W912HN18Q5022 Amendment 0005

Provide and Install Modular Facility, Fort Gordon, GA

Request for Information

1. Is power connected underground or above ground to the unit as mentioned on page 18, #1?

Answer: Power connections are located above Ground.

2. Is the unit being installed on gravel or asphalt? If asphalt, are we responsible for patching only the holes created by the anchors?

Answer: The unit will be installed on asphalt, contractor will be responsible for patching any damage to the asphalt.

3. On sheet cd101 (the only sheet provided) I have the following questions:

A) Drawing, #3-states remove asphalt-legend shows where asphalt is but are we removing entire white area (about 32k sq ft) or just grey area (about 6k sq ft). It refers to drawing CP101, but the drawing is not in the solicitation. How thick is asphalt?

Answer: Not in the Temporary Facility Contract. Drawing is to show location of existing utilities only.

B) How thick are items 6, 8, and 10 in the drawing? (Concrete pad, concrete apron, and AC Pad?

existing utilities only.

C) Refer to drawings, #11-where is CS101?

existing utilities only

D) The last CD101 was just like the previous with exception it states “Approximate aerial routing of communication line from Bldg. 13804 to swing space”-what does this mean?

Answer: Drawing is meant to illustrate approximate routing from the temporary facility to the existing communication room inside fire station.

What is government requesting us to do? It looks like we are to install the communications line from one place to modular…what type of wire?

Answer: Temporary copper communication line from the existing communication room to the temporary facility.

Are poles existing that we are installing on or do we provide those?

Answer: Run from temporary facility to existing communication room in Bldg. 13804 utilizing existing poles.

How high? Do we connect ends?

Answer: Contractor will be utilizing existing poles. Yes, Communication line ends need to be connected.

4. Contractor to coordinate communication connection point with the Network Enterprise Center (NEC), Mr. Randy Williams at telephone number (706) 294-9916.

After contacting this individual for the communication connection, he stated that this will be part of the government SOW that you will provide and that he does not have a quote for this. Could you please clarify if this work is a responsibility of the government or of the contractor?

Answer: The temporary communications is part of the temporary facilities contract, the Contractor is to coordinate with the NEC, Mr. Williams, prior to initiating the installation of the temporary communication line back to communication room in Bldg. 13804.

Quote due date has been extended. Submission Requirements: Quotes should be emailed to Mr. Lennie K. Mattis at Lennie.K.Mattis@usace.army.mil by 31 August 4 September 17 September 18 September 2018 at 2:00 p.m. Eastern Time. Please CC Mr. Bruce Helms at Bruce.A.Helms@usace.army.mil