Camp_Buehring_Kuwait_Capabilities_Statement.pdf
PDF 482 KB Posted
- Attached to
- Camp Buehring Electric Line/Rings Federal contract opportunity
- Solicitation number
- W912ER19R0024
About this file
This document contains a capability statement template and related federal contract opportunity notice for electric line and ring construction work at Camp Buehring in Kuwait. The U.S. Army Corps of Engineers Transatlantic Middle East District intends to solicit fixed-price offers for a medium voltage electrical distribution ring and potential additional power lines at Camp Buehring with an estimated value between $1-5 million and a 365-day period of performance. Interested contractors should complete and return the capability statement by May 6th to be considered for the anticipated solicitation, which will utilize full and open competition and a best value tradeoff evaluation. The work involves design, construction, surveying, geotechnical investigation and has a NAICS code of 221122.
Capabilities Statement Camp Buehring Electrical
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Camp Buehring Electric Line/Rings
W912ER-19-R-0024
Capability Statement
SECTION 1. GENERAL
1. Business Name: (Insert Business Name)
2. Business Address: (Insert Business Address)
3. Cage Code: (Insert Cage Code)
4. NAICS Codes: (Insert all applicable NAICS Codes)
5. Responsible Point of Contact:
Name: (Insert Name) Telephone: (Insert Telephone Number) Email: (Insert Email Address)
6. Check All That Apply: Our firm is:
Small business 8(a) small business Veteran-owned small business Service-disabled veteran-owned small business HUBZone small business Small disadvantaged business Women-owned small business concern.
None of the above.
SECTION 2. CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a:
Sole contractor Prime contractor performing at least 50% of the work with subcontractor(s) Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted)
Joint venture with (Insert business name, business size, and cage code).
(See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b). )
SECTION 3. CAPABILITY
1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single task/delivery order is (Insert maximum capacity, in dollars, per task/delivery order annually).
2. If awarded a contract, the maximum aggregate contract capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds is (Insert total contract capacity, in dollars, your firm can perform annually).
3. Our firm is capable of performing/delivering 1 order, 2-5 orders simultaneously.
4. Our firm has performed work in Kuwait:
Yes No
5. Our firm has the necessary documents/permits/certifications required to perform work in Kuwait:
Yes No
6. Our firm has constructed the following facility types/projects:
Check All
That Apply Construction Project
All of the below projects(skip to question 9) Housing/Barracks Dining Facility Equipment/Vehicle Maintenance Facility Operations Facility Administrative/Headquarters Facility Command and Control Facility Communications Center Fire Station Waste Management Complex Training Facility Medical Facility (Clinic/Hospital) Fuel Storage Facility Fuel Distribution and Storage System Munitions Storage Power Plant Utilities Infrastructure RSOI Facilities/Areas Entry/Access Control Points Cargo Handling Areas
Perimeter Fence and Guard Towers Road Construction Airfields: (Runways/Taxiways/Aprons/Ramps) Airfield Support Facilities: (Hangars/Control Towers/etc.)
Passenger/Cargo Terminals Drainage System Projects Water Treatment Facility Electrical Work
7. If awarded a contract, our firm is/ is not capable to perform at least 20% of the cost of the construction and related services.
8. Based on your previous experience, identify the percent work effort you would expect to subcontract.
9. Our firm is performing, or has successfully performed construction of facilities and associated services for the following U.S. or Foreign military commands/facilities/projects:
(Provide name of project location, type of work performed, role of firm (prime, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed. Include no more than two single-spaced, 10 font, 8 1/2" x 11" pages containing this information).
10. Our firm is/ is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.
11. Our firm is/ is not experienced with operating under SPOT requirements.
SECTION 4. RETURN INSTRUCTIONS
After you have completed all sections of the capability statement, please return the form to the Contract Specialist via email at Maria.C.Rodeffer@usace.army.mil. Your response needs to be received no later than 1400 Daylight Eastern Standard Time on May 6, 2019. Information presented is for market research purposes only.
File details come from the government source that posted it. Updated .