About this file

This market research notice seeks capabilities statements from firms interested in constructing a medium voltage electrical distribution ring and additional power lines at Camp Buehring, Kuwait. The U.S. Army Corps of Engineers Transatlantic Middle East District intends to solicit fixed-price offers for the project, which has an estimated value between $1-5 million. Responses are requested by May 6, 2019 to inform development of a request for proposal. The project scope involves designing and building an 11kV ring to provide power to Ring 3, with options to construct additional lines to Rings 1 and 2. Interested firms should have experience working in the Middle East and provide their name, point of contact, address, and DUNS number in capabilities statements submitted to the listed contract specialist by the response deadline. The solicitation will use full and open competition, a best value source selection process, and result in a single fixed-price contract not set aside for small businesses.

Attachment G Cost Breakdown & Proposal Schedule 9 of 10 attachments

View the file

Other files for this federal contract opportunity

Other files attached to Camp Buehring Electric Line/Rings, newest first.
File Type Posted
Drawing_XE-504.pdf PDF
Amendment_0002_Proposal_Schedule_and_Cost_Breakdown_Camp_Buehring.xlsx XLSX spreadsheet
Specifications_Amendment_0002_Camp_Buehring.pdf PDF
W912ER-19-R-0024_Amendment_0002.pdf PDF
Amendment_0002_Cost_Breakdown_Camp_Buehring.pdf PDF
Amendment_0002_Proposal_Schedule_Camp_Buehring.pdf PDF
Attachment_E_Relevancy_Matrix_Rev1.pdf PDF
W912ER19R0024_Amend_01_Camp_Buehring.pdf PDF
Specifications_Camp_Buehring_Amendment_01.pdf PDF
Attachment_F_Past_Performance_Questionnaire_PPQ-0.pdf PDF
Vol_I_W912ER19R0024_Camp_Buehring_Electric_Lines.pdf PDF
Attachment_A_and_B_Financial_Standing_Quest_and_Calc_Self_Performed_Work.pdf PDF
Attachment_D_Construction_Experience_Form.pdf PDF
Attachment_C_Experience_Overview_Sheet.pdf PDF
Vol_III_Drawings_Camp_Buehring_Underground_Electric_Lines.pdf PDF
Attachment_G_Cost_Breakdown_and_Proposal_Schedule_Camp_Buehring.xlsx XLSX spreadsheet
Vol_II_Specifications_Camp_Buehring_Electric_Lines.pdf PDF
Attachment_E_Relevancy_Matrix.pdf PDF
Camp_Buerhing_Underground_Electric_Lines_Specifications.pdf PDF
Underground_Electric_Lines_Camp_Buehring.pdf PDF
Camp_Buehring_Underground_Electric_Lines_Drawings.pdf PDF
Camp_Buehring_Site_Visit_19AUG2019_-_Base_Access_Instruction.docx DOCX document
Camp_Buehring_Site_Visit_-_Map.pdf PDF
Camp_Buehring_Site_Visit_-_Base_Access_Instruction.docx DOCX document
Camp_Buehring_Site_Visit_-_Map.pdf PDF
Camp_Buehring_Kuwait_Capabilities_Statement.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER19R0024 P2# 474411

PROJECT:

Underground Electric Lines

PROPOSER:

LOCATION: Camp Buehring, Kuwait DATE:

Mobilization and Demobilization in accordance with the contract documents

0001AA Mobilization

0001AB Demobilization

Total Price (Items 0001AA - AB)

Construct 11 KV Underground

Electric Lines in accordance with the contract documents

0002AA New 11 KV Cable

0002AB Cable Terminations

Total Price (Items 0002AA - AB)

Construct Packaged Substations in accordance with the Contract

Documents

0003AA Packaged Substation 14

0003AB Packaged Substation 15

0003AC Packaged Substation 16

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

OVERHEAD/

INDIRECT COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

EXHIBIT 1 Page 1 of 3

Underground Electric Lines

PROPOSER:

LOCATION: Camp Buehring, Kuwait DATE:

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

OVERHEAD/

INDIRECT COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

0003AD Packaged Substation 17

Total Price (Items 0003AA to 0003AD)

Site Work in accordance with the

Contract Documents

0004AA Demolition

0004AB Road Crossings

0004AC Site Earthwork

0004AD Site Improvements

Total Price (Items 0004AA - AD)

Option #1 Construct Packaged

Substation 18 in accordance with the

Contract Documents

0005AA Packaged Substation 18

TOTAL BASE BID PRICE (ITEMS 0001 - 0004)

Optional Bid Items

EXHIBIT 1 Page 2 of 3

Underground Electric Lines

PROPOSER:

LOCATION: Camp Buehring, Kuwait DATE:

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

OVERHEAD/

INDIRECT COST

PROFIT

TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

Total Option #1 Price (Item(s) 0005AA)

Option #2 Construct Low Voltage

Cable Lines in accordance with the

Contract Documents

0006AA Low Voltage (415) Lines

Total Option #2 Price (Item(s) 0006AA)

TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006)

TOTAL OPTIONS PRICE (ITEM(S) 0005-0006)

EXHIBIT 1 Page 3 of 3

PROJECT: Underground Electric Lines

LOCATION: Camp Buehring, Kuwait

ITEM NO. DESCRIPTION QTY UNIT AMOUNT TOTAL

Mobilization and Demobilization in accordance with the contract documents

1 JA

Construct 11 KV Underground Electric

Lines in accordance with the contract documents

1 JA

Construct Packaged Substations in accordance with the Contract Documents

1 JA

Site Work in accordance with the Contract

Documents

1 JA

Option #1 Construct Packaged Substation

18 in accordance with the Contract

Documents

1 JA

Option #2 Construct Low Voltage Lines in accordance with the Contract Documents

1 JA

Base Bid Items

PROPOSAL SCHEDULE

TOTAL OPTIONS PRICE (ITEM(S) 0005-0006)

TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006)

TOTAL BASE BID PRICE (ITEMS 0001 - 0004)

Optional Bid Items

*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"

Attachment G Cost Breakdown Camp Buehring.pdf
Attachment G Proposal Schedule Camp Buehring

File details come from the government source that posted it. Updated .