W912HN-18-R-3003 AMD1 SPECS VOL1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd3.pdf | ||
| 18R3003vol1.PDF | ||
| W912HN-18-R-3003_VOL1_AMD2.pdf | ||
| 18R3003vol2.PDF | ||
| 18R3003vol3.PDF | ||
| W912HN-18-R-3003_VOL2_AMD2.pdf | ||
| 18R3003vol1.PDF | ||
| amd2.pdf | ||
| amd1.pdf | ||
| W912HN-18-R-3003_VOL2_AMD1.pdf | ||
| 18R3003vol2.PDF | ||
| 18R3003vol3.PDF | ||
| W912HN-18-R-3003_VOL1_AMD1.pdf | ||
| W912HN-18-B-3003_VOL1.pdf | ||
| 18R3003vol3.PDF | ||
| W912HN-18-B-3003_VOL2.pdf | ||
| 18R3003vol1.PDF | ||
| 18R3003vol2.PDF |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Benning, Georgia
Solicitation Number
W912HN-18-R-3003
Training Support Facility Volume 3 of 3: Procurement and Contracting Requirements and Specification Divisions 01 - 07
PN 80855
March 2018
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Tr ai ni ng Suppor t Faci l i t y 18R3003 Ft . Benni ng, GA
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 57 19. 00 37 I NDOOR AI R QUALI TY ( I AQ) MANAGEMENT
01 74 19. 00 37 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 00 37 COMMISSIONING
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
03 35 00. 00 10 CONCRETE FI NI SHI NG
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 05 23 WELDI NG, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FI NI SH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 13 53 ELASTOMERI C SHEET WATERPROOFI NG
07 14 00 FLUI D- APPLI ED WATERPROOFI NG
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 27 19. 01 SELF- ADHERI NG AI R BARRI ERS
07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 41 63 FABRI CATED ROOF PANEL ASSEMBLI ES
07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES
07 60 00 FLASHI NG AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
07 95 00 * 1 EXPANSI ON CONTROL
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMI NUM DOORS AND FRAMES
08 14 00 * 1 WOOD DOORS
08 33 23 OVERHEAD COI LI NG DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLI ES
08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08 60 45 * 1 SKYLI GHTS AND TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 23. 13 SAFETY FI LMS
08 91 00 METAL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C AND PORCELAI N TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 68 00 CARPETING
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VI SUAL DI SPLAY UNI TS
10 21 13 TOI LET COMPARTMENTS
10 22 39 FOLDI NG PANEL PARTI TI ONS
10 22 43 SLI DI NG PARTI TI ONS
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 44 43. 00 37 FI RE EXTI NGUI SHER ACEESSORI ES
DI VI SI ON 12 - FURNI SHI NGS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 19 METAL BUI LDI NG SYSTEMS
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 01 * 1 LONWORKS DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER
PROJECT TABLE OF CONTENTS Page 2
BUI LDI NG CONTROL SYSTEMS
23 11 25 FACI LI TY GAS PI PI NG
23 23 00 REFRI GERANT PI PI NG
23 52 00 HEATI NG BOI LERS
23 57 10. 00 10 FORCED HOT WATER HEATI NG SYSTEMS USI NG WATER AND STEAM
HEAT EXCHANGERS
23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 64 26 CHI LLED, CHI LLED- HOT, AND CONDENSER WATER PI PI NG SYSTEMS
23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 08 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM TESTI NG
25 10 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM ( UMCS) FRONT END
AND I NTEGRATI ON
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 27 13. 10 30 ELECTRI C METERS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14. 00 10 CABLE TELEVI SI ON PREMI SES DI STRI BUTI ON SYSTEM
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16. 13 CHEMI CAL TERMI TE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 16 BASE COURSE FOR RI GI D PAVI NG
32 11 23 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE COURSE
32 12 10 BI TUMI NOUS TACK AND PRI ME COATS
32 12 17 HOT MI X BI TUMI NOUS PAVEMENT
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE
FACILITIES
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 17 24. 00 10 PAVEMENT MARKI NGS
32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
PROJECT TABLE OF CONTENTS Page 3
33 11 00 WATER DI STRI BUTI ON
33 30 00 SANI TARY SEWERS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13. 13 BRI DGE CRANES
APPENDICES
Appendi x A GEOTECHNI CAL REPORT Appendi x B ADDENDUM TO GEOTECHNI CAL REPORT
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
Training Support Facility, Ft. Benning, Georgia, PN80855
Contractual POC: Crystal E. North, 912-652-5183, or Crystal.E.North@usace.army.mil
Technical POC: Mark T. Puhalla, 912-652-5696, or Mark.T.Puhalla@usace.army.mil
A. This acquisition w ill be aw arded utilizing a Low est Priced Technically Acceptable (LPTA) Source Selection Process in accordance w ith
FAR 15.101-2.
B. This solicitation is being solicited on an unrestricted basis as full and open competition, but contains a HUBZone Price Evaluation Preference.
C. The North American Industry Classif ication System (NAICS) code is 236220.
D. Per FAR 36.204 Disclosure of Magnitude: the Magnitude of this project is betw een $25M and $100M.
E. The proposal of the successful offeror shall be incorporated by reference into the aw arded contract.
***Please note that failure to f ill out ALL clauses/provisions in Section 00 45 00 may result in your proposal being found Non-Responsive***
CRYSTAL E NORTH 912-652-5183
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
05-Mar-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________05 Apr 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT SAVANNAH
100 W OGLETHORPE AVENUE
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE W912HN
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
US ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912HN18R3003 64
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912HN18R3003
Section SF 30 - Block 14 Continuation Page (SF 30)
B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.
Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0001) is hereby added to and made a part of the solicitation; the Section is replaced in its entirety and changes are neither underlined nor struck out.
Revised Sections Added Sections Replaced Sections 03 30 00 07 95 00 23 09 23.01 07 92 00 08 14 00 09 90 00 08 60 45 21 13 13.00 10 23 09 00 25 10 10
C. CONTRACT DRAWINGS – File No. W912HN-18-R-3003:
VOLUME 1
CS503.PDF CS503 FENCE DETAILS
VOLUME 2
SF501.pdf SF501 FRAMING DETAILS A-108.pdf A-108 REFLECTED CEILING PLAN A-600.pdf A-600 ROOM FINISH SCHEDULE MH102.pdf MH102 HVAC DUCTWORK PLAN - PART B MH104.pdf MH104 HVAC DUCTWORK PLAN - PART D MH105.pdf MH105 HVAC DUCTWORK PLAN - PART E E-002.pdf E-002 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS EY101.pdf EY101 SPECIAL SYSTEMS PLAN A EY102.pdf EY102 SPECIAL SYSTEMS PLAN B EY103.pdf EY103 SPECIAL SYSTEMS PLAN C EY104.pdf EY104 SPECIAL SYSTEMS PLAN D EY105.pdf EY105 SPECIAL SYSTEMS PLAN E EY601.pdf EY601 SPECIAL SYSTEMS RISER DIAGRAMS
Revised in accordance with Amendment 0001 dated March 2018 are hereby added to and made a part of the Contract Drawings.
Pre-Proposal and Site Visit Minutes
PN80855 Training Support Facility Fort Benning, GA
Solicitation W912HN-18-R-3003
(a) Amy Vaughn, USACE Resident Engineer opened the session at 1:00 PM on 15 March 2018 at the project site. See attached roster for attendees.
(b) The government briefed a general overview of the project scope.
(c) The government informed the bidders to be sure to view the entire solicitation and drawings.
(d) Attendees were informed that any specific or technical questions are to be posted to ProjNet as a Bidder Inquiry.
(e) Bidders were provided an opportunity to walk through, view, and take pictures of site.
(f) The site visit was adjourned at about 2:15 PM.
Section 00 01 15 - List of Drawing Sheets
WAGE DETERMINATION
General Decision Number: GA180130 01/05/2018 GA130 Superseded General Decision Number: GA20170130 State: Georgia Construction Type: Building County: Chattahoochee County in Georgia http://www.wdol.gov/dba.aspx
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base - Construct Training Support Facility, Complete
FOB: Destination
NET AMT
0002 1 Job Base - Site Preparation & Development Complete
0003 1 Job OPTION Option 1 - Bridge Crane and Associated Sitework and Paving, Complete.
***See Note.
TOTAL BASE OFFER (Items 0001-0002) $________________
TOTAL OPTION OFFER (Items 0003) $________________
TOTAL BASE + OPTION OFFER (Items 0001-0003) $________________
***Note: Option 1 Includes external bridge crane and associated sitework, erosion control, and utilities for the crane. Includes work shown on Sheet CD105, CS105, CG105, CP105, CE105, CE110, CE115, MS105, MS501, and associated details and specifications of these sheets. Work on CU105 and underground electric on Sheet ES101, ES102 is in Base CLIN 0002. Site demolition, erosion control and other utilities required for construction of base bid items are to be included in CLIN 0002.
Section 00 20 00 - Instructions for Procurement
ADDITIONAL NOTES TO OFFERORS
1. Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at:
www.projnet.org\projnet Bidder Inquiry Key: 5VWBVR-NG5ZG8
All questions regarding this solicitation must be submitted in writing through ProjNet no later than 10 calendar days prior to the date established for receipt of proposals as shown in this solicitation. The Government reserves the right to not respond to questions/inquiries received after this date. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register in the system. To self-register, go to the web page, click bid tab, select bidder inquiry, select agency USACE, enter the key for this solicitation below, and your email address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question after it has been processed by our technical team.
2. If an Offeror believes the requirements in this solicitation contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted to the Contracting Officer through the contracting POC identified in this solicitation.
3. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals in response to the RFP, the Government may request a price breakdown of the Contract Line items.
The Government will provide details on where and how to send the breakdown if required. This information will not be needed sooner than three working days after the proposal submission due date. This information is not an opportunity for a firm to revise its non-price or price proposal.
Firms are cautioned to distribute direct costs, such as material, labor equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations.
Section 00 21 00 - Instructions
PROPOSAL & BID BOND SUBMISSION:
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE
LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE
WILL NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT
AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS:
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format.
Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN18R3003_COMPANY NAME_VOLUME I
W912HN18R3003_COMPANY NAME_VOLUME II
Submit proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).
[Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e-mail addresses for the recipients. For this solicitation, the recipients will be the PCO and Contract Specialist. The Contract Specialist for this project is Ms. Crystal E. North, whose e-mail address is Crystal.E.North@usace.army.mil. The PCO for this project is Mr. Andrew K. Page, whose e-mail address is Andrew.K.Page@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and the confirmation emails you receive from AMRDEC.
Proposal Due Date and Time: See Block 13 of the SF1442
Request For Proposal No: W912HN18R3003 Title of Project: Training Support Facility, Fort Benning, GA
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and PCO by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
DIRECTIONS FOR SUBMITTING BID BOND:
In accordance with FAR Clause 52.228-1, Bid Guarantee in the solicitation, Offerors are required to submit an original bid bond in accordance with these instructions and by the time and date established for the receipt of proposals. The Bid Guarantee shall be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond shall be cause for rejection of an Offeror’s proposal. Bid Bonds must be delivered by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service. All Bid Bonds must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN18R3003 Title of Project: Training Support Facility, Fort Benning, GA
Bid Bonds must be addressed to:
U.S, Army Engineer District, Savannah ATTN: CECT-SAS-E (Crystal E. North) 100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
The date and time of delivery established by commercial carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock and main entry for the building do not receive bid bonds and will contact Mailroom personnel. Once Mailroom Personnel are available, the bid bonds will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid bonds. Completion of these actions will constitute delivery of the bid bonds by the date and time designated for receipt.
Offerors that use U.S. Mail or U.S. Express Mail must allow sufficient time for the bid bonds to be received by Mailroom personnel by the time specified. Offerors are responsible for allowing sufficient time for the bid bonds to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated. The Government will not be responsible for bid bonds delivered to any location or to anyone other than those designated.
Offerors are responsible for ensuring that bid bonds are submitted so as to reach the office designated for receipt. Offerors are responsible for allowing sufficient time for the bid bonds to be physically received and processed by Mailroom personnel in accordance with the information provided.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
SECTION V
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for the construction of a Training Support Facility at Fort Benning, GA. This will be a Firm-Fixed Price (FFP) contract.
1.2 The purpose of the Source Selection Plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Contracting Officer (KO) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2.)
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal. The requirement will be advertised under full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors WILL NOT be evaluated for any factor. Information about firms that are part of a joint venture will be considered when the joint venture is the Offeror.
2.3 Offerors shall submit their proposal to the address shown Proposal and Bid Bond Submission Instructions in Section 00 21 00.
3. GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents.
Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Electronic Submissions.
3.3.1 Written material shall be on 8 ½ x 11 inch paper size, using no smaller than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
3.3.2 Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offeror’s Company name and the volume (i.e. W912HN18R3003 USACE_Volume_I.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
3.4 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I Price/Representations/Certifications
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00 10 00 – Proposal Pricing Schedule
TAB C - Section 00 45 00– Representations and Certifications
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section.
Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture, it must be submitted. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB E – Bid Bond – See Clause 52.228-1 and any other notes, for required bond information.
The Offeror is required to submit a bid bond. Photocopied or electronically scanned bid bonds are not acceptable and may lead to the rejection of the proposal as non-responsive. Offerors shall use the most recent form SF24 (REV. 8/2016).
TAB F – Financial Information (the last three years financial statements, Annual Reports, Dun and Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. The Offeror shall also provide a Subcontracting Plan in accordance with FAR Clause 52.219-9, Small Business Subcontracting Plan.
TAB G – Joint Venture Agreement, if applicable. See paragraph 2.1
VOLUME II Technical Submittal
TAB H – Past Performance Questionnaires Summary Sheet (Attachment 2) and Past Performance Questionnaires (PPQ) (Attachment 3). These forms will be used to evaluate both FACTOR 1 Corporate Relevant Specialized Experience and FACTOR 2 Past Performance.
4. FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE
4.1 SUBMISSION REQUIREMENTS:
4.1.1 Using the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaires (PPQ) (Attachment 3), the Offeror shall demonstrate experience in performing projects meeting the requirements described in paragraphs below. If the Offeror is a joint venture, the projects did not have to have been performed by the joint venture submitting the offer. These projects could have been performed by either company in the joint venture.
Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, were the prime contractor and played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs and continuation sheet, if used, submitted for this Factor clearly describe the relevant characteristics of the project.
4.1.2 Offerors shall submit a minimum of three (3) and a maximum of five (5) recent, relevant projects. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. The projects submitted for consideration in Factor 1 shall be the same projects submitted for evaluation in Factor 2.
4.1.3 Recent, relevant projects:
4.1.3.1 New vertical construction of any of the following facilities: warehouses, maintenance facilities, hangars, administrative/office buildings, training/classroom buildings, dining facilities, barracks, headquarters/operational facilities, hospitals, or schools. A minimum contract value of $10 million and have been successfully completed, or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum contract value. Each project shall demonstrate experience with all of the following elements: site work to include site utilities and storm water management; structural steel assembly; building HVAC systems; fire suppression; fire alarm system, and building electrical and telecommunications.
4.1.4 The project description on the PPQ shall clearly describe the projects. The Government will not assume any project characteristics that are not specifically identified and described.
The Offeror may attach a continuation sheet to the PPQ if needed consisting of one (1) page to describe how the project contained the elements described above and meets the requirements of this factor. The submission must contain sufficient information for the government to determine whether the project meets the requirements of 4.1.3.1.
4.1.5 The PPQ must provide a Point of Contact for the Client. If the Government is unable to verify the information provided on the PPQs with the client Point of Contact, or by other sources available (e.g. CPARS), the Government reserves the right to disregard that project when evaluating the Offeror’s experience.
4.2 EVALUATION CRITERIA
4.2.1 The Offeror’s submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. To meet the minimum requirements for this Factor:
A minimum of three (3) projects must meet the requirements of paragraph 4.1.3.1.
4.2.2 Rating Methodology for Factor 1. Factor 1 will be rated using the following adjectival descriptions:
ACCEPTABLE - Proposal meets the requirements of the solicitation.
UNACCEPTABLE – Proposal does not meet the requirements of the solicitation.
5. FACTOR 2 – PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS
5.1.1 The Offeror shall demonstrate a record of performance on each project submitted for Factor 1. The information submitted through the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaire (PPQ) (Attachment 3) for Factor 1 will be evaluated for this factor. The PPQ is provided for the Offeror to submit to the client (Point of Contact) for each project the Offeror includes in its proposal. Offeror must ensure correct phone numbers and email addresses are provided for the client Point of Contact.
Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. While it is important to submit a PPQ signed by the client if the Offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ which will contain contract and client information and submit it with the proposal. The Government will call and confirm information provided by the Offeror on the PPQs with the points of contact, to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. If the Government is unable to verify the information in the PPQ, it may be disregarded. Offerors are cautioned that the PPQ must contain sufficient information for the government to determine whether the project contains the elements of work similar to this requirement as described in Factor 1. One (1) additional page may be used for each PPQ if needed to include this information as stated in Factor 1.
Project Information submitted in a format other than or in lieu of the PPQ (to include CCASS or CPARS) will not be considered. CCASS or CPARS will be obtained by the Government for the projects submitted. Offerors shall not incorporate by reference into the proposal, PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. The Government will consider any available CCASS or CPARS information on the relevant projects submitted. In addition, the Government may consider available past performance information on projects not submitted by Offerors’ in response to this solicitation.
5.1.2 Offerors may provide information on problems encountered on the identified contracts and the Offeror’s corrective actions.
5.1.3 Using PPQs as described above, Offerors shall demonstrate the quality of performance information on projects determined by the government to be recent and relevant from Factor 1.
5.1.4 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
5.2 EVALUATION CRITERIA
5.2.1 Past Performance Evaluation. The past performance evaluation results in an assessment of the probability that the Offeror will meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. The projects submitted for Factor 1 will be evaluated to assess the Government’s confidence in the ability of the Offeror to meet the solicitation requirements.
5.2.2 Performance Evaluation. The Government will evaluate the quality of the Offeror’s past performance using the sources available to it including but not limited to the projects identified by the Offeror and submitted on the PPQs and any additional information about those projects received from references and CPARS. The Government will consider any available CCASS or CPARS information on the relevant projects submitted by the Offeror under this factor. The Government reserves the right to determine an Offeror’s past performance to be Unacceptable if negative past performance information on relevant projects performed by the Offeror but not submitted in response to this solicitation is discovered.
5.2.3 The Government will consider past performance of the offeror and the past performance information submitted on members of a joint venture.
5.2.4 Rating Methodology for Factor 2. The Government will consider the recent and relevant past performance information to assign a past performance evaluation rating. To be rated “Acceptable” in this factor, Offerors must receive ratings of Satisfactory or better in each Rating Methodology for Factor 2. The Government will consider the recent and relevant past performance information to assign a past performance evaluation rating. To be rated “Acceptable” in this factor, Offerors must receive ratings of Satisfactory or better in each *Section of all recent, relevant PPQs submitted by the Offeror and on recent, relevant CPARs reviewed by the government. Section in a CPARS evaluation are Quality, Schedule, Cost Control (if applicable), Management, Utilization of Small Business, Regulatory Compliance, and Other Areas such as but not limited to Safety. The elements within each Section are not considered in determining whether an offeror is Acceptable for this factor. Projects for which an evaluation was performed under the older CCASS system, only the Overall Rating will be considered. Sections in a PPQ is the individual element within each Section. For example Quality Section is not rated however each question/statement such as a) Quality of technical data/report preparation efforts; b) Ability to meet quality standards specified for technical performance; c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance; d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) is rated and will be considered individually in the evaluation of this factor. This factor will be rated using the following adjectival descriptions:
Past Performance Ratings
Rating Description
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
5.2.5 If no recent and relevant performance record is available or information is so sparse that no meaningful rating can be reasonably assigned, this factor will be assigned a rating of “Unknown” (FAR 15.305 (a)(2)(iv)). In the context of acceptability/unacceptability, “unknown” shall be considered “Acceptable”.
6. EVALUATION FACTORS
6.1 NON-COST FACTORS:
FACTOR 1 Corporate Relevant Specialized Experience
FACTOR 2 Past Performance
6.2 PRICE. Price analysis will be performed in accordance with FAR 15.404-1(b), to determine fairness and reasonableness. Reasonableness will be established using available pricing tools such as historical price information, price competition information, or the Independent Government Estimate. Proposals will be reviewed to determine price submission errors or omissions and areas requiring clarification.
7. OVERALL PROPOSAL EVALUATION
7.1 The evaluation will be based on the content of the proposal, and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
7.2 Each member of the SSEB will independently consider all information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document whether the Offeror meets or does not meet the minimum requirements in order to support the assigned rating for each factor. Comments are required for all ratings.
7.3 The Government will evaluate the proposals beginning with the lowest price to the highest price until it reaches the first responsive and responsible Offeror who achieves Acceptable ratings in both factors. That Offeror will be selected for award and the remainder of the proposals will not be evaluated.
8. EXCEPTIONS. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
9. RESTRICTIONS. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
10. BASIS FOR AWARD
10.1 Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, and technical acceptability. A responsibility determination will be made in accordance with Federal Acquisition Regulation (FAR) 9.1.
10.2 In order to determine which proposal(s) represent the best value, proposals will be evaluated against all source selection criteria in this RFP.
10.3 Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. In order for a proposal to be considered awardable, there must be an “acceptable” rating in all non-price factors. The Government will make award to the lowest priced Offeror who is deemed responsive and whose price has been determined fair and reasonable. Reasonableness will be established by using price analysis in accordance with FAR 15.404-1(b), to determine fairness and reasonableness. Pricing tools such as historical price information, price competition information, or the Independent Government Estimate will be used to determine reasonableness.
10.4 The Government reserves the right to reject any and all offers.
10.5 Offerors are reminded to include their best technical and price terms in their initial offer.
ATTACHMENT 1
PROPOSAL DATA SHEET
PROJECT TITLE: Training Support Facility
PROJECT LOCATION: Fort Benning, GA
1. Name of Firm: Address:
Phone:
Fax:
E-mail:
DUNS # (used for accessing CCASS, PIPRS)
2. AUTHORIZED NEGOTIATORS. FAR 52.215-11
The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).
Name of Person Authorized to Negotiate: ________________________________________ Negotiator’s Address: ________________________________________________________ Negotiator’s Telephone: __________________________________ Negotiator’s E-mail:______________________________________
ATTACHMENT 2
PAST PERFORMANCE QUESTIONNAIRE SUMMARY SHEET
Training Support Facility, Ft Benning, GA
The Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet to provide a summary of the PPQs included in this proposal. The summary sheet shall include information for all columns.
No.
Project Name
Contractor
Contract #
Construction % Complete @ Time of Solicitation
Scheduled
Completion Date
ATTACHMENT 3
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: ___ Prime Contractor ___Sub Contractor __Joint Venture ___ Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ___ Firm Fixed Price ___Cost Reimbursement ___ Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work: ___High ___ Med ___ Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Organization:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS
QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE
OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH
THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE
SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY
ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.
HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.
PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE
GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL
INFORMATION ON THIS FORM.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner.
A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified.
Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and…