0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 1
SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Telecommunications mounting elements.
2. Backboards.
3. Telecommunications service entrance pathways.
B. Related Sections:
1. Division 27 Section "COMMUNICATIONS HORIZONTAL CABLING" for voice and data cabling associated with system panels and devices.
2. Division 28 Section "CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY
AND SECURITY" for voice and data cabling associated with system panels and devices.
1.3 DEFINITIONS
A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.
B. BICSI: Building Industry Consulting Service International.
C. Channel Cable Tray: A fabricated structure consisting of a one-piece, ventilated-bottom or solid-bottom channel not exceeding 6 inches (152 mm) in width.
D. Ladder Cable Tray: A fabricated structure consisting of two longitudinal side rails connected by individual transverse members (rungs).
E. LAN: Local area network.
F. RCDD: Registered Communications Distribution Designer.
G. Solid-Bottom or Nonventilated Cable Tray: A fabricated structure consisting of a bottom without ventilation openings within integral or separate longitudinal side rails.
H. Trough or Ventilated Cable Tray: A fabricated structure consisting of integral or separate longitudinal rails and a bottom having openings sufficient for the passage of air and using 75 percent or less of the plan area of the surface to support cables.
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 2
1.4 PERFORMANCE REQUIREMENTS
A. Seismic Performance: Floor-mounted cabinets and cable pathways shall withstand the effects of earthquake motions determined according to SEI/ASCE 7.
1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."
1.5 SUBMITTALS
A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for equipment racks and cabinets. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
B. Shop Drawings: For communications equipment room fittings. Include plans, elevations, sections, details, and attachments to other work.
1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Equipment Racks and Cabinets: Include workspace requirements and access for cable connections.
3. Grounding: Indicate location of grounding bus bar and its mounting detail showing standoff insulators and wall mounting brackets.
4. Cable tray layout, showing cable tray route to scale, with relationship between the tray and adjacent structural, electrical, and mechanical elements. Include the following:
a. Vertical and horizontal offsets and transitions.
b. Clearances for access above and to side of cable trays.
c. Vertical elevation of cable trays above the floor or bottom of ceiling structure.
d. Load calculations to show dead and live loads as not exceeding manufacturer's rating for tray and its support elements.
C. Qualification Data: For Installer, qualified layout technician, installation supervisor, and field inspector.
D. Seismic Qualification Certificates: For floor-mounted cabinets, accessories, and components, from manufacturer.
1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.
2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. Base certification on the maximum number of components capable of being mounted in each rack type. Identify components on which certification is based.
3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 3
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Cabling Installer must have personnel certified by BICSI on staff.
1. Layout Responsibility: Preparation of Shop Drawings shall be under the direct supervision of RCDD.
2. Installation Supervision: Installation shall be under the direct supervision of Registered
Technician, who shall be present at all times when Work of this Section is performed at
Project site.
3. Field Inspector: Currently registered by BICSI as RCDD to perform the on-site inspection.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
C. Telecommunications Pathways and Spaces: Comply with TIA/EIA-569-A.
D. Grounding: Comply with ANSI-J-STD-607-A.
1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not deliver or install equipment frames and cable trays until spaces are enclosed and weathertight, wet work in spaces is complete and dry, and work above ceilings is complete.
1.8 COORDINATION
A. Coordinate layout and installation of communications equipment with Contracting Officer's telecommunications and LAN equipment and service suppliers. Coordinate service entrance arrangement with local exchange carrier.
1. Meet jointly with telecommunications and LAN equipment suppliers, local exchange carrier representatives, and Contracting Officer to exchange information and agree on details of equipment arrangements and installation interfaces.
2. Record agreements reached in meetings and distribute them to other participants.
3. Adjust arrangements and locations of distribution frames, cross-connects, and patch panels in equipment rooms to accommodate and optimize arrangement and space requirements of telephone switch and LAN equipment.
4. Adjust arrangements and locations of equipment with distribution frames, cross-connects, and patch panels of cabling systems of other communications, electronic safety and security, and related systems that share space in the equipment room.
B. Coordinate location of power raceways and receptacles with locations of communications equipment requiring electrical power to operate.
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 4
PART 2 - PRODUCTS
2.1 PATHWAYS
A. General Requirements: Comply with TIA/EIA-569-A.
B. Cable Support: NRTL labeled. Cable support brackets shall be designed to prevent degradation of cable performance and pinch points that could damage cable. Cable tie slots fasten cable ties to brackets.
1. Comply with NFPA 70 and UL 2043 for fire-resistant and low-smoke-producing characteristics.
2. Support brackets with cable tie slots for fastening cable ties to brackets.
3. Lacing bars, spools, J-hooks, and D-rings.
4. Straps and other devices.
C. Cable Trays:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Cable Management Solutions, Inc.
b. Cablofil Inc.
c. Cooper B-Line, Inc.
d. Cope - Tyco/Allied Tube & Conduit.
e. GS Metals Corp.
2. Cable Tray Materials: Metal, suitable for indoors and protected against corrosion by electroplated zinc galvanizing, complying with ASTM B 633, Type 1, not less than
0.000472 inch (0.012 mm) thick.
a. Ladder Cable Trays: Nominally 18 inches (455 mm) wide, and a rung spacing of
12 inches (305 mm).
D. Conduit and Boxes: Comply with requirements in Division 26 Section "RACEWAY AND
BOXES FOR ELECTRICAL SYSTEMS." Flexible metal conduit shall not be used.
1. Outlet boxes shall be no smaller than 2 inches (50 mm) wide, 3 inches (75 mm) high, and
2-1/2 inches (64 mm) deep.
2.2 BACKBOARDS
A. Backboards: Plywood, fire-retardant treated, 3/4 by 48 by 96 inches (19 by 1220 by 2440 mm).
Comply with requirements for plywood backing panels specified in Division 06 Section
"ROUGH CARPENTRY."
2.3 EQUIPMENT FRAMES
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 5
1. ADC.
2. Aim Electronics; a brand of Emerson Electric Co.
3. AMP; a Tyco International Ltd. company.
4. Chatsworth
5. Cooper B-Line, Inc.
6. Hubbell Premise Wiring.
7. KRONE Incorporated.
8. Leviton Voice & Data Division.
9. Middle Atlantic Products, Inc.
10. Nordex/CDT; a subsidiary of Cable Design Technologies.
11. Ortronics, Inc.
12. Panduit Corp.
13. Siemon Co. (The).
B. General Frame Requirements:
1. Distribution Frames: Freestanding and wall-mounting, modular-steel units designed for telecommunications terminal support and coordinated with dimensions of units to be supported.
2. Module Dimension: Width compatible with EIA 310 standard, 19-inch (480-mm) panel mounting.
3. Finish: Manufacturer's standard, baked-polyester powder coat.
C. Floor-Mounted Racks: Modular-type, steel construction.
1. Vertical and horizontal cable management channels, top and bottom cable troughs, grounding lug, and a power strip.
2. Baked-polyester powder coat finish.
D. Modular Freestanding Cabinets:
1. Removable and lockable side panels.
2. Hinged and lockable front and rear doors.
3. Adjustable feet for leveling.
4. Screened ventilation openings in the roof and rear door.
5. Cable access provisions in the roof and base.
6. Grounding bus bar.
7. Roof-mounted, 550-cfm (260-L/s) fan with filter.
8. Power strip.
9. Baked-polyester powder coat finish.
10. All cabinets keyed alike.
E. Cable Management for Equipment Frames:
1. Metal, with integral wire retaining fingers.
2. Baked-polyester powder coat finish.
3. Vertical cable management panels shall have front and rear channels, with covers.
4. Provide horizontal crossover cable manager at the top of each relay rack, with a minimum height of two rack units each.
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 6
2.4 POWER STRIPS
A. Power Strips: Comply with UL 1363.
1. Rack mounting.
2. Six, 20-A, 120-V ac, NEMA WD 6, Configuration 5-20R receptacles.
3. LED indicator lights for power and protection status.
4. LED indicator lights for reverse polarity and open outlet ground.
5. Circuit Breaker and Thermal Fusing: When protection is lost, circuit opens and cannot be reset.
6. Cord connected with 15-foot (4.5-m) line cord.
7. Rocker-type on-off switch, illuminated when in on position.
8. Peak Single-Impulse Surge Current Rating: 13 kA per phase.
9. Protection modes shall be line to neutral, line to ground, and neutral to ground. UL 1449 clamping voltage for all 3 modes shall be not more than 330 V.
2.5 GROUNDING
A. Comply with requirements in Division 26 Section "GROUNDING AND BONDING FOR
ELECTRICAL SYSTEMS." for grounding conductors and connectors.
B. Telecommunications Bus Bars:
1. Connectors: Mechanical type, cast silicon bronze, solderless compression-type wire terminals, and long-barrel, two-bolt connection to ground bus bar.
2. Ground Bus Bar: Copper, minimum 1/4 inch thick by 4 inches wide (6 mm thick by 100 mm wide) with 9/32-inch (7.14-mm) holes spaced 1-1/8 inches (28 mm) apart.
3. Stand-Off Insulators: Comply with UL 891 for use in switchboards, 600 V. Lexan or
PVC, impulse tested at 5000 V.
C. Comply with ANSI-J-STD-607-A.
2.6 LABELING
A. Comply with TIA/EIA-606-A and UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers.
PART 3 - EXECUTION
3.1 ENTRANCE FACILITIES
A. Contact telecommunications service provider and arrange for installation of demarcation point, protected entrance terminals, and a housing when so directed by service provider.
B. Install underground pathways complying with recommendations in TIA/EIA-569-A, "Entrance
Facilities" Article.
0801.05/COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 7
3.2 INSTALLATION
A. Comply with NECA 1
B. Comply with BICSI TDMM for layout and installation of communications equipment rooms.
C. Install underground entrance pathway complying with Division 26 Section "RACEWAY AND
BOXES FOR ELECTRICAL SYSTEMS.
D. Cable Trays for Equipment Rooms: Comply with NEMA VE 2 and TIA/EIA-569-A-7.
E. Bundle, lace, and train conductors and cables to terminal points without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools.
F. Furnish and install telecommunications backboards where indicated on drawings. The bottom of the backboards shall be placed approximately six inch AFF, and must extend to a minimum height AFF of eight feet. Walls with less than two feet of free horizontal or vertical equipment mounting space need not be covered with backboards. Mount backboards with the smooth side facing away from the wall, and paint the backboard with two coats of fire resistant white paint prior to mounting. A minimum of six appropriate fasteners shall be used for every sixteen square feet of backboard.
G. Racks shall be securely attached to the concrete floor using a minimum 3/8” hardware or as required by local codes.
H. Racks shall be placed with a minimum of 12” in clearance from the side wall on all sides of the rack with 36” minimum clearance in front and back of each rack. When mounted in a row, maintain a minimum of 36 inches from the wall behind and in front of the row of racks and from the wall at each end of the row.
3.3 FIRESTOPPING
A. Comply with requirements in Division 07 Section "PENETRATION FIRESTOPPING."Comply with TIA/EIA-569-A, Annex A, "Firestopping."
B. Comply with BICSI TDMM, "Firestopping Systems" Article.
END OF SECTION 271100