Addendum No. 4 - 21 July 2011.DOC

DOC document 91 KB Posted

Attached to
Construct ORTC Phase 1
Solicitation number
W912J7-11-B-0002
Issued by

About this file

Addendum 4

View the file

Other files

File Type Posted
W912J7-11-B-0002 0005.doc DOC document
P-212-R1.pdf PDF
M-514-R2.pdf PDF
P-411-R1.pdf PDF
P-312-R1.pdf PDF
Ramp Joint Detail.pdf PDF
Detail 13-S-502.pdf PDF
Detail 10-S-502.pdf PDF
283113_ MASS NOTIFICATION SYSTEMS.pdf PDF
E232BE.pdf PDF
E211BF.pdf PDF
09027_M-512-R2.pdf PDF
E231BE.pdf PDF
E000.pdf PDF
E212BF.pdf PDF
W912J7-11-B-0002 0004 SF30.pdf PDF
09027_M-514-R1.pdf PDF
E111DF.pdf PDF
E121DE.pdf PDF
M-512-R2.pdf PDF
M-514-R1.pdf PDF
W912J7-11-B-0002 0003.doc DOC document
M-512-R1.pdf PDF
Mechanical Enclosure Sketch - 14 July 2011.pdf PDF
P-222-B-R1.pdf PDF
W912J7-11-B-0002 0002.doc DOC document
Prebid minutes attendance.PDF PDF
271100_FL.pdf PDF
SK-E-501-1.pdf PDF
PDF Printing Instructions 11x17 to 22x34.pdf PDF
E311PE.pdf PDF
E111DP.pdf PDF
E600.pdf PDF
E103.pdf PDF
E601.pdf PDF
E404.pdf PDF
E402.pdf PDF
263214.pdf PDF
ADD-1-A1.pdf PDF
ADD-1-A2.pdf PDF
263213.pdf PDF
E101.pdf PDF
263600.pdf PDF
ORTC_PHASE_1_FINAL_SUB_DRAWINGS.pdf PDF
ORTC_PHASE_1_PROJECT_SPEC_VOL_1.pdf PDF
ORTC_PHASE_1_PROJECT_SPEC_2.pdf PDF
ORTC Geotechnical Report.pdf PDF
W912J7-11-B-0002 0001.doc DOC document
W912J7-11-B-0002.doc DOC document
Geotechnical Report Cover Letter.DOC DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

22 July 2011 From the office of:

ZGA Architects and Planners, Chartered

565 West Myrtle Street - Suite 225 Boise, Idaho 83702

Re:

Operational Readiness Training Complex Phase 1

Orchard Training Area Boise, Idaho

Project No. PN 160093

Solicitation No. W912J7-11-B-0002

ZGA Project No. 0801.05

NOTICE OF CHANGES:

This Addendum No. Four is hereby made a part of the project requirements and contract documents for the referenced project. Be sure to acknowledge this addendum in your Bid/Proposal Form.

It is the obligation of the General Contractors receiving sub-bids to notify their subcontractors and suppliers of items relating to their bid prior to the bid opening.

GENERAL

1. Bid Date Extension The bid date has been extended to 2 August 2011 at 2:00 PM/MDT. The bid opening will occur at the time and date indicated at 3489 West Harvard Street, Building 564, Main Conference Room, Gowen Field, Boise Air Terminal – Boise, Idaho. All interested offerors and their major subcontractors are encouraged to attend the bid opening.

Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions in Solicitation W91217-11-B-0002 for obtaining access to the base in the Site Visitation instructions. Follow the same instructions for obtaining entry to carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.

2. Attic Area Sprinklers The attic areas are not intended for storage and are therefore not required to be fire sprinkled per NFPA.

3. Hydrant Flow Data:

A model was not created for the hydrant flow at ORTC. The pump and reservoir system is sized to deliver a minimum of 1,500 GPM for 2 hours. This water flow is consistent with the International Fire Code (IFC) requirements. The buildings at the ORTC will be designed with fire sprinklers and have an emergency back-up power supply for providing fire flows. The requirement for redundant fire flow capacity has been waived (per Idaho National Guard Construction Facility Management Office Memorandum for Record dated 06 May 2009).

4. Pump Building The pumps in the Pump Building are considered booster pumps, not fire pumps. As such the building will not need to be fire sprinkled under NFPA 20.

5. U.S. Army Corps of Engineers (USACE)

The U.S. Army Corps of Engineers (USACE) has no jurisdiction over this project.

SPECIFICATIONS:

1. Section 00010 – Solicitation Contract Form and Specification Section 012300 – ABI’s In Section 00010 – Solicitation Contract Form, Item No. 0002, ABI 001 – Best Bath Shower System: Delete in its entirety.

In Section 012300 – ABI’s, Part 3 – Execution; Paragraph 3.1.A.2 – Delete ABI No. 1: Best Bath Systems in its entirety.

2. Section 084113 – Aluminum-Framed Entrances and Storefronts

In Section 08113 – Aluminum-Framed Entrances and Storefronts: Blast mitigation of the aluminum-framed entrances and storefronts is not required.

3. Section 085113 – Aluminum Windows

In Section 085113 – Aluminum Windows: Blast mitigation of the window frames is not required.

4. Section 087100 – Door Hardware

In Section 087100 – Door Hardware, page 087100-5, paragraph 2.5.1.a: Delete the words “NO EXCEPTION”.

5. Section 210000 – Fire Suppression Sprinkler Systems

In Section 210000 – Fire Suppression Sprinkler Systems, Part 1 General, paragraph 1.2 Codes and Standards: Revise the sentence to delete the wording: “…., UFC 3-600-01 Fire Protection Engineering for Facilities”.

6. Section 271100 – Communications Equipment Room Fittings

*In Section 271100 – Communications Equipment Room Fittings, Part 2 – Products, paragraph 2.3D – Modular Freestanding Cabinets: Add the following:

F. Floor Mounting Racks

1. 2-post steel, freestanding, modular, with vertical and horizontal cable management channels, top and bottom cable troughs and grounding lug.

*NOTE: The original specification Section 271100 was deleted and replaced in Amendment 0002 issued on 07 July 2011.

7. Section 271300 – Communications Backbone Cabling

In Section 271300 – Communications Backbone Cabling, Part 2 – Products: Add the following paragraph to 2.6 Optic Fiber Cable Hardware:

E. Light Interface Unit:

1. Provide rack mounted Light Interface Unit for incoming fiber optic cables.

8. Section 271500 – Communications Horizontal Cabling In Section 271500 – Communications Horizontal Cabling, Part 2 – Products: Add the following to paragraph 2.4 UTP Cable Hardware:

H. Patch Panels for Horizontal Cabling:

1. Rack mounted category 6, 8-pin, 96 port patch panels.

2. Utilize 586B color code standard.

3. Comply with TIA/EIA-568-B.2, meeting or exceeding cable performance.

4. Modular panels housing multiple-numbered jack units with IDC-type connectors at each jack for permanent termination of pair groups of installed cables.

I. Patch Cords

1. Factory made, four-pair cables in 48 inch lengths

2. Terminate with RJ-45 plug on each end. Use keyed plugs for data service.

9. Section 283111 – Digital, Addressable Fire Alarm Systems

In Section 283111 – Digital, Addressable Fire Alarm Systems, Part 2 – Products, paragraph 2.7 – Notification Appliances: Modify notification appliance section to reference combination horn/strobe and strobe devices in lieu of voice/tone notification appliances. Horn/strobe devices shall meet the following general requirements:

1. 24 VDC, electric-vibrating-polarized type compliant with UL 464. Horns shall produce a sound pressure level of 90 dBA measured 10 feet from the horn, using the coded signal prescribed in UL 464 test protocol.

2. Horns shall sound in a temporal pattern.

3. Strobe specifications shall comply with information already contained in specification.

10. Section 28311 – Mass Notification Systems

Refer to new specification Section 28311 – Mass Notification Systems attached to this addendum.

11. Section 321313 – Concrete Paving

In Section 321313 – Concrete Paving, Part 3 Execution, paragraph 3.5 – Joints: Information on form construction; isolation, contraction joint locations, etc. can be found in this section.

12. Section 331613 – Aboveground Water Utility Storage Tanks In Section 331613 – Aboveground Water Utility Storage Tanks, paragraph 1.5.H.2.c – Site Class: Revise to read as Site Class “C” as indicated in the Geotechnical Report prepared by Materials Testing & Inspection dated 23 April 2009.

In Section 331613 – Aboveground Water Utility Storage Tanks, paragraph 1.5.I – Roof Membranes: An aluminum geodesic dome is not desired by the IDARNG. Bid as specified.

13. Section 409312.13 – Electrically Operated Primary Control Valves

Refer to Sheet C-305 – Booster Pump Facilities Mechanical Plan, Keynote #36: This is a 3-inch butterfly valve with an electric actuator. The valve is identified in specification Section 331510 – Valves and the actuator is identified in specification Section 409213.13 – Electrically Operated Primary Control Valves. It is in a 3-inch line and the flow meter (FIT 223) is also in a 3-inch line. FIT 102 is the 4-inch line.

14. Section 409635 – Process Control Strategies In Section 409635 – Process Control Strategies, paragraph 2.6 - System Control; The MATES system has its own independent PLC.

DRAWINGS:

Civil

1. Sheet C-206– Fence Details On Sheet C-206 – Fence Details: The fence details indicated on this sheet apply to all perimeter fencing in the ORTC Phase 1 project.

2. Sheet C-311 – Wastewater Disposal Site Plan On Sheet C- 311 – Wastewater Disposal Site Plan, Waste Water Site Plan: A 4-foot high chain link cattle barrier shall be placed around the subsurface effluent disposal area being installed north of the existing MATES lagoons during Phase 1 ORTC. The cattle barrier should significantly match the existing barrier that encloses the lagoons. Contractor to install approximately 800 LF of cattle barrier on the north, east, and south sides of the disposal area and one lockable double swing 14-foot gate. These will be installed in a location to be determined in the field with the Contracting Officer’s and Engineer’s direction after the subsurface disposal improvements are complete.

On Sheet C- 311 – Wastewater Disposal Site Plan, Existing Lagoon Effluent Pump Station – Detail: Install a 4-inch ductile iron tee upstream of the 4-inch flow meter being installed in the MATES influent lift station line during ORTC Phase 1. Connect the tee to the downstream end of the 90 degree elbow and maintain a minimum 2-foot distance between the downstream tee flange and the upstream side of the flow meter. The center leg of the new tee shall be installed with a blind flange.

Structural

1. Sheet S-502 – Structural Details

On Sheet S-502 – Modify detail 10/S-502 as noted on attached Sheet No. 1 of 2.

2. Sheet S-502 – Structural Details

On Sheet S-502 – Add detail 13/S-502, see attached Sheet No. 2 of 2.

Architectural

1. Sheet A-601-B – Barracks Door Schedule On Sheet A-601-B – Door Schedule: Door 101 Type should change from “A” to “AA” – two doors.

Mechanical

1. Sheet M-512 – HVAC Schedules Refer to attached sketches M-512-R1 and M-512-R2 that have been reprinted for better clarity of the Fan Coil Unit Schedule.

2. Sheet M-514 - HVAC Schedules Refer to attached sketches M-514-R1 that has been reprinted for better clarity of the Air Cooled Water Chiller Schedule.

Electrical

1. Sheet E-000 – Electrical Cover Sheet On attached Sheet E-000 – Electrical Cover Sheet: Refer to new fire alarm and mass notification symbols.

2. Sheet E-111-DF – Dining Facility Fire Alarm Plan

On attached Sheet E-111-DF – Dining Facility Fire Alarm Plan: Refer to new fire alarm and mass notification appliance layouts and connections.

3. Sheet E-111-DS – Dining Facility Special Systems Plan

On attached Sheet E-111-DS – Dining Facility Special Systems Plan: Provide two (2) analog phone lines to fire alarm control panel and two (2) analog phone lines to mass notification panel in lieu of quantity indicated.

4. Sheet E-121-DE – Dining Facility Mezzanine Electrical Plan

On attached Sheet E-121-DE – Dining Facility Mezzanine Electrical Plan: Refer to new fire alarm and mass notification appliance layouts and connections.

5. Sheet E-211-BF – Barracks Ground Floor Fire Alarm Plan – Area “A” On attached Sheet E-211-BF – Barracks Ground Floor Fire Alarm Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.

6. Sheet E-211-BS – Barracks Ground Floor Special Systems Plan – Area “A” On attached Sheet E-211-BS – Barracks Ground Floor Special Systems Plan – Area “A”: Provide two (2) analog phone lines to fire alarm control panel and two (2) analog phone lines to mass notification panel in lieu of quantity indicated

7. Sheet E-212-BF – Barracks Ground Floor Fire Alarm Plan – Area “B”

On attached Sheet E-212-BF – Barracks Ground Floor Fire Alarm Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.

8. Sheet E-221-BF – Barracks 2nd Floor Fire Alarm Plan – Area “A”

On attached Sheet E-221-BF – Barracks 2nd Floor Fire Alarm Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.

9. Sheet E-222-BF – Barracks 2nd Floor Fire Alarm Plan – Area “B”

On attached Sheet E-222-BF – Barracks 2nd Floor Fire Alarm Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.

10. Sheet E-231-BE – Barracks Mezzanine Electrical Plan – Area “A”

On attached Sheet E-231-BE – Barracks Mezzanine Electrical Plan – Area “A”: Refer to new fire alarm and mass notification appliance layouts and connections.

11. Sheet E-232-BE – Barracks Mezzanine Electrical Plan – Area “B”

On attached Sheet E-232-BE – Barracks Mezzanine Electrical Plan – Area “B”: Refer to new fire alarm and mass notification appliance layouts and connections.

12. Sheet E-400 – Electrical Schedules On Sheet E-400 – Electrical Schedules: Luminaire Type “P1” – Pole Mounted Metal Halide Cut-off Luminaire to be modified as follows:

1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.

2. LED color temperature shall be 5100 degrees Kelvin.

3. Luminaire total lumen output shall be a minimum of 21,500.

4. Overall luminance distribution shall be Type III and shall be achieved using individual acrylic lens moldings at LED’s.

5. Housing shall be low-copper, single-piece die-cast aluminum housing.

6. LED luminaries shall comply with UL 1598 and UL 8750.

7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.

8. LED applied standards: LM80.

9. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)

On Sheet E-400 – Electrical Schedules: Luminaire Type “P2” – Pole Mounted Metal Halide Cut-off Luminaire to be modified as follows:

1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.

2. LED color temperature shall be 5100 degrees Kelvin.

3. Luminaire total lumen output shall be a minimum of 7,400.

4. Overall luminance distribution shall be Type III and shall be achieved using individual acrylic lens moldings at LED’s.

5. Housing shall be low-copper, single-piece die-cast aluminum housing.

6. LED luminaries shall comply with UL 1598 and UL 8750.

7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.

8. LED applied standards: LM80.

9. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)

On Sheet E-400 – Electrical Schedules: Luminaire Types WB1, WB1X and WB2 – Wall Mounted Metal Halide Floodlight to be modified as follows:

1. Lamp source shall be LED configured in modular, field replaceable “bars” also known as “light engines”.

2. LED color temperature shall be 5100 degrees Kelvin.

3. Luminaire total lumen output shall be a minimum of 7,200.

4. Overall luminance distribution shall be Medium Distribution and shall be achieved using individual acrylic lens moldings at LED’s.

5. Housing shall be low-copper, single-piece die-cast aluminum housing.

6. LED luminaries shall comply with UL 1598 and UL 8750.

7. LED drivers shall be solid state, UL listed, suitable for outdoor environments. Power factor shall be greater that 90%, THD <20%.

8. LED applied standards: LM80.

9. Type WB1X shall be powered by battery pack ‘EB1’ in the event of a power loss.

10. Type WB2 shall have integral button photocell.

11. All other fixture specifications shall remain per contract documents (finish, mounting, etc.)

13. Sheet E-601 – One Line Diagram On Sheet E-601 – One Line Diagram: The Pump house One Line Diagram is for the ORTC Phase 1 Pump house. The pumps on E-601 are for the pumps listed on Sheet I-102 – ORTC Water System P&ID.

Instrumentation Controls

1. Sheet I-102 – ORTC Water System P&ID and Sheet I-103 MATES Water System P&ID The pumps listed in specification Section 409635 – Process Control Strategies, paragraph 2.1 correspond to pumps P211, P212, P213 and P214 on Sheet I-102 –Water System P&ID – ORTC System. These four pumps are new and part of the ORTC Phase 1 project. The four pumps, P-1, P-2, P-3 and P-4 shown on Sheet I-103 –Water System P&ID- MATES System are existing.

2. Sheet I-103 – Water System P&ID – MATES System:

On Sheet I-103 – Water System P&ID – MATES System: The four existing VFD model numbers should be verified in the field. The record drawings indicate these are Danfoss, but did not provide a model number.

3. Sheet I-104 – Water System System Architecture:

On Sheet I-104 – Water System System Architecture: Only one touch screen computer is required at the ORTC site, the MATES unit is existing. The MATES HMI software is Factorytalk View Standalone Server Version 6.

APPROVALS/SUBSTITUTION REQUESTS:

The following manufacturers have been approved for bidding purposes only. Final approval shall be based upon requirements and compliance with plans and specifications.

Specification

Equipment

Manufacturer of

Reference

Description

Proposed Substitution 074113

Metal Roof Panels

The Bryer Co. -TBC-Superseam

074213

Metal Wall Panels

The Bryer Co. - TBC-Flush

074213

Metal Soffit Panels

The Bryer Co. - TBC-Flush

084113

Aluminum Entrances

Oldcastle B. E.

111300

Loading Dock Equipment Nordock, Inc.

220100

Thermoplastic Mixing Valve Bradley

220100

Emergency Fixtures

Bradley

220100

Plumbing Products

E.L. Mustee

220100

Water Cooler/Drinking Ftn Elkay

230100

Gravity Ventilators

Acme Manufacturing

263100

Photovoltaic Panels

Sun-Tech, Inc.

263100

Photovoltaic Panels

Sanyo

ATTACHMENTS:

1. Detail 10-S-502.

2. Detail 13-S-502.

3. Sketch M-512-R1

4. Sketch M-512-R2

5. Sketch M-514-R1

6. Revised Drawing E-000

7. Revised Drawing E-111-DF

8. Revised Drawing E-121-DE

9. Revised Drawing E-211-BF

10. Revised Drawing E-212-BF

11. Revised Drawing E-221-BF

12. Revised Drawing E-222-BF

13. Revised Drawing E-231-BE

14. Revised Drawing E-232-BE

15. Specification Section 283113 – Mass Notification Systems

END OF ADDENDUM NO. FOUR