22 July 2011 From the office of:
ZGA Architects and Planners, Chartered
565 West Myrtle Street - Suite 225 Boise, Idaho 83702
Re:
Operational Readiness Training Complex Phase 1
Orchard Training Area Boise, Idaho
Project No. PN 160093
Solicitation No. W912J7-11-B-0002
ZGA Project No. 0801.05
NOTICE OF CHANGES:
This Addendum No. Four is hereby made a part of the project requirements and contract documents for the referenced project. Be sure to acknowledge this addendum in your Bid/Proposal Form.
It is the obligation of the General Contractors receiving sub-bids to notify their subcontractors and suppliers of items relating to their bid prior to the bid opening.
GENERAL
1. Bid Date Extension The bid date has been extended to 2 August 2011 at 2:00 PM/MDT. The bid opening will occur at the time and date indicated at 3489 West Harvard Street, Building 564, Main Conference Room, Gowen Field, Boise Air Terminal – Boise, Idaho. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions in Solicitation W91217-11-B-0002 for obtaining access to the base in the Site Visitation instructions. Follow the same instructions for obtaining entry to carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
2. Attic Area Sprinklers The attic areas are not intended for storage and are therefore not required to be fire sprinkled per NFPA.
3. Hydrant Flow Data:
A model was not created for the hydrant flow at ORTC. The pump and reservoir system is sized to deliver a minimum of 1,500 GPM for 2 hours. This water flow is consistent with the International Fire Code (IFC) requirements. The buildings at the ORTC will be designed with fire sprinklers and have an emergency back-up power supply for providing fire flows. The requirement for redundant fire flow capacity has been waived (per Idaho National Guard Construction Facility Management Office Memorandum for Record dated 06 May 2009).
4. Pump Building The pumps in the Pump Building are considered booster pumps, not fire pumps. As such the building will not need to be fire sprinkled under NFPA 20.
5. U.S. Army Corps of Engineers (USACE)
The U.S. Army Corps of Engineers (USACE) has no jurisdiction over this project.
SPECIFICATIONS:
1. Section 00010 – Solicitation Contract Form and Specification Section 012300 – ABI’s In Section 00010 – Solicitation Contract Form, Item No. 0002, ABI 001 – Best Bath Shower System: Delete in its entirety.
In Section 012300 – ABI’s, Part 3 – Execution; Paragraph 3.1.A.2 – Delete ABI No. 1: Best Bath Systems in its entirety.
2. Section 084113 – Aluminum-Framed Entrances and Storefronts
In Section 08113 – Aluminum-Framed Entrances and Storefronts: Blast mitigation of the aluminum-framed entrances and storefronts is not required.
3. Section 085113 – Aluminum Windows
In Section 085113 – Aluminum Windows: Blast mitigation of the window frames is not required.
4. Section 087100 – Door Hardware
In Section 087100 – Door Hardware, page 087100-5, paragraph 2.5.1.a: Delete the words “NO EXCEPTION”.
5. Section 210000 – Fire Suppression Sprinkler Systems
In Section 210000 – Fire Suppression Sprinkler Systems, Part 1 General, paragraph 1.2 Codes and Standards: Revise the sentence to delete the wording: “…., UFC 3-600-01 Fire Protection Engineering for Facilities”.
6. Section 271100 – Communications Equipment Room Fittings
*In Section 271100 – Communications Equipment Room Fittings, Part 2 – Products, paragraph 2.3D – Modular Freestanding Cabinets: Add the following:
F. Floor Mounting Racks
1. 2-post steel, freestanding, modular, with vertical and horizontal cable management channels, top and bottom cable troughs and grounding lug.
*NOTE: The original specification Section 271100 was deleted and replaced in Amendment 0002 issued on 07 July 2011.
7. Section 271300 – Communications Backbone Cabling
In Section 271300 – Communications Backbone Cabling, Part 2 – Products: Add the following paragraph to 2.6 Optic Fiber Cable Hardware:
E. Light Interface Unit:
1. Provide rack mounted Light Interface Unit for incoming fiber optic cables.
8. Section 271500 – Communications Horizontal Cabling In Section 271500 – Communications Horizontal Cabling, Part 2 – Products: Add the following to paragraph 2.4 UTP Cable Hardware:
H. Patch Panels for Horizontal Cabling:
1. Rack mounted category 6, 8-pin, 96 port patch panels.
2. Utilize 586B color code standard.
3. Comply with TIA/EIA-568-B.2, meeting or exceeding cable performance.
4. Modular panels housing multiple-numbered jack units with IDC-type connectors at each jack for permanent termination of pair groups of installed cables.
I. Patch Cords
1. Factory made, four-pair cables in 48 inch lengths
2. Terminate with RJ-45 plug on each end. Use keyed plugs for data service.
9. Section 283111 – Digital, Addressable Fire Alarm Systems
In Section 283111 – Digital, Addressable Fire Alarm Systems, Part 2 – Products, paragraph 2.7 – Notification Appliances: Modify notification appliance section to reference combination horn/strobe and strobe devices in lieu of voice/tone notification appliances. Horn/strobe devices shall meet the following general requirements:
1. 24 VDC, electric-vibrating-polarized type compliant with UL 464. Horns shall produce a sound pressure level of 90 dBA measured 10 feet from the horn, using the coded signal prescribed in UL 464 test protocol.
2. Horns shall sound in a temporal pattern.
3. Strobe specifications shall comply with information already contained in specification.
10. Section 28311 – Mass Notification Systems
Refer to new specification Section 28311 – Mass Notification Systems attached to this addendum.
11. Section 321313 – Concrete Paving
In Section 321313 – Concrete Paving, Part 3 Execution, paragraph 3.5 – Joints: Information on form construction; isolation, contraction joint locations, etc. can be found in this section.
12. Section 331613 – Aboveground Water Utility Storage Tanks In Section 331613 – Aboveground Water Utility Storage Tanks, paragraph 1.5.H.2.c – Site Class: Revise to read as Site Class “C” as indicated in the Geotechnical Report prepared by Materials Testing & Inspection dated 23 April 2009.
In Section 331613 – Aboveground Water Utility Storage Tanks, paragraph 1.5.I – Roof Membranes: An aluminum geodesic dome is not desired by the IDARNG. Bid as specified.
13. Section 409312.13 – Electrically Operated Primary Control Valves
Refer to Sheet C-305 – Booster Pump Facilities Mechanical Plan, Keynote #36: This is a 3-inch butterfly valve with an electric actuator. The valve is identified in specification Section 331510 – Valves and the actuator is identified in specification Section 409213.13 – Electrically Operated Primary Control Valves. It is in a 3-inch line and the flow meter (FIT 223) is also in a 3-inch line. FIT 102 is the 4-inch line.
14. Section 409635 – Process Control Strategies In Section 409635 – Process Control Strategies, paragraph 2.6 - System Control; The MATES system has its own independent PLC.
DRAWINGS:
Civil
1. Sheet C-206– Fence Details On Sheet C-206 – Fence Details: The fence details indicated on this sheet apply to all perimeter fencing in the ORTC Phase 1 project.
2. Sheet C-311 – Wastewater Disposal Site Plan On Sheet C- 311 – Wastewater Disposal Site Plan, Waste Water Site Plan: A 4-foot high chain link cattle barrier shall be placed around the subsurface effluent disposal area being installed north of the existing MATES lagoons during Phase 1 ORTC. The cattle barrier should significantly match the existing barrier that encloses the lagoons. Contractor to install approximately 800 LF of cattle barrier on the north, east, and south sides of the disposal area and one lockable double swing 14-foot gate. These will be installed in a location to be determined in the field with the Contracting Officer’s and Engineer’s direction after the subsurface disposal improvements are complete.
On Sheet C- 311 – Wastewater Disposal Site Plan, Existing Lagoon Effluent Pump Station – Detail: Install a 4-inch ductile iron tee upstream of the 4-inch flow meter being installed in the MATES influent lift station line during ORTC Phase 1. Connect the tee to the downstream end of the 90 degree elbow and maintain a minimum 2-foot distance between the downstream tee flange and the upstream side of the flow meter. The center leg of the new tee shall be installed with a blind flange.
Structural
1. Sheet S-502 – Structural Details
On Sheet S-502 – Modify detail 10/S-502 as noted on attached Sheet No. 1 of 2.
2. Sheet S-502 – Structural Details
On Sheet S-502 – Add detail 13/S-502, see attached Sheet No. 2 of 2.
Architectural
1. Sheet A-601-B – Barracks Door Schedule On Sheet A-601-B – Door Schedule: Door 101 Type should change from “A” to “AA” – two doors.
Mechanical
1. Sheet M-512 – HVAC Schedules Refer to attached sketches M-512-R1 and M-512-R2 that have been reprinted for better clarity of the Fan Coil Unit Schedule.
2. Sheet M-514 - HVAC Schedules Refer to attached sketches M-514-R1 that has been reprinted for better clarity of the Air Cooled Water Chiller Schedule.
Electrical
1. Sheet E-000 – Electrical Cover Sheet On attached Sheet E-000 – Electrical Cover Sheet: Refer to new fire alarm and mass notification symbols.
2. Sheet E-111-DF – Dining Facility Fire Alarm Plan
On attached Sheet E-111-DF – Dining Facility Fire Alarm Plan: Refer to new fire alarm and mass notification appliance layouts and connections.
3. Sheet E-111-DS – Dining Facility Special Systems Plan
On attached Sheet E-111-DS – Dining Facility Special Systems Plan: Provide two (2) analog phone lines to fire alarm control panel and two (2) analog phone lines to mass notification panel in lieu of quantity indicated.
4. Sheet E-121-DE – Dining Facility Mezzanine Electrical Plan
On attached Sheet E-121-DE – Dining Facility Mezzanine Electrical Plan: Refer to new fire alarm and mass notification appliance layouts and connections.
5. Sheet E-211-BF – Barracks Ground Floor Fire Alarm Plan – Area “A” On attached Sheet E-211-BF – Barracks Ground Floor Fire Alarm Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.
6. Sheet E-211-BS – Barracks Ground Floor Special Systems Plan – Area “A” On attached Sheet E-211-BS – Barracks Ground Floor Special Systems Plan – Area “A”: Provide two (2) analog phone lines to fire alarm control panel and two (2) analog phone lines to mass notification panel in lieu of quantity indicated
7. Sheet E-212-BF – Barracks Ground Floor Fire Alarm Plan – Area “B”
On attached Sheet E-212-BF – Barracks Ground Floor Fire Alarm Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.
8. Sheet E-221-BF – Barracks 2nd Floor Fire Alarm Plan – Area “A”
On attached Sheet E-221-BF – Barracks 2nd Floor Fire Alarm Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.
9. Sheet E-222-BF – Barracks 2nd Floor Fire Alarm Plan – Area “B”
On attached Sheet E-222-BF – Barracks 2nd Floor Fire Alarm Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.
10. Sheet E-231-BE – Barracks Mezzanine Electrical Plan – Area “A”
On attached Sheet E-231-BE – Barracks Mezzanine Electrical Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.
11. Sheet E-232-BE – Barracks Mezzanine Electrical Plan – Area “B”
On attached Sheet E-232-BE – Barracks Mezzanine Electrical Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.
12. Sheet E-400 – Electrical Schedules On Sheet E-400 – Electrical Schedules: Luminaire Type “P1” – Pole Mounted Metal Halide Cut-off Luminaire to be modified as follows:
1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.
2. LED color temperature shall be 5100 degrees Kelvin.
3. Luminaire total lumen output shall be a minimum of 21,500.
4. Overall luminance distribution shall be Type III and shall be achieved using individual acrylic lens moldings at LED’s.
5. Housing shall be low-copper, single-piece die-cast aluminum housing.
6. LED luminaries shall comply with UL 1598 and UL 8750.
7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.
8. LED applied standards: LM80.
9. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)
On Sheet E-400 – Electrical Schedules: Luminaire Type “P2” – Pole Mounted Metal Halide Cut-off Luminaire to be modified as follows:
1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.
2. LED color temperature shall be 5100 degrees Kelvin.
3. Luminaire total lumen output shall be a minimum of 7,400.
4. Overall luminance distribution shall be Type III and shall be achieved using individual acrylic lens moldings at LED’s.
5. Housing shall be low-copper, single-piece die-cast aluminum housing.
6. LED luminaries shall comply with UL 1598 and UL 8750.
7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.
8. LED applied standards: LM80.
9. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)
On Sheet E-400 – Electrical Schedules: Luminaire Types WB1, WB1X and WB2 – Wall Mounted Metal Halide Floodlight to be modified as follows:
1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.
2. LED color temperature shall be 5100 degrees Kelvin.
3. Luminaire total lumen output shall be a minimum of 7,200.
4. Overall luminance distribution shall be Medium Distribution and shall be achieved using individual acrylic lens moldings at LED’s.
5. Housing shall be low-copper, single-piece die-cast aluminum housing.
6. LED luminaries shall comply with UL 1598 and UL 8750.
7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.
8. LED applied standards: LM80.
9. Type WB1X shall be powered by battery pack ‘EB1’ in the event of a power loss.
10. Type WB2 shall have integral button photocell.
11. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)
13. Sheet E-601 – One Line Diagram On Sheet E-601 – One Line Diagram: The Pump house One Line Diagram is for the ORTC Phase 1 Pump house. The pumps on E-601 are for the pumps listed on Sheet I-102 – ORTC Water System P&ID.
Instrumentation Controls
1. Sheet I-102 – ORTC Water System P&ID and Sheet I-103 MATES Water System P&ID The pumps listed in specification Section 409635 – Process Control Strategies, paragraph 2.1 correspond to pumps P211, P212, P213 and P214 on Sheet I-102 –Water System P&ID – ORTC System. These four pumps are new and part of the ORTC Phase 1 project. The four pumps, P-1, P-2, P-3 and P-4 shown on Sheet I-103 –Water System P&ID- MATES System are existing.
2. Sheet I-103 – Water System P&ID – MATES System:
On Sheet I-103 – Water System P&ID – MATES System: The four existing VFD model numbers should be verified in the field. The record drawings indicate these are Danfoss, but did not provide a model number.
3. Sheet I-104 – Water System System Architecture:
On Sheet I-104 – Water System System Architecture: Only one touch screen computer is required at the ORTC site, the MATES unit is existing. The MATES HMI software is Factorytalk View Standalone Server Version 6.
APPROVALS/SUBSTITUTION REQUESTS:
The following manufacturers have been approved for bidding purposes only. Final approval shall be based upon requirements and compliance with plans and specifications.
Specification
Equipment
Manufacturer of
Reference
Description
Proposed Substitution 074113
Metal Roof Panels
The Bryer Co. -TBC-Superseam
074213
Metal Wall Panels
The Bryer Co. - TBC-Flush
074213
Metal Soffit Panels
The Bryer Co. - TBC-Flush
084113
Aluminum Entrances
Oldcastle B. E.
111300
Loading Dock Equipment Nordock, Inc.
220100
Thermoplastic Mixing Valve Bradley
220100
Emergency Fixtures
Bradley
220100
Plumbing Products
E.L. Mustee
220100
Water Cooler/Drinking Ftn Elkay
230100
Gravity Ventilators
Acme Manufacturing
263100
Photovoltaic Panels
Sun-Tech, Inc.
263100
Photovoltaic Panels
Sanyo
ATTACHMENTS:
1. Detail 10-S-502.
2. Detail 13-S-502.
3. Sketch M-512-R1
4. Sketch M-512-R2
5. Sketch M-514-R1
6. Revised Drawing E-000
7. Revised Drawing E-111-DF
8. Revised Drawing E-121-DE
9. Revised Drawing E-211-BF
10. Revised Drawing E-212-BF
11. Revised Drawing E-221-BF
12. Revised Drawing E-222-BF
13. Revised Drawing E-231-BE
14. Revised Drawing E-232-BE
15. Specification Section 283113 – Mass Notification Systems
END OF ADDENDUM NO. FOUR