A.02.02__Q&A__W912HN18Q5022_Amendment_0001.pdf

PDF 92 KB Posted

Attached to
Provide and Install Modular Facility, Fort Gordon, GA
Solicitation number
W912HN18Q5022
Issued by

About this file

Q&A W912HN18Q5022 Amendment 0001

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912HN18Q5022 Amendment 0001

Provide and Install Modular Facility, Fort Gordon, GA

Request for Information

1. Are alternative trailer sizes allowed, as long as the same Square Footage is met?

Answer: Please see COMBINED SYNOPSIS/SOLICITATION W912HN18Q5022 Amendment 0001. “Description of Requirement: A lease of modular space facility, to allow for employees to continue with daily duties. Contractor shall provide and install 1- story modular administrative facility as indicated in sample below. Overall administrative facility dimension shall be approximately 80 64’-0” x 24’-0” and shall provide approximately 1,920 1,536 square feet of space with bedrooms, kitchen/dining room, gathering area, office and bathrooms for (Men and Women) modular swing space.”

2. Is an EPDM roof acceptable?

Answer: Yes, an EPDM roof is acceptable. EPDM is an extremely durable synthetic rubber roofing membrane (ethylene propylene diene terpolymer).

3. Could USACE confirm the total footprint of the site that we are able to configure the modular space on?

Answer: Please see COMBINED SYNOPSIS/SOLICITATION W912HN18Q5022 Amendment 0001, Page 17 (See Note No. 14 on Drawing and Plan Sheet for Location).

4. Quote due date has been extended.

Submission Requirements: Quotes should be emailed to Mr. Lennie K. Mattis at Lennie.K.Mattis@usace.army.mil by 31 August 4 September 2018 at 2:00 p.m. Eastern Time. Please CC Mr. Bruce Helms at Bruce.A.Helms@usace.army.mil

File details come from the government source that posted it.