This is a Questions and Answers document from a federal contract solicitation addressing contractor inquiries regarding switchboard documentation and site requirements.

The contracting officer provided guidance in response to a contractor question about the availability of existing switchboard drawings and specifications for a new switchboard installation. The response confirms that drawings of the existing switchboard are available as attachments but acknowledges these drawings are outdated. The contracting officer directs contractors to rely on the Statement of Work (SOW) as the primary guidance document and emphasizes the importance of attending the mandatory site visit to assess current conditions and understand the actual scope of work. This response indicates that the site visit and SOW specifications take precedence over the provided historical drawings in determining work requirements and specifications for the switchboard project.

View the file

Other files

File Type Posted
Switchboard Answers 15 JULY.pdf PDF
More swithboard Answers 15 JULY.pdf PDF
2593 Kingman Drawings 85.pdf PDF
2593 Kingman Drawings 103.pdf PDF
SOW.pdf PDF
CSS_Main Switchboard Panel Install_revised (002).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Would you happen to have any drawings of the existing switchboard and drawings and specifications for the new switchboard?

Answer: Attached are drawings of the existing switchboard. As you can see these drawings are old. You should follow the SOW and attend the site visit.