This document contains an amendment to a proposal schedule and cost breakdown for an underground electric lines project at Camp Buehring in Kuwait. The amendment provides pricing details for base bid items including mobilization, construction of 11kV underground electric lines and packaged substations, and site work, with a total base bid price of $8,611,972. Optional items include additional work on packaged substations and low voltage lines, with a total optional price of $805,900 and potential maximum total project price of $8,611,972 if all options are exercised. The cost breakdown sheet further specifies labor, equipment, material, and other costs associated with each item.
A related federal contract opportunity seeks responses for solicitation number W912ER19R0024 to construct a medium voltage electrical distribution ring and potential additional power lines at Camp Buehring, Kuwait. The estimated budget range for the project is $1-5 million and responses were due by May 6, 2019. The U.S. Army Corps of Engineers district in the Middle East intends to use full and open competition and best value tradeoff for a firm-fixed price contract.
Amendment 0002 Proposal Schedule and Cost Breakdown Excel Version
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | ||||
| RFP: | W912ER19R0024 | P2# | 474411 | |
| PROJECT: | Underground Electric Lines | |||
| LOCATION: | Camp Buehring, Kuwait | 12-Aug-08 |
| ITEM NO. | DESCRIPTION | QTY | UNIT | AMOUNT | TOTAL | TOTAL | ||
| Base Bid Items | ||||||||
| 0001 | Mobilization and Demobilization in accordance with the contract documents | 1 | JA | |||||
| 0002 | Construct 11 KV Underground Electric Lines in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0003 | Construct Packaged Substations in accordance with the Contract Documents | 1 | JA | |||||
| 0004 | Site Work in accordance with the Contract Documents | 1 | JA | |||||
| TOTAL BASE BID PRICE (ITEMS 0001 - 0004) | ||||||||
| Optional Bid Items | ||||||||
| 0005 | Option #1 Construct Packaged Substation 18 in accordance with the Contract Documents | 1 | JA | $ | $ | $ | ||
| 0006 | Option #2 Construct Low Voltage Lines in accordance with the Contract Documents | 1 | JA | |||||
| TOTAL OPTIONS PRICE (ITEM(S) 0005-0006) | ||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006) | $805,900 |
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS" $805,900
$8,611,972
$805,900
$805,900
$805,900
$8,611,972
$8,611,972
$8,611,972
&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN | |||||||||||||
| RFP: | W912ER19R0024 | P2# | 474411 | ||||||||||
| PROJECT: | Underground Electric Lines | PROPOSER: | |||||||||||
| LOCATION: | Camp Buehring, Kuwait | DATE: | |||||||||||
| ITEM | DESCRIPTION | LABOR MAN-HOURS | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | JOOH | HOOH | BOND | TOTAL OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| 0001 | Mobilization and Demobilization in accordance with the contract documents |
| 0001AA | Mobilization |
| 0001AB | Demobilization |
| Total Price (Items 0001AA - AB) | |
| 0002 | Construct 11 KV Underground Electric Lines in accordance with the contract documents |
| 0002AA | New 11 KV Cable |
| 0002AB | Cable Terminations |
| Total Price (Items 0002AA - AB) | |
| 0003 | Construct Packaged Substations in accordance with the Contract Documents |
| 0003AA | Packaged Substation 14 |
| 0003AB | Packaged Substation 15 |
| 0003AC | Packaged Substation 16 |
| 0003AD | Packaged Substation 17 |
| Total Price (Items 0003AA - 0003AD) | |
| 0004 | Site Work in accordance with the Contract Documents |
| 0004AA | Demolition |
| 0004AB | Road Crossings |
| 0004AC | Site Earthwork |
| 0004AD | Site Improvements |
| Total Price (Items 0004AA - AD) | |
| TOTAL BASE BID PRICE (ITEMS 0001 - 0004) | |
| Optional Bid Items | |
| 0005 | Option #1 Construct Packaged Substation 18 in accordance with the Contract Documents |
| 0005AA | Packaged Substation 18 |
| 0005AB | Site Civil Work associated with Construction of Packaged Substation 18 |
| Total Option #1 Price (Item(s) 0005AA - 0005AB) | |
| 0006 | Option #2 Construct Low Voltage Cable Lines in accordance with the Contract Documents |
| 0006AA | Low Voltage (415) Lines |
| 0006AB | Site Civil Work associated with Construction of Low Voltage (415) Lines |
| Total Option #2 Price (Item(s) 0006AA - 0006AB) | |
| TOTAL OPTIONS PRICE (ITEM(S) 0005-0006) | |
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0006) |