W81G6751004826
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the specifications (see summary of changes and updated spec areas.)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-15-B-0011
X 9B. DATED (SEE ITEM 11)
16-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2015
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-15-B-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 4
Lock and Dam 7 Guidewall Crib Repair Summary of Changes
Specification Changes:
a) The pole sounding data table is attached to the end of Section 01 00 00.00 13
b) Specification Section 01 78 02.00 10, paragraph 1.1 is changed as follows:
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD‐11 Closeout Submittals Final Low Density Cellular Concrete Placement Quantity; G River Bottom Elevation Measurements; FIO
c) Specification Section 01 78 02.00 10, paragraph 1.2.2 is added as follows:
1.2.2 River Bottom Elevation Measurements
The contractor shall measure the river bottom elevations at each monolith joint on all sides of the guidewall structure prior to the start of any work on the crib structure. These measurements shall be submitted to the Government in tabular form for review and acceptance prior to starting work on the crib structure.
d) Specification Section 03 11 13.00 10 Table of Contents is changed as follows:
Paragraph 3.2.1 Formwork Not Supporting Weight of Concrete is deleted
e) Specification Section 03 11 13.00 10, paragraph 3.2 is changed as follows:
3.2 FORM REMOVAL
All forms shall be completely removed before project completion. Forms shall be removed in a manner which prevents injury to the concrete and ensures the complete safety of the structure. Forms shall not be removed before a compressive strength test result (See Section 03 60 70.00) shows a minimum of 75% of the specified compressive strength is achieved or before seven days after placement, whichever is longer. Any additional concrete compressive strength cylinders and tests the contractor chooses to perform to determine acceptable form removal, beyond those described in Section 03 60 70.00, shall be at no additional cost to the Government. Where forms support more than one concrete placement, the forms shall not be removed until this form removal criteria is met by all supported concrete placements.
W912ES-15-B-0011
The Contractor may request permission to use maturity instrumentation instead of control cylinders to determine the compressive strength of the concrete. ASTM C 1074 procedures shall be used for estimating concrete strength by means of the maturity method. All expenses associated with instrumentation of the concrete and evaluating the strength using maturity relationships shall be the responsibility of the Contractor at no additional cost to the Government.
f) Paragraph 3.2.1 from Specification Section 03 11 13.00 10 has been deleted.
g) Specification Section 03 60 70.00, paragraph 1.2c is changed as follows:
c. Methods used to ensure and confirm:
1. Existing features are not damaged
2. Fill all voids in the rock crib that are accessible from all faces of the crib structure, both known and unknown.
3. Provide a continuous concrete surface flush with the face of the exposed crib structure from the bottom edge of the concrete portion of the guidewall to the surface of the bottom of the river.
4. Any conveyances left in place as embedded are filled with concrete, with no voids remaining.
h) An updated Submittal Register is attached to the end of specification section 01 32 01.00 13
(End of Summary of Changes)