Attachment_G_Cost_Breakdown_and_Proposal_Schedule_Camp_Buehring.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Camp Buehring Electric Line/Rings Federal contract opportunity
Solicitation number
W912ER19R0024
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

This document includes a cost breakdown spreadsheet and proposal schedule for an underground electric lines project at Camp Buehring, Kuwait, as well as a related federal contract opportunity notice.

The cost breakdown spreadsheet provides labor, equipment, material, and other cost details for base bid items including mobilization, constructing 11kV underground electric lines, packaged substations, and site work, as well as optional items for an additional substation and low voltage lines. The total proposed cost is $8,611,972. The proposal schedule lists the same bid line items and provides the total base bid price of $805,900, with optional items totaling an additional $805,900 and a total base plus options price of $8,611,972.

The federal contract opportunity is a sources sought notice for a medium voltage electrical distribution ring project at Camp Buehring, Kuwait, with an estimated budget between $1-5 million and anticipated period of performance of 365 days. Interested firms are requested to provide capabilities statements by May 6, 2019 to the Army Corps of Engineers contract specialist. The solicitation will utilize full and open competition and a best value tradeoff evaluation.

Attachment G Cost Breakdown & Proposal Schedule Excel Version 10 of 10 attachments

View the file

Other files for this federal contract opportunity

Other files attached to Camp Buehring Electric Line/Rings, newest first.
File Type Posted
Amendment_0002_Cost_Breakdown_Camp_Buehring.pdf PDF
Amendment_0002_Proposal_Schedule_Camp_Buehring.pdf PDF
Specifications_Amendment_0002_Camp_Buehring.pdf PDF
W912ER-19-R-0024_Amendment_0002.pdf PDF
Drawing_XE-504.pdf PDF
Amendment_0002_Proposal_Schedule_and_Cost_Breakdown_Camp_Buehring.xlsx XLSX spreadsheet
Specifications_Camp_Buehring_Amendment_01.pdf PDF
Attachment_E_Relevancy_Matrix_Rev1.pdf PDF
W912ER19R0024_Amend_01_Camp_Buehring.pdf PDF
Attachment_C_Experience_Overview_Sheet.pdf PDF
Vol_III_Drawings_Camp_Buehring_Underground_Electric_Lines.pdf PDF
Attachment_A_and_B_Financial_Standing_Quest_and_Calc_Self_Performed_Work.pdf PDF
Attachment_D_Construction_Experience_Form.pdf PDF
Vol_II_Specifications_Camp_Buehring_Electric_Lines.pdf PDF
Attachment_E_Relevancy_Matrix.pdf PDF
Attachment_G_Cost_Breakdown_and_Proposal_Schedule_Camp_Buehring.pdf PDF
Attachment_F_Past_Performance_Questionnaire_PPQ-0.pdf PDF
Vol_I_W912ER19R0024_Camp_Buehring_Electric_Lines.pdf PDF
Camp_Buerhing_Underground_Electric_Lines_Specifications.pdf PDF
Underground_Electric_Lines_Camp_Buehring.pdf PDF
Camp_Buehring_Underground_Electric_Lines_Drawings.pdf PDF
Camp_Buehring_Site_Visit_-_Map.pdf PDF
Camp_Buehring_Site_Visit_19AUG2019_-_Base_Access_Instruction.docx DOCX document
Camp_Buehring_Site_Visit_-_Base_Access_Instruction.docx DOCX document
Camp_Buehring_Site_Visit_-_Map.pdf PDF
Camp_Buehring_Kuwait_Capabilities_Statement.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Schedule

PROPOSAL SCHEDULE
RFP:W912ER19R0024P2#474411
PROJECT:Underground Electric Lines
LOCATION:Camp Buehring, Kuwait12-Aug-08
ITEM NO.DESCRIPTIONQTYUNITAMOUNTTOTALTOTAL
Base Bid Items
0001Mobilization and Demobilization in accordance with the contract documents1JA
0002Construct 11 KV Underground Electric Lines in accordance with the contract documents1JA$$$
0003Construct Packaged Substations in accordance with the Contract Documents1JA
0004Site Work in accordance with the Contract Documents1JA
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
Optional Bid Items
0005Option #1 Construct Packaged Substation 18 in accordance with the Contract Documents1JA$$$
0006Option #2 Construct Low Voltage Lines in accordance with the Contract Documents1JA
TOTAL OPTIONS PRICE (ITEM(S) 0005-0006)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006)$805,900

*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS" $805,900

$8,611,972

$805,900

$805,900

$805,900

$8,611,972

$8,611,972

$8,611,972

&9&P of &N

Cost Breakdown Sheet

COST BREAKDOWN
RFP:W912ER19R0024P2#474411
PROJECT:Underground Electric LinesPROPOSER:
LOCATION:Camp Buehring, KuwaitDATE:
ITEMDESCRIPTIONLABOR MAN-HOURSDIRECT LABOR COSTDIRECT EQUIPMENT COSTDIRECT MATERIALS COSTSUB CONTRACTOR COSTTOTAL DIRECT COSTJOOHHOOHBONDOVERHEAD/ INDIRECT COSTPROFITTOTAL PROPOSED COST
0001Mobilization and Demobilization in accordance with the contract documents
0001AAMobilization
0001ABDemobilization
Total Price (Items 0001AA - AB)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
0002Construct 11 KV Underground Electric Lines in accordance with the contract documents
0002AANew 11 KV Cable
0002ABCable Terminations
Total Price (Items 0002AA - AB)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
0003Construct Packaged Substations in accordance with the Contract Documents
0003AAPackaged Substation 14
0003ABPackaged Substation 15
0003ACPackaged Substation 16
0003ADPackaged Substation 17
Total Price (Items 0003AA to 0003AD)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
0004Site Work in accordance with the Contract Documents
0004AADemolition
0004ABRoad Crossings
0004ACSite Earthwork
0004ADSite Improvements
Total Price (Items 0004AA - AD)
TOTAL BASE BID PRICE (ITEMS 0001 - 0004)
Optional Bid Items
0005Option #1 Construct Packaged Substation 18 in accordance with the Contract Documents
0005AAPackaged Substation 18
Total Option #1 Price (Item(s) 0005AA)
0006Option #2 Construct Low Voltage Cable Lines in accordance with the Contract Documents
0006AALow Voltage (415) Lines
Total Option #2 Price (Item(s) 0006AA)
TOTAL OPTIONS PRICE (ITEM(S) 0005-0006)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006)

&"Arial,Bold"&12EXHIBIT 1 Page &P of &N

File details come from the government source that posted it. Updated .