of the Pricing Schedule in Section 00010-Solicitation Contract Form.
4. Section 051200 – Structural Steel Framing
In Specification Section 051200 – Structural Steel Framing, Part 1 General, Paragraph 1.5.A – Fabricator Qualifications it states: A qualified fabricator that participates in the AISC Quality Certification Program and is designated an AISC-Certified Plant, Category STD or has a minimum 5 years experience.
5. Section 075323 – Ethylene-Propylene-Diene-Monomer (EPDM) Roofing
In Specification Section 075323 – Ethylene-Propylene-Diene-Monomer (EPDM) Roofing, Part 2 – Products, Paragraph 2.1.A.2, revise the Composite Thickness from 90 mils, nominal to 75 mils, nominal.
6. Section 263100 – Photovoltaic Collectors
In Specification Section 263100 – Photovoltaic Collectors, Part 2 Products, Paragraph 2.3.B – Photovoltaic Inverter Description: Photovoltaic inverters shall be enabled at the factory for web-based monitoring. All connection infrastructures for web monitoring shall be furnished and installed for a fully operational system as described in Detail 5/E5-01 on electrical drawings.
In Specification Section 263100 – Photovoltaic Collectors, Part 2 Products, Paragraph 2.4.B – Rack Assembly Description: Rack assembly shall be a standing seam metal roof racking system in lieu of the system indicated. Basis of design manufacturer shall be Unirac Solarmount System or equal suitable for mounting to pitched standing seam metal roofs. Refer to attached detail drawing SK-E-501-1for construction details.
7. Section 271100 – Communications Equipment Room Fittings
Replace existing specification Section 271100 in its entirety with attached new Section 271100 – Communications Equipment Room Fittings which includes network rack/cabinet specification and installation instructions.
8. Section 271500 – Communications Horizontal Cabling
In Specification Section 271500 – Communications Horizontal Cabling, Paragraph 2.5.B – Workstation Outlets: Use 6-port faceplates for telecommunications outlets as detailed on sheet E-502. Modify language in specification Section 271500 to require 6-port connector assemblies in lieu of the 4-port faceplate indicated.
9. Section 331613 – Aboveground Water Utility Storage Tanks
In Specification Section 331613 – Aboveground Water Utility Storage Tanks the specifications allow either an AWWA D100 (welded steel) or an AWWA D103 (bolted steel) tank for the project if they can meet the requirements of the specifications and drawings. Please note the minimum 50-year life expectancy identified in the specifications. Written documentation from the manufacturer stating their product has a minimum of a 50-year life is required prior to submittal approval of the tank. It is suggested that the Contractor confirm this documentation can be provided by their selected manufacturer prior to bid submittal. There are many examples of welded steel potable water tanks more than 50 years old but very few local examples of bolted steel potable water tanks that have been around that long.
10. Section 331800 – Calcium Hypochlorite Tablet Chlorination System
In Specification Section 331800 – Calcium Hypochlorite Tablet Chlorination System, the tablet chlorination system shall be provided with constant speed control. Contractor shall provide two (2) 55-lb pails of calcium hypochlorite tablets and a Hach chlorine test kit model Chlorimeter II number 5870000.
11. Section 331900 – Mechanical Tank Circulation
In Specification Section 331900 – Mechanical Tank Circulation, Part 2 – Products, Paragraph 2.3.G.1, Power Supply System: please note that the specification calls for Two (2) 80-watt rated photovoltaic solar modules.
12. Section 332113 – Public Water Supply Wells
In Specification Section 332113 – Public Water Supply Wells: The well specifications define the design of the new well and submersible pump. However, the final design of the well cannot be completed until the well is drilled and the pump selection cannot occur until the well is test pumped. The quantities of work or materials stated in the bid schedule are included to provide a general scope of work. Payment will be based on actual confirmed quantities. The contractor is required to include the completed Bid Schedule of Items and Prices within their lump sum proposal to the Government. The bid items shall include all costs associated with the well construction and pump installation.
13. Section 333120 – Waste Water Discharge Pumping and Filtration System
In Specification Section 333120 – Waste Water Discharge Pumping and Filtration System, the drip dispersal and pumping system package is to be provided by a single source supplier. The system must be installed by an installer certified by the equipment supplier and an installer who has a current complex installer license with the health district(s).
14. Section 400100 – Instrumentation and Controls
Please use the following conductors for the following purposes:
#18 TSP for analog signals
#16 THHN for discrete signals
#14 THHN for instrument power and valve power
Items NOT shown on P&ID
Add one (1) #18 TSP from the chlorinator to the PLC panel to pick-up the tablet level signal.
Add four (4) #16 THHN from the tank mixer (SolarBee) to the PLC panel to pick-up the mixer status.
DRAWINGS:
Civil
1. Sheet C-107 – Sewer & Road Plan/Profile M.A.T.E.S. Site On Sheet C-107 – Sewer & Road Plan/Profile M.A.T.E.S. Site at approximate Station 1+30: When installing the new 8-inch SS line, a 4-inch lateral from the MATES Classroom facility will be intersected. Connect the existing 4-inch lateral into the new 8-inch SS line per ISPWC requirements. Remove the existing 4-inch lateral between Station 1+30 and Manhole 4 (Station 0+47) while installing the new 8-inch SS line.
2. Sheet C-311 – Waste Water Disposal Site Plan and Sheet C-312 – Waste Water Discharge Pump Station Plan On Sheet C-311 – Waste Water Disposal Site Plan and Sheet C-312 – Waste Water Discharge Pump Station Plan: Please be aware two 4-foot square pull boxes and two 4-inch communication conduits with four 1-inch innerducts and associated pull strings exist adjacent to the existing wastewater storage lagoon. The boxes are approximately 100 feet apart. The conduits and boxes were installed parallel to and approximately 6 feet east of the 6-foot high fence that runs north and south on the west side of the pond. It is suggested the contractor visually inspect the site to see where the two boxes exist. These could be a potential conflict when the wastewater discharge pump station and drip field supply and return piping are installed. The contractor shall either coordinate his installation with the existing communication conduits and boxes, or relocate the conduit and boxes closer to the fence, or on the west side of the fence. Installing west of the fence would require coordination with the Government. There currently is not any cable installed in the conduits or innerduct.
Structural
1. Sheet S-100D – Dining Facility Foundation Plan and Sheets S-101B, S-102B, S-103B – Barracks Foundation Plans
On Sheet S-100D – Dining Facility Foundation Plan and Sheets S-101B, S-102B, S-103B – Barracks Foundation Plans, Plan Note 11: The intent of having the slabs on grade placed after the roof is installed is to protect the slab on grade as much as possible from damage prior to the application of the polished floor finish. The slab on grade may be placed prior to installing the roof or at any time as long as the floor finish can be installed per the manufacturer's recommendations and without any finish blemishes as deemed unacceptable by the Government. The Government reserves the right to reject any portions of the concrete slab on grade work that in the Government’s opinion is unacceptable and the contractor will be required to replace at the contractor’s own expense.
2. Sheet S-502 – Structural Details
On Sheet S-502 – Structural Details, Detail 11/S-502 – Mechanical Screen Wall – Trash Enclosure, refer to Architectural Sheet A-505-D, Detail 8/505-D - for the correct cross section configuration of the Trash Enclosure Screen Wall. Also refer to Sheet A-202-D – Trash Enclosure Elevations and Plan and related details indicated on Sheets A-501-D, A-502-D and A-505-D.
Architectural
1. Sheet A-111-P – Pump House Plan/Elevations/Sections
On Sheet A-111- P – Pump House Plan/Elevations/Sections, West Elevation: Detail targets labeled 4/A-111-P and 5/A-111-P should be revised to 4/A-501-P and 5/A-501-P.
2. Sheet A-501-P – Pump House Details
On Sheet A-501-P – Pump House Details: Detail 6/A501-P title should be revised from “Louver Head” to “Louver Jamb”.
3. Sheet A-211-D – Dining Facility Interior Elevations
On Sheet A-211-D – Dining Facility Interior Elevations, Elevation 4/A-211-D, Women 110: the keynote number to the left of the image is cut-off and should be #9.
4. Sheet A-401-D – Dining Facility Enlarged Plans
On Sheet A-401-D – Dining Facility Enlarged Plans, Serving Lines Plan: the Serving room number indicated should be changed from 103 to 102.
5. Sheet A-404-D – Dining Facility G.F.G.I. Kitchen Equipment Plan
On Sheet A-404-D – Dining Facility G.F.G.I. Kitchen Equipment Plan: In the Scullery Area the interior elevation Detail 3/A-212-D should have an arrow indicator pointing to the east (right).
6. Sheet A-611-D – Dining Facility Frame Elevations
On Sheet A-611-D – Dining Facility Frame Elevations, Exterior Aluminum Frame Windows: The 3’-4” x 3’-4” window on the right end should be labeled as Frame Type “D” as shown in Office #122 on Sheet A-111-D.
7. Sheet A -111-B – Barracks Ground Floor Plan, Sheet A-112 Barrack 2nd Floor Plan, Sheet A-401-B Barracks Enlarged Latrine/Shower Plans, and Sheet A-211-B – Barracks Interior Elevations
On Sheet A-111-B – Barracks Ground Floor Plan, Sheet A-112 Barrack 2nd Floor Plan, Sheet A-401-B Barracks Enlarged Latrine/Shower Plans, and Sheet A-211-B – Barracks Interior Elevations: Please refer to these drawing sheets and Specification Section 012300 – ABI’s , Part 3 Execution, Paragraph 3.1.A.2 - Alternate for information on the number of rooms, dimensions, and other information necessary for pricing the Base Bid and Alternate finishes for the latrine/shower facilities in the Barracks.
8. Sheet A-115-B – Barracks Ground Floor Core Plan
On Sheet A-115-B – Barracks Ground Floor Core Plan: In Laundry Room 121 the exterior window frame is missing a label and should be Type “B”.
9. Sheet A-116-B – Barracks 2nd Floor Core Plan
On Sheet A-116-B – Barracks 2nd Floor Core Plan: In Laundry Room 220 the exterior window frame is missing a label and should be Type “B”.
10. Sheet A-401-B – Barracks Enlarged Latrine/Shower Plans
On Sheet A-401-B – Barracks Enlarged Latrine/Shower Plans: In the Laundry/Toilet Room Plan the interior elevation designator 9/A-211-B needs to point north (top of the sheet) instead of south.
On Sheet A-401-B – Barracks Enlarged Latrine/Shower Plans: In the Internet Café Plan the interior elevation designator 15/A-211-B needs to point west (left of the sheet) instead of east.
On Sheet A-401-B – Barracks Enlarged Latrine/Shower Plans: In the Internet Café Plan add interior elevation designator 13/A-211-B pointing to the east (left of sheet).
11. Sheet A-602-B – Room Finish Schedule
On Sheet A-602-B – Room Finish Schedule: Second Floor: Change room designator “210 Corridor” to “202 Corridor”.
12. Sheet A-611-B – Barracks Frame Elevations
On Sheet A-611-B – Barracks Frame Elevations, Hollow Metal Door/Window Frames - 2nd Floor: Change the window frame designator from “A” to “J” to avoid confusion with same designator shown in Aluminum Framed Windows. Refer also to Internet Café Plan on Sheet A-401-B and Internet Café Elevation 15/A-211-B.
Electrical
1. Sheet E-100 – Overall Site Electrical Plan and Sheet E-101 – Site Electrical Plan
On Sheet E-100 – Overall Site Electrical Plan and Sheet E-101 – Site Electrical Plan: General Note #8 should reference electrical specification Section 260100 and Section 012100. Primary conduit/trenching work are to be completed by IPCO as part of Allowance No. 2.
2. Sheet E-400 – Electrical Schedules
On Sheet E-400 – Electrical Schedules: For luminaire types FF3, GF1, GF1X, GF2, GF2X, FF2, FF2X and FF1 as listed, 3" deep housings are acceptable for this project.
On Sheet E-400 – Electrical Schedules: For luminaire type DL1 as listed, aluminum or steel housings are acceptable for this luminaire type. Polycarbonate housings will not be allowed.
On Sheet E-400 – Electrical Schedules: For luminaire types P1 and P2, formed aluminum housings are acceptable for this project provided they are similar in appearance to that of the specified luminaire.
3. Sheet E-501 – Electrical Details
On Sheet E-501, Electrical Details, Detail 4/E-501 – Photovoltaic Mounting Detail: Photovoltaic mounting detail (bubble showing PV hold-down clamp attached directly to the standing seam roof) shall be replaced with attached sketch sheet SK-E-501-1. Basis of design racking system is referenced in this addendum.
4. Sheet E-502 – Electrical Details
On Sheet E-502 – Electrical Details, Telecommunications Cabinet Detail: Refer to modified specification Section 271100 – Communications Equipment Room Fitting included as an attachment in this Addendum for specification information on network equipment racks. The equipment rack in Dining Facility Room 117 shall be a network cabinet; all others shown on plans shall be free-standing equipment racks. All frames (racks and cabinets) shall be nominal 84" tall.
On Sheet E-502 – Electrical Details, Telecommunications Cabinet Detail: Provide 1 each connector housing for each fiber optic cable, and 1 each connector housing for each copper backbone cable.
APPROVALS/SUBSTITUTION REQUESTS:
The following manufacturers have been approved for bidding purposes only. Final approval shall be based upon requirements and compliance with plans and specifications.
Specification
Equipment
Manufacturer of
Reference
Description
Proposed Substitution
072100
Extruded Polystyrene Board Insulfoam LLC
087100
Bored Cylindrical Locksets Hager Companies
122113
Horizontal Louver Blinds Springs Window Fashions - Bali
230100
Barracks Custom Fan Coils McQuay International
230100
Packaged Rooftop Unit McQuay International
230100
Hot Water Pre-Heat Coils McQuay International & Greenheck
230100
Energy Recovery Unit
SEMCO & Carnes & Greenheck
230100
Make-up Air Unit
McQuay & Titan Air & Greenheck
230100
Gravity Ventilators
Carnes & Greenheck
230100
Fan Coils
Enviro-Tec & Greenheck
Fan Coil Units (Belt)
Greenheck
230100
Fan Coil Units (Direct) First Company
Electric Duct Heaters
Warren Technologies
230100
Variable Frequency Drives General Electric
230100
Energy Recovery Unit
Air2000 & PennBarry
230100
Hot Water Coil
Clomac & Aerofin
230100
Air Cooled Water Chiller AAON & Clima Cool
230100
Expansion Tanks
Taco
Glycol Tanks
GTP
Air Separator
Taco
Zone Damper
Louvers and Dampers & NCA Manufacturing
Make-up Air Unit
Airedale (Modine)
ATTACHMENTS:
1. Instructions for downloading full size, scalable drawings from Federal Biz Ops website.
2. Specification Section 271100-Communications Equipment Room fittings.
3. Drawing SK-E-501-1 – Photovoltaic Mounting Detail Revisions
END OF ADDENDUM NO. TWO
(End of Summary of Changes)
File details come from the government source that posted it. Updated .