Question and Answer Set 2: Repairs to Project #201

General:

Question #1: Legend shows Sheet 4 as Bathrooms and 5 as Stairways. Is there a sheet missing? Please clarify.

Answer #1: Bathrooms are not a part of this project.

Question #2: Is there a fixture schedule to use for pricing?

Answer #2: No.

Question #3: Note 4 refers to 8' drop ceiling with 2X4 Fluorescent fixtures throughout.

Question 3a: This note points to area shown as 3,018 sqft. Is this the only area with new lighting?

Answer #3a: Yes.

Question 3b: Do smaller rooms get new lighting?

Answer #3b: Only as noted in the SOW.

Question #3c: Is there Demo of old lights?

Answer #3c: Only as noted in the SOW

Question #3d: Is the ceiling itself getting replaced?

Answer #3d: No.

Question #3e: Where are the electrical panels located?

Answer #3ae: Several locations. This will require field verification.

Question #3f: Is the building using a Lighting Control Panel for lighting control?

Answer #3f: No.

Question #3g: Is there a spec for the lighting and devices?

Answer #3g: Yes.

Question #3h: New lighting fluorescent or LED?

Answer #3h: LED.

Question #5: Sheet 5

Question #5a: Stairwell Second Floor East, Note 1 is shown twice. Are these different fixture types?

What type are they?

Answer #5a: Yes. Specs should be in the SOW.

Question #5b: Note 3 is shown as surface mount but calls for recessed lighting. Please clarify.

Answer #5b: Surface.

Question #6: In regard to the lobby, it is not "ceramic tile" that needs to be replaced. It is VCT. Please confirm.

Answer #6: Yes – VCT.

Question #7: Request photos of the siding repair, door repair.

Answer #7: Will be provided and posted to FBO as soon as possible.