W912HN18Q5022 Amendment 0006

Provide and Install Modular Facility, Fort Gordon, GA

Request for Information

1. The last CD101 was just like the previous with exception it states “Approximate aerial routing of communication line from Bldg. 13804 to swing space”-what does this mean?

What is government requesting us to do? It looks like we are to install the communications line from one place to modular…what type of wire? Are poles existing that we are installing on or do we provide those? How high? Do we connect ends?

Answer: Install new OSP Fiber Optic and Copper Cables from communications room located on northeast corner of Building 13804 to modular unit. Cables shall be aerial routed connecting to existing poles located adjacent to 8th Ave. Cables shall be minimum of 12 strand single mode fiber optic cable and 25 pair PE-89 copper cable (24awg), installed a minimum 18' height above paved surface.

All cabling shall be free from any bends or kinks, end to end. Place ID Labels on both ends of all cables along with labeling within patch panel (FoC) and BET (Building Entrance Terminal (Copper).

Fiber optic cable shall be bi-directionally tested utilizing Fluke 5000 Cable Analyzer w/ Single Mode Adapter or equivalent.

2. Will the contractor be responsible for the portable septic tank cleaning?

Answer: Yes, Contractor will be responsible for the portable septic tank cleaning for the duration of the lease.